Elemental Royalty Corporation provides a portfolio update highlighting progress at several cornerstone and development royalties. At Karlawinda, operator Capricorn Metals reports the expansion remains on track, with the mine producing 30,358 ounces of gold in the March 2026 quarter and targeting an increase in processing capacity to 6.5Mtpa from 4.0Mtpa. Once complete, Karlawinda is expected to produce around 150,000 ounces of gold per year, a roughly 25–30% step-up in output, under Elemental’s uncapped 2% NSR royalty.

Elemental also reports that Laverton’s Beasley Creek has been identified by Genesis Minerals as a key development priority, covered by a total 4% Gross Revenue Royalty. Viscaria has entered the construction phase, targeting first ore in 2028 and about 26,000 tonnes of copper per year at full capacity under Elemental’s 0.5–1% NSR. Diablillos has been approved under Argentina’s Large Investment Incentive Regime and is advancing toward a construction decision later in 2026, where Elemental holds a 1% NSR. At Mactung, a Feasibility Study has commenced with completion targeted in early 2027, supported by a C$61.5 million private placement, and Elemental holds a 4% GRR that can be reduced to 2%.

The update also notes new, often larger operators taking over several royalty-covered assets, including Zijin at Bonikro and Korali-Sud, Mansa Resources at Dugbe, Hudbay Minerals at the Cactus Project, and Bellavista Resources at Pickle Crow, where Elemental’s NSR and GRR interests remain in place.

Positive

  • None.

Negative

  • None.

Insights

Elemental highlights construction and licensing progress across multiple royalty assets while stronger operators assume key projects.

The update shows several operator-led milestones across Karlawinda, Laverton, Viscaria, Diablillos and Mactung. Karlawinda’s expansion toward 6.5Mtpa and roughly 150,000 ounces of gold annually under a 2% NSR could meaningfully lift future royalty volumes once commissioning begins.

Viscaria’s move into construction, targeting 26,000 tonnes of copper per year over 17 years, and Diablillos’ approval under Argentina’s Large Investment Incentive Regime indicate advancing projects but still depend on successful financing, permitting and build-out. Mactung’s Feasibility Study and the C$61.5 million financing support further technical de-risking of this tungsten project.

Ownership changes at Bonikro, Korali-Sud, Dugbe, Cactus and Pickle Crow bring in larger or better-funded operators while leaving Elemental’s NSR/GRR interests intact. The economic benefit ultimately hinges on these counterparties executing mine plans and hitting production targets over the next several years.

