STOCK TITAN

Skanska reconstructs section of Route 146 in Rhode Island, USA, for USD 84M, about SEK 780M

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

Skanska, in collaboration with JH Lynch, has secured a contract valued at USD 167M to reconstruct Route 146 in Rhode Island, with Skanska's share being USD 84M (~SEK 780M). This project will include significant infrastructure improvements such as a new flyover bridge, roadway reconstruction, and drainage construction over approximately 13 kilometers, enhancing traffic safety and reducing congestion. Construction is set to commence in late 2022 and conclude by November 2025.

Positive
  • Skanska's contract share of USD 84M will contribute positively to Q1 2022 US order bookings.
  • The project aims to enhance traffic safety and reliability, potentially increasing regional economic vitality.
Negative
  • None.

ÖSTERSUND, Sweden, April 7, 2022 /PRNewswire/ -- Skanska has, as part of a joint venture with JH Lynch, signed a contract with Rhode Island Department of Transportation (RIDOT) to reconstruct Route 146 between 1-295 and Route 146A, and realign the Route 146/146A interchange in Rhode Island, USA. The total contract is worth USD 167M. Skanska's share of the contract is worth USD 84M, about SEK 780M, which will be included in the US order bookings for the first quarter of 2022.

The project includes the staged construction of Route 146 along with construction of a new flyover bridge and other structures. In addition, Skanska will perform bridge rehabilitation, roadway reconstruction, new bridge construction, retaining wall construction, drainage construction, utility relocation, handling and disposing of contaminated materials and milling and paving of about 13 kilometers of Route 146 to the Massachusetts border.

When completed, the project will improve traffic safety, restore critical infrastructure to a state of good repair, reduce congestion, increase system reliability, and enhance freight movement for economic vitality in the region.

Construction will begin in late 2022 and is scheduled for completion in November 2025.

CONTACT:

For further information please contact:

Brittany Felteau, Communications Director, Skanska USA, tel +1 617 574 14 85

Andreas Joons, Press Officer, Skanska AB, tel +46 (0)10 449 04 94

Direct line for media, tel +46 (0)10 448 88 99

This and previous releases can also be found at www.skanska.com.

 

This information was brought to you by Cision http://news.cision.com

https://news.cision.com/skanska/r/skanska-reconstructs-section-of-route-146-in-rhode-island--usa--for-usd-84m--about-sek-780m,c3541547

The following files are available for download:

https://mb.cision.com/Main/95/3541547/1560885.pdf

20220407 US route 146

Cision View original content:https://www.prnewswire.com/news-releases/skanska-reconstructs-section-of-route-146-in-rhode-island-usa-for-usd-84m-about-sek-780m-301519695.html

SOURCE Skanska

FAQ

What is the value of the contract Skanska signed for Route 146 reconstruction?

The total contract value is USD 167M, with Skanska's share being USD 84M.

When is the construction for Route 146 scheduled to begin and end?

Construction is set to begin in late 2022 and is scheduled for completion by November 2025.

What improvements are included in the Route 146 project by Skanska?

The project includes a new flyover bridge, roadway reconstruction, drainage construction, and other infrastructure enhancements.

How will the Route 146 reconstruction impact traffic conditions?

The project aims to improve traffic safety, restore critical infrastructure, reduce congestion, and enhance freight movement.

SKANSKA AB S/ADR

OTC:SKBSY

SKBSY Rankings

SKBSY Latest News

SKBSY Stock Data

8.74B
391.56M
0.02%
Engineering & Construction
Industrials
Link
United States of America
Stockholm