Premium Nickel Reports 52.45 Metres of 2.02% NiEq or 3.59% CuEq (1.26% Ni, 1.17% Cu, 0.06% Co) & 35.60 Metres of 2.45% NiEq or 4.35% CuEq (1.54% Ni, 1.38% Cu, 0.08% Co) at Selebi North Underground
Premium Nickel announced assay results for ten drill holes at the Selebi North underground mine.
Assay highlights include:
- 52.45 meters at 2.02% NiEq (1.26% Ni, 1.17% Cu, 0.06% Co)
- 35.6 meters at 2.45% NiEq (1.54% Ni, 1.38% Cu, 0.08% Co)
These results are the final data needed for the Selebi National Instrument 43-101 compliant Mineral Resource Estimate (MRE), which is expected soon. The delay in the MRE release is due to a slow assay turnaround.
The company has drilled 41,836 meters across 107 holes to date, with assay results pending for some. These results may not be included in the initial MRE but will support future resource classification upgrades, potentially aiding a future Prefeasibility Study (PFS).
Three drills are currently active, focusing on areas beyond the known historic resource estimate.
- High-grade assays: 52.45 meters at 2.02% NiEq and 35.6 meters at 2.45% NiEq.
- Completion of 41,836 meters in 107 drill holes, with significant mineralization intersected.
- Drilling data to support the future upgrade of inferred to indicated resources in the NI 43-101 compliant Prefeasibility Study.
- Delay in receiving assays for drill hole SNUG-24-105, impacting the MRE timeline.
"These assays are the last underground drill holes to be included in the first Selebi National Instrument 43-101 compliant Mineral Resource Estimate ("MRE"). The MRE will incorporate drilling data from both Selebi North and Selebi Main and is expected in the coming weeks. The delay is predominantly due to the lag time in receiving the assays from drill hole SNUG-24-105." - CEO, Keith Morrison
Toronto, Ontario--(Newsfile Corp. - June 26, 2024) - Premium Nickel Resources Ltd. (TSXV: PNRL) (OTCQX: PNRLF) ("PNRL" or the "Company") is pleased to announce additional high-grade polymetallic assay results for a further ten holes from drilling at its past-producing nickel-copper-cobalt sulphide ("Ni-Cu-Co") Selebi North underground ("SNUG") mine in Botswana.
Highlights include:
- SNUG-24-094 (N2 Limb, 400 metres down plunge of historic N2 resource):
52.45 metres of2.02% NiEq or3.59% CuEq (1.26% Ni,1.17% Cu,0.06% Co)
incl. 10.40 metres of2.93% NiEq or5.21% CuEq (1.73% Ni,1.89% Cu,0.09% Co)
- SNUG-24-105 (South Limb / N2, within the historic resource):
35.60 metres of2.45% NiEq or4.35% CuEq (1.54% Ni,1.38% Cu,0.08% Co)
incl.16.15 metres of3.03% NiEq or5.38% CuEq (1.86% Ni,1.80% Cu,0.10% Co)
and 5.30 metres of2.39% NiEq or4.25% CuEq (1.61% Ni,1.15% Cu,0.09% Co)
and 5.80 metres of3.38% NiEq or6.00% CuEq (2.23% Ni,1.72% Cu,0.12% Co)
- SNUG-24-098 (South Limb, within historic resource):
9.55 metres of2.84% NiEq or5.03% CuEq (1.78% Ni,1.63% Cu,0.09% Co)
- SNUG-24-101 (South Limb, 175 metres down plunge of historic resource):
4.55 metres of2.78% NiEq or4.94% CuEq (1.96% Ni,1.19% Cu,0.10% Co)
- SNUG-24-104 (South Limb, 100 metres down plunge of historic resource):
7.00 metres of3.29% NiEq or5.84% CuEq (2.19% Ni,1.64% Cu,0.12% Co)
Previously, results for 53 holes were released in eleven separate news releases between November 14, 2023 and May 16, 2024. Details of the assay results are shown below along with accompanying visuals (Figure 1, Figure 2 and Figure 3). Drill core photos for all highlighted holes released to date, including the holes reported herein, are accessible by Clicking Here and can also be found on the Company's website at www.premiumnickel.com. To view the 3D modeling, please visit the following link https://vrify.com/decks/16249.
Keith Morrison, CEO