O3 Mining Expands Marban Underground Mineralization
O3 Mining Inc. has updated its 250,000 metre drilling program at the Marban and Alpha properties in Val-d'Or, Québec, targeting gold resource expansion. Significant findings include multiple high-grade gold intercepts, such as 37.6 g/t Au over 1.2 metres in hole O3MA-21-042. The company aims to convert and expand its current resource of 2.4 million ounces measured and indicated. As part of a robust strategy, O3 Mining plans to advance the Marban project to production by 2026, continuing aggressive exploration efforts.
- Significant gold intercepts reported, enhancing potential resource base.
- Plans to advance the Marban project to production by 2026.
- Well-funded 250,000 metre drilling program indicates strong commitment to resource expansion.
- None.
TSXV: OIII | OTCQX: OIIIF - O3 Mining
TORONTO, June 8, 2021 /PRNewswire/ - O3 Mining Inc. (TSXV: OIII) (OTCQX: OIIIF) ("O3 Mining" or the "Corporation") is pleased to provide an update on its well-funded 250,000 metre drilling program at its Marban and Alpha properties in Val-d'Or, Québec, Canada seeking to convert, expand, and discover new gold resources. The company has reported 18 holes in this release from the Marban, Gold Hawk, North and Orion zones.
Marban Underground
Drilling Highlights:
- 37.6 g/t Au over 1.2 metres in hole O3MA-21-042; Marban underground zone on the Marbenite shear that remains open at depth
- 4.1 g/t Au over 4.4 metres in hole O3MA-21-044; 3.8 g/t Au over 3.9 meters in hole O3MA-21-044-W1; expansion of Marban underground to the east
- 4.6 g/t Au over 3.2 metres in hole O3MA-21-045; underexplored dykes north of the Marban pit
A 3D-model of the Marban project is available on the Company's website at: https://o3mining.com/presentations/drill-results
Drilling has returned multiple high-grade intersections at Marban Underground located below a depth of 200 vertical metres and outside the current underground mine scenario outlined in the Preliminary Economic Assessment ("PEA") released on September 08, 2020.
"Historically, the Val-d'Or camp has seen the economic benefits of underground mines, which can extend to depths of 3 kilometres below surface. Today's drilling results demonstrate resource and excellent potential mine plan expansion at Marban at depth through our aggressive exploration program further adding to our goal of putting Marban into production with both an open pit and underground mine", said O3 Mining's President and Chief Executive Officer, Mr. Jose Vizquerra.
Table 1: Drill Hole Intercepts (only intercepts above 5 g/t Au * m are reported, cut-off 1.0 g/t Au and below 200 vertical metres)
Drill Hole | From | To | Interval | Au (g/t) | Zone |
O3MA-21-042 | 581.5 | 582.7 | 1.2 | 37.6 | Marban |
O3MA-21-044 | 392.0 | 396.4 | 4.4 | 4.1 | |
O3MA-21-044-W1 | 391.6 | 395.5 | 3.9 | 3.8 | |
O3MA-21-045 | 265.8 | 269.0 | 3.2 | 4.6 | |
O3MA-20-009 | 341.3 | 342.8 | 1.5 | 4.3 | Gold Hawk |
O3MA-20-015 | 443.0 | 445.0 | 2.0 | 3.1 | |
O3MA-20-021 | 468.0 | 470.8 | 2.8 | 4.3 | |
and | 475.8 | 480.0 | 4.2 | 1.8 | |
and | 703.2 | 704.0 | 0.8 | 9.3 | |
O3MA-21-030 | 314.2 | 315.0 | 0.8 | 8.0 | |
O3MA-21-029 | 282.0 | 283.5 | 1.5 | 5.1 | North |
and | 307.6 | 308.7 | 1.1 | 5.0 | |
O3MA-21-037 | 338.0 | 339.2 | 1.2 | 5.8 | |
and | 617.0 | 618.0 | 1.0 | 5.5 | |
O3MA-20-010 | 354.4 | 357.4 | 3.0 | 1.9 | Orion |
and | 588.1 | 588.6 | 0.5 | 29.6 | |
O3MA-20-022 | 289.5 | 291.0 | 1.5 | 6.9 | |
and | 486.5 | 488.0 | 1.5 | 24.1 |
Figure 1: Marban Project Drilling Map
Drilling Update
The Corporation drilled 86,000 metres during 2019 and 2020 on its Val-d'Or properties testing for Potential Economic Material ("PEM") with 100-metre step-outs aiming to expand current resources of 2.4 million ounces measured and indicated (62.0 Mt @ 1.22 g/t Au)1 and 1.5 million ounces inferred (20.2 Mt @ 2.27 g/t Au)1 and make new discoveries. O3 Mining expects to release more drilling results from its 2021 winter program at Alpha within the next few weeks.