Karlawinda March 2026 production 30,358 ounces of gold Output during March 2026 quarter at Karlawinda mine
Karlawinda expanded plant capacity 6.5Mtpa vs 4.0Mtpa Target processing capacity increase under expansion
Karlawinda future annual gold Around 150,000 ounces/year Expected output once expansion is operational
Viscaria copper output 26,000 tonnes/year Expected full-capacity production over 17-year mine life
Mactung private placement C$61.5 million Non-brokered financing to advance Macpass, Mactung and Gayna
Allied acquisition value C$5.5 billion Friendly all-cash transaction by Zijin Gold International
Pickle Crow sale value c.A$86.1 million Aggregate consideration for Bellavista’s acquisition
Bellavista capital raise target Up to A$25 million Planned funding to support drilling and exploration at Pickle Crow
NSR royalty financial
"Elemental holds an uncapped 2% NSR royalty on Karlawinda."
A net smelter return (NSR) royalty is a payment to a rights holder equal to a fixed percentage of the money a mine actually receives from selling refined metal, after the costs of turning ore into a saleable product are taken out. Think of it like a toll collected on each shipment after it’s been cleaned and sold. For investors, NSR royalties matter because they create a steady revenue stream with lower operational risk for the royalty holder, while reducing the owner-operator’s share of project cash flow and affecting project valuation.
Gross Revenue Royalty financial
"Elemental holds a 2% Gross Revenue Royalty ("GRR") on the entire Laverton project"
A gross revenue royalty is a fixed payment calculated as a percentage of a company’s total sales before expenses, paid to a third party such as an investor, landowner or licensor. It matters to investors because it directly reduces the cash a business keeps from each sale—like a toll taken from every dollar of income—affecting profitability, cash flow and the company’s ability to reinvest or pay dividends, and it is paid regardless of whether the business is profitable.
Large Investment Incentive Regime regulatory
"the project has been approved for inclusion under Argentina's Large Investment Incentive Regime ("RIGI")"
Feasibility Study financial
"Fireweed Metals announced the commencement of an updated Feasibility Study"
A feasibility study is an assessment that evaluates whether a proposed project or idea is practical and likely to succeed before investing significant time and resources. It considers factors like costs, potential benefits, and challenges, helping stakeholders decide if moving forward makes sense. Think of it as a detailed plan that gauges if a new venture is worth pursuing.
Defense Production Act regulatory
"supported by the US Department of War as part of the Defense Production Act."
A U.S. law that lets the federal government prioritize, allocate, and financially support the production and supply of goods and services needed for national defense or major emergencies. For investors, it can quickly change a company’s sales outlook and production plans by directing contracts, speeding approvals, or providing subsidies—like a city mayor telling factories which products to make during a crisis—so affected companies may see rapid revenue or cost shifts.
forward-looking statements regulatory
"This news release contains certain "forward-looking statements" and certain "forward-looking information""
Forward-looking statements are predictions or plans that companies share about what they expect to happen in the future, like estimating sales or profits. They matter because they help investors understand a company's outlook, but since they are based on guesses and assumptions, they can sometimes be wrong.

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of April 2026

Commission File Number: 001-42900

Elemental Royalty Corporation
(Translation of registrant's name into English)

10001 W. Titan Road
Littleton, Colorado, United States of America 80125
Phone: +1 (303) 973-8585

(Address and Telephone Number of Registrant's Principal Executive Office)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F ☐      Form 40-F ☒


SUBMITTED HEREWITH

Exhibits

Exhibit Description
  
99.1   News Release dated April 23, 2026


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

  Elemental Royalty Corporation
  (Registrant)
   
Date: April 23, 2026 By: /s/ Rocio Echegaray
    Rocio Echegaray
  Title: Corporate Secretary




ELEMENTAL ROYALTY PROVIDES PORTFOLIO UPDATE

April 23, 2026 - Denver, Colorado: Elemental Royalty Corporation (NASDAQ: ELE, TSX: ELE) ("Elemental") announces continued progress across the portfolio including at cornerstone royalties Karlawinda and Laverton, as well as key development assets Mactung, Diablillos, and Viscaria, further derisking Elemental's near and mid-term revenue profile.

Highlights

  • Material progress on the Karlawinda Expansion Project, expected to deliver 150,000 ounces of gold per year, with commissioning anticipated in Q3 2026
  • Beasley Creek highlighted by Genesis Minerals as a key development priority at Laverton for their upcoming strategic long-term mine plan
  • Viscaria has completed groundworks as the operator ramps up the construction phase of the project, targeting first production in 2028
  • Diablillos has been approved for inclusion under Argentina's Large Investment Incentive Regime, and is advancing toward construction decision later in 2026
  • Feasibility Study commenced at Mactung with completion targeted in H1 2027, leading up to the submission of the mining application in 2027
  • New operators over producing assets Bonikro and Korali-Sud with the acquisition of Allied Gold by Zijin Gold International; at Dugbe, with the acquisition of Pasofino by major shareholder, Mansa Resources; at Cactus with the acquisition of Arizona Sonoran by Hudbay Minerals; and Bellavista's acquisition of Pickle Crow from FireFly Minerals

Karlawinda Expansion Project on Track

At Karlawinda, operator Capricorn Metals (ASX: CMM) ("Capricorn") has reported that the Expansion Project remains on track, with the operation producing 30,358 ounces of gold in the March 2026 quarter while continuing to advance key development works across the expanded processing circuit and associated infrastructure. During the quarter, Capricorn reported that more than 90% of plant site concrete works had been completed, major structural steel and pipework packages had been delivered, CIL tank construction and welding had been completed, and structural, mechanical and piping works across the crushing, milling and CIL areas had advanced materially. Capricorn also reported that earthworks for ROM Pad 2 were largely completed and first ore had been placed for commissioning, TSF 2 embankments had been advanced to the level required for start-up, and the ball mill had been delivered ahead of schedule ahead of commissioning expected to commence in the September 2026 quarter.

