Boeing Selects Spirit AeroSystems to Replace KC-135 Horizontal Stabilizers
Spirit AeroSystems Holdings (NYSE: SPR) has secured a contract from Boeing to supply 34 horizontal stabilizer kits for the U.S. Air Force's KC-135R Stratotankers, aimed at extending their operational life until at least 2040. The production will take place at Spirit's Tulsa, Oklahoma facility. This initiative aligns with Spirit's strategy to diversify its business, targeting a 40% revenue share from Defense and Space sectors. Additionally, Spirit is involved in the B-52 Commercial Engine Replacement Program, which is set to replace 608 engines by 2050.
- Secured a contract from Boeing for 34 horizontal stabilizer kits, enhancing revenue.
- Plans to diversify business with Defense and Space sector targeting 40% revenue share.
- Supports the operational life extension of KC-135R Stratotankers through 2040.
- None.
Spirit will support extending the life of the KC-135R through at least 2040 utilizing its advanced assembly capabilities including determinant assembly. The KC-135 series of aircraft first entered the
The new horizontal stabilizers will be produced at the Spirit facility in
“We are very pleased Boeing selected Spirit to produce horizontal stabilizers for the KC-135 Stratotanker, taking advantage of our decades of experience building aerostructures,” said
The KC-135 continues to provide the core aerial refueling capability for the
“Spirit AeroSystems is committed to growing in Defense and Space and supporting the needs of the warfighter; the KC-135 Horizontal Stabilizer replacement program aligns with that commitment,” said
Spirit is also helping Boeing extend the life of the B-52 Stratofortress by providing engine pylons and nacelles for the initial phase of the B-52 Commercial Engine Replacement Program (CERP). The total CERP effort is expected to replace 608 engines on the
On the web: www.spiritaero.com
On Twitter: @SpiritAero
About
Cautionary Statement Regarding Forward-Looking Statements
This press release contains "forward-looking statements" that may involve many risks and uncertainties. Forward-looking statements generally can be identified by the use of forward-looking terminology such as "aim," "anticipate," "believe," "could," "continue," "estimate," "expect," "goal," "forecast," "intend," "may," "might," "objective," "outlook," "plan," "predict," "project," "should," "target," "will," "would," and other similar words, or phrases, or the negative thereof, unless the context requires otherwise. These statements reflect management's current views with respect to future events and are subject to risks and uncertainties, both known and unknown. Our actual results may vary materially from those anticipated in forward-looking statements. We caution investors not to place undue reliance on any forward-looking statements. Important factors that could cause actual results to differ materially from those reflected in such forward-looking statements and that should be considered in evaluating our outlook include, without limitation, the impact of the COVID-19 pandemic on our business and operations; the timing and conditions surrounding the full worldwide return to service (including receiving the remaining regulatory approvals) of the B737 MAX, future demand for the aircraft, and any residual impacts of the B737 MAX grounding on production rates for the aircraft; our reliance on Boeing for a significant portion of our revenues; our ability to execute our growth strategy, including our ability to complete and integrate acquisitions; our ability to accurately estimate and manage performance, cost, and revenue under our contracts; demand for our products and services and the effect of economic or geopolitical conditions in the industries and markets in which we operate in the
View source version on businesswire.com: https://www.businesswire.com/news/home/20220919005188/en/
Investor Relations:
(316) 523-7040
investorrelations@spiritaero.com
Media:
(316) 803-2975
forrest.s.gossett@spiritaero.com
Source:
FAQ
What new contract did Spirit AeroSystems announce with Boeing regarding the KC-135R?
What is the significance of the KC-135R Stratotanker contract for Spirit AeroSystems?
Where will the new horizontal stabilizers for the KC-135R be produced?
How long is the operational life of the KC-135R being extended?