Figure 2: Marban and Alpha Properties Overview
Marban – Deposit Development
The Marban project is in the heart of the Malartic gold mining camp. It covers 7,525 hectares, and is located 12 kilometres from the Canadian Malartic Mine. The Marban PEA outlined production of an average 115,000 ounces of gold per year over the 15.2 year mine life.
Drilling at Marban has focused on expanding mineralization in and outside of the proposed PEA pit areas, as well as discovering new mineralization for an underground mining scenario. An 80,000 metre drill program is being executed this year, with 20,091 metres drilled so far. There will be up to eight drill rigs testing for PEM, as well as, aiming to convert resources from Inferred to Measured and Indicated, to ultimately become part of Marban's maiden mineral reserve.
A PEA was completed on the project in 2020, and a Pre-Feasibility Study ("PFS") is due to be completed in 2022 as the next step to advance the project to production. O3 Mining aims to become a leading gold producer and put the Marban project into production by 2026.
Alpha – Advanced Exploration
The Alpha property is located 8 kilometres east of Val-d'Or, Québec, and 3 kilometres south of the El Dorado Lamaque Mine. The property covers more than 7,754 hectares and includes 20 kilometres of the prolific Cadillac Break. O3 Mining has an option agreement that grants the right to acquire 100 per cent interest in the Aurbel Mill located only 10 kilometres from the Alpha property for C
Drilling at Alpha is at an earlier stage than at Marban and has focused on grassroots exploration, deposit delineation, and resource expansion. A 56,000 metre program is being executed this year with 34,236 metres completed year to date. O3 Mining will have up to three drill rigs testing for new discoveries using its PEM drilling strategy as well as focusing on deposit delineation and expansion of the current resource. Drilling results from Alpha will be released in the coming weeks as soon as assay results become available.
1/ Mineral Inventory: i) Marban Technical Report 2020, ii) Orenada Technical Report 2018, iii) Akasaba Technical Report 2014, iv) Simkar Gold Technical Report 2015, v) East Cadillac Technical Report 2017, vi) Sleepy Technical Report 2014 |
Qualified Person
The scientific and technical content of this news release has been reviewed, prepared, and approved by Mr. Louis Gariepy. (OIQ #107538), VP Exploration, who is a "qualified person" as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").
Quality Control and Reporting Protocols
True width determination is currently unknown but is estimated at 65
About O3 Mining Inc.
O3 Mining Inc., an Osisko Group company, is a gold explorer and mine developer on the road to produce from its highly prospective gold camps in Québec, Canada. O3 Mining benefits from the support, previous mine-building success, and expertise of the Osisko team as it grows towards being a gold producer with several multi-million ounce deposits in Québec.
O3 Mining is well-capitalized and owns a
Cautionary Note Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections, and interpretations as at the date of this news release. The information in this news release about the transaction; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This forward-looking information is based on reasonable assumptions and estimates of management of the Corporation, at the time it was made, involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the companies to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, risks relating to the restart of operations; further steps that might be taken to mitigate the spread of COVID-19; the impact of COVID-19 related disruptions in relation to the Corporation's business operations including upon its employees, suppliers, facilities and other stakeholders; uncertainties and risk that have arisen and may arise in relation to travel, and other financial market and social impacts from COVID-19 and responses to COVID 19. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the parties cannot assure shareholders and prospective purchasers of securities that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Corporation nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Corporation does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
View original content to download multimedia:http://www.prnewswire.com/news-releases/o3-mining-expands-marban-underground-mineralization-301307451.html
SOURCE O3 Mining Inc.
FAQ
What are the recent drilling results from O3 Mining's Marban project reported on June 8, 2021?
What is the current resource status of O3 Mining's projects as of June 2021?
When does O3 Mining plan to put the Marban project into production?
How much drilling has O3 Mining completed in 2021?