Capricorn has previously stated that the expansion is expected to increase total processing capacity at Karlawinda to 6.5Mtpa from the existing 4.0Mtpa plant and lift annual gold production to around 150,000 ounces. On that basis, the expansion is expected to deliver a material step-up in scale at Karlawinda, with annual gold production increasing by approximately 25% to 30% once the expanded circuit is operational.

Elemental holds an uncapped 2% NSR royalty on Karlawinda.

Laverton key project for Genesis

Genesis Minerals (ASX: GMD) ("Genesis") continues to highlight the strategic importance of the Focus assets within its growing eastern hub. Genesis identified Beasley Creek as a key project for Laverton and stated that its updated long-term plan will include the introduction of initial Focus assets into the existing Laverton mill, alongside ongoing studies to expand milling capacity. Current work is focused on drilling, resource re-estimation and pit optimization, led by Beasley Creek as the first development priority.


Genesis also highlighted potential upside across the broader Focus tenure, including additional open pit opportunities at Burtville and Karridale, as well as underground potential with all deposits described as open at depth.

Elemental holds a 2% Gross Revenue Royalty ("GRR") on the entire Laverton project and an additional 2% GRR on certain Laverton claims for a total 4% GRR, including Beasley Creek.

Viscaria enters into construction phase

Gruvaktiebolaget Viscaria (ST: VISC) ("Viscaria") stated that groundworks for the processing plant had already commenced in early 2026 and that key priorities for the year include mine dewatering, completion of dams, securing electrical power and connection to the Malmbanan rail network. Viscaria also disclosed that, subsequent to year-end, it had signed long-lead item and construction-related agreements with Metso and Nordec respectively, and is targeting completion of its structured project financing package by the end of Q2 2026.

Viscaria continues to guide toward first production in 2028. The company's published timetable indicates first ore in 2028, with full production from 2029. At full capacity, Viscaria expects to produce approximately 26,000 tonnes of copper per year over an initial 17 year mine life.

Elemental holds an uncapped 0.5% to 1% NSR royalty on Viscaria.

Diablillos RIGI Approval

At Diablillos, AbraSilver (TSX: ABRA) ("AbraSilver") announced that the project has been approved for inclusion under Argentina's Large Investment Incentive Regime ("RIGI"). RIGI provides long-term fiscal stability together with tax, customs, and foreign-exchange benefits.

AbraSilver further stated that Diablillos remains on track for several near-term milestones, including Environmental Impact Assessment ("EIA") approval and completion of the Definitive Feasibility Study, as it works toward a construction decision later this year. The company said detailed engineering, procurement planning, and infrastructure upgrades are advancing in parallel, with early works intended to begin following receipt of the EIA.

Elemental holds an uncapped 1% NSR royalty on Diablillos.

Mactung Feasibility Study Commencement and Private Placement

At Mactung, Fireweed Metals (TSXV: FWZ) ("Fireweed") announced the commencement of an updated Feasibility Study for its 100%-owned Mactung Tungsten Project, supported by the US Department of War as part of the Defense Production Act. Fireweed stated that the study is expected to be completed in early 2027 and is intended to support further engineering and mine licensing efforts. The mine license application is expected to be submitted in 2027.

Subsequent to the feasibility study announcement, Fireweed closed a C$61.5 million non-brokered private placement, including a strategic investment by JX Advanced Metals Corporation and participation by the Lundin Family Trusts. The proceeds will be used to support advancement of its Macpass, Mactung, and Gayna projects, regional infrastructure planning and general working capital purposes, which should further support the ongoing advancement of Mactung, the world's largest high-grade tungsten deposit.


