Sokoman Minerals Options the East Alder Gold Project in Central Newfoundland to Canterra Minerals Corporation
Sokoman Minerals Corp. (TSX.V: SIC, OTCQB: SICNF) has entered an option agreement with Canterra Minerals for the East Alder Gold Project in Newfoundland. Canterra can acquire 100% of East Alder by issuing 750,000 shares and committing $600,000 in work over four years. The project features rock samples with gold grades ranging up to 5.3 g/t and a 2-km gold-in-soil trend. Sokoman retains a 1.0% royalty on production. This partnership allows Sokoman to focus on its flagship Moosehead Gold Project, currently undergoing an extensive drill program.
- Strategic option agreement with Canterra enhances exploration potential.
- East Alder has promising rock sample results with gold and copper mineralization.
- Drilling permits in place for immediate exploration activities.
- Focus shift to Moosehead Gold Project with ongoing Phase 6 drill program.
- None.
Sokoman Minerals Corp. (TSX.V: SIC) (OTCQB: SICNF) (“Sokoman” or “the Company”) today announced that it has entered into an option agreement (the “Option Agreement”) with Canterra Minerals Corporation (“Canterra”) whereby Canterra can acquire
East Alder Highlights:
-
Rock samples from float ranging from 0.1 g/t to 5.3 g/t Au and from trace to
10.8% Cu. - 2-kilometre gold-in-soil trend with gold results continuous with the gold-in-soil anomaly from Canterra’s Wilding Project.
- Covers an additional 30 claims or 7.5 km2 of strike extent of the Valentine Lake Shear Zone that controls gold mineralization at Wilding and Marathon Gold’s Valentine Lake project.
- Permits for drilling in place.
Summary Terms of the Agreement
Canterra can acquire
Tim Froude, President and CEO of Sokoman Minerals, said: “The East Alder Gold Project covers the northeastern extension of the same geological units that host gold mineralization at Canterra’s Wilding Project, and Marathon Gold’s Valentine Lake gold deposits in the rapidly emerging Central Newfoundland Gold Belt. We believe that this strategic agreement represents a great opportunity for both Canterra and Sokoman. We are pleased that Canterra is adding East Alder to their 2021 field program as it is clear that they are committed to this region and we look forward to them generating exciting exploration results in the coming months. This transaction will allow Sokoman to place even more focus on our flagship Moosehead Gold Project which is now in its extensive Phase 6, 50,000m, drill program with two drill rigs already in place and two more rigs scheduled to follow.”
About Sokoman Minerals Corp.
Sokoman Minerals Corp. is a discovery-oriented company with projects in Newfoundland & Labrador, Canada. The Company's primary focus is its portfolio of gold projects (Moosehead, Crippleback Lake and Fleur de Lys) in Newfoundland. The
The Company also retains an interest in an early-stage antimony/gold project in Newfoundland optioned to White Metal Resources Inc. In Labrador, the Company has a
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Investors are cautioned that trading in the securities of the Corporation should be considered highly speculative. Except for historical information contained herein, this news release contains forward- looking statements that involve risks and uncertainties. Actual results may differ materially. Sokoman Minerals Corp. will not update these forward-looking statements to reflect events or circumstances after the date hereof. More detailed information about potential factors that could affect financial results is included in the documents filed from time to time with the Canadian securities regulatory authorities by Sokoman Minerals Corp.
View source version on businesswire.com: https://www.businesswire.com/news/home/20210419005546/en/
FAQ
What is the recent agreement between Sokoman Minerals and Canterra Minerals regarding the East Alder Gold Project?
What are the key highlights of the East Alder Gold Project?
How does the agreement with Canterra impact Sokoman's focus on its other projects?