China's First 10,000-ton Photovoltaic Green Hydrogen Pilot Project Now Fully Built and Put into Production
- None.
- None.
The Sinopec Xinjiang Kuqa Green Hydrogen Pilot Project will produce an annual green hydrogen output of 20,000 tons
KUQA,
The green hydrogen produced by the Project will supply to Sinopec Tahe Petrochemical to replace the existing natural gas and fossil energy used in hydrogen production, realizing the low-carbon development of modern oil processing and green hydrogen coupling.
The Project is
With a focus on hydrogen transportation and green hydrogen refining, Sinopec is accelerating its hydrogen development with the establishment of more than 100 hydrogen refueling stations, owning and operating the largest number of hydrogen refueling stations in the world to date.
In the field of green hydrogen refining, Sinopec has been vigorously advancing centralized wind power and photovoltaic development, laying out mega-scale projects integrating renewable energy power generation, hydrogen production, storage, and utilization.
In addition to the Project, Sinopec's green hydrogen project in Ordos, which will produce 30,000 tons annually began construction in February 2023, while the Ulanqab project is now in the planning stage. Towards the "dual-carbon" goals, Sinopec is committed to reducing carbon emissions and continually supporting and promoting green, low-carbon development.
View original content to download multimedia:https://www.prnewswire.com/news-releases/chinas-first-10-000-ton-photovoltaic-green-hydrogen-pilot-project-now-fully-built-and-put-into-production-301914701.html
SOURCE SINOPEC
FAQ
What is the Sinopec Xinjiang Kuqa Green Hydrogen Pilot Project?
What are the benefits of the project?