Elemental holds a 4% GRR on Mactung, which can be bought down to an uncapped 2% GRR under certain conditions.

Allied acquired by Zijin

Allied Gold ("Allied") announced that it has agreed to be acquired by Zijin Gold International ("Zijin") in a friendly all-cash transaction valued at approximately C$5.5 billion. Allied also noted Zijin's intention to further advance its operations, including Sadiola, which increases confidence in continued development, expansion and long-term production from royalty-covered assets.

Elemental holds a capped 4.5% NSR royalty on Bonikro and an up to 3% NSR on Korali-Sud.

Pasofino Gold acquired by Mansa Resources

Pasofino Gold ("Pasofino") has been acquired by Mansa Resources ("Mansa") in an all-cash transaction, with Mansa also agreeing to provide Pasofino with up to US$10 million of interim funding through a promissory note. The Dugbe project will now be under the total ownership of a party that already holds approximately 51% of Pasofino. The ownership structure will simplify decision-making going forward and facilitate enhanced financial support from an experienced and well-funded operator.

Elemental holds an uncapped 2.0-2.5% NSR royalty on Dugbe.

Arizona Sonoran acquired by Hudbay Minerals Inc.

Hudbay Minerals (TSX: HBM) (NYSE: HBM) ("Hudbay") has announced that the company has entered into an agreement to acquire Arizona Sonoran and the Cactus Project, establishing a major copper hub in southern Arizona, and Hudbay as a leading supplier of domestic US refined copper, with Hudbay's Copper World and Cactus both expected to be significant producers of copper cathode. The acquisition substantially reduces execution risk at Cactus given Hudbay's proven track record developing and operating large-scale copper projects.

Elemental holds an uncapped 0.5-0.54% NSR royalty over the majority of the Cactus Project, with a 0.5% NSR royalty over part of the Parks-Salyer deposit.

Pickle Crow acquired by Bellavista Resources

FireFly Metals has agreed to sell the 70% interest in the Pickle Crow Project to Bellavista Resources (ASX: BVR) ("Bellavista") for an aggregate value of c.A$86.1 million.  Subject to and in conjunction with the completion of the acquisition, Bellavista is seeking to raise up to approximately A$25 million, which will be used to conduct Mineral Resource extensional and near-mine drilling, as well as regional mapping and sampling of multiple underexplored structures to identify new targets.

Elemental holds a 2.25% NSR Royalty on Pickle Crow, which can be bought down to 1.25% for US$2.5 million.

Technical Disclosure and Qualified Person

The scientific and technical information contained in this news release has been reviewed and approved by Michael Sheehan, a "Qualified Person" and employee of the Company as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").


For further information contact:

Elemental Royalty Corporation:

David M. Cole

Tara Vivian-Neal,

CEO

Investor Relations

info@elementalroyalty.com

investor@elementalroyalty.com

www.elementalroyalty.com

Phone: +1 (604) 688-6390

NASDAQ: ELE | TSX: ELE | ISIN: CA28620K1066 | CUSIP: 28620K

About Elemental Royalty Corporation.

Elemental Royalty is a new mid-tier, gold-focused streaming and royalty company with a globally diversified portfolio of 18 producing assets and more than 200 royalties, anchored by cornerstone assets and operated by world-class mining partners. Formed through the merger of Elemental Altus and EMX, the Company combines Elemental Altus's track record of accretive royalty acquisitions with EMX's strengths in royalty generation and disciplined growth. This complementary strategy delivers both immediate cash flow and long-term value creation, supported by a best-in-class asset base, diversified production, and sector-leading management expertise.

Elemental Royalty trades on NASDAQ and on the TSX under the ticker symbol "ELE".

Cautionary note regarding forward-looking statements and financial outlook

This news release contains certain "forward-looking statements" and certain "forward-looking information" as defined under applicable United States and Canadian securities laws. Forward-looking statements and information can generally be identified by the use of forward-looking terminology such as "may", "will", "should", "expect", "intend", "estimate", "anticipate", "believe", "continue", "plans" or similar terminology (including negative and grammatical variations thereof).

Forward-looking statements and information include, but are not limited to, statements regarding future royalties and future consideration payments or issuances of shares, or other statements that are not statements of fact. Forward-looking statements and information are based on forecasts of future results, estimates of amounts not yet determinable and assumptions that, while believed by management to be reasonable, are inherently subject to significant business, economic and competitive uncertainties and contingencies.

Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of Elemental to control or predict, that may cause Elemental's actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to: the impact of general business and economic conditions, the absence of control over the mining operations from which Elemental will receive royalties, risks related to international operations, government relations and environmental regulation, the inherent risks involved in the exploration and development of mineral properties; the uncertainties involved in interpreting exploration data; the potential for delays in exploration or development activities; the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with Elemental's expectations; accidents, equipment breakdowns, title matters, labour disputes or other unanticipated difficulties or interruptions in operations; fluctuating metal prices; unanticipated costs and expenses; uncertainties relating to the availability and costs of financing needed in the future; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations; currency fluctuations; regulatory restrictions, including environmental regulatory restrictions; liability, competition, loss of key employees and other related risks and uncertainties. For a discussion of important factors which could cause actual results to differ from forward-looking statements, refer to the annual information form of Elemental for the year ended December 31, 2025. Elemental undertakes no obligation to update forward-looking statements and information except as required by applicable law. Such forward-looking statements and information represent management's best judgment based on information currently available. No forward-looking statement or information can be guaranteed, and actual future results may vary materially. Accordingly, readers are advised not to place undue reliance on forward-looking statements or information.


Neither the Nasdaq Stock Market LLC, or the TSX, or its Regulation Service Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this press release.


FAQ

What is Elemental Royalty Corporation (ELE) highlighting in its April 2026 portfolio update?

Elemental Royalty reports operator progress across key gold, copper and tungsten royalties. The update covers expansion at Karlawinda, planning at Laverton, construction ramp-up at Viscaria, regulatory advancement at Diablillos, and a new Feasibility Study plus financing at Mactung, alongside several royalty-asset ownership changes.

How could the Karlawinda expansion affect Elemental Royalty’s (ELE) future royalty income?

Karlawinda’s operator targets increasing processing capacity to 6.5Mtpa from 4.0Mtpa and annual gold production to about 150,000 ounces. Since Elemental holds an uncapped 2% NSR royalty, higher sustained production volumes would directly raise royalty receipts once the expanded circuit is fully operational.

What progress is reported at the Viscaria copper project in Elemental Royalty’s (ELE) update?

Viscaria has completed groundworks, signed key construction-related agreements, and aims to finalize project financing by the end of Q2 2026. The operator guides to first ore in 2028 and roughly 26,000 tonnes of copper per year at full capacity, underpinning Elemental’s 0.5–1% NSR royalty there.

How is the Diablillos project advancing in Elemental Royalty’s (ELE) portfolio?

Diablillos has been approved under Argentina’s Large Investment Incentive Regime, providing fiscal and tax benefits. The operator is working toward Environmental Impact Assessment approval and a Definitive Feasibility Study, targeting a construction decision later in 2026, where Elemental holds an uncapped 1% NSR royalty.

What are the key developments at the Mactung royalty in Elemental Royalty’s (ELE) portfolio?

Fireweed has started an updated Feasibility Study for the Mactung tungsten project, supported under the Defense Production Act, with completion targeted in early 2027. A C$61.5 million private placement will help advance Mactung and related projects; Elemental holds a 4% GRR, reducible to 2%.

How do recent acquisitions of operators impact Elemental Royalty’s (ELE) assets?

Allied Gold’s C$5.5 billion sale to Zijin, Pasofino’s acquisition by Mansa Resources, Hudbay’s deal for Arizona Sonoran and Bellavista’s Pickle Crow acquisition introduce larger or well-funded operators. Elemental’s existing NSR and GRR royalties on Bonikro, Korali-Sud, Dugbe, Cactus and Pickle Crow remain in place.

Filing Exhibits & Attachments

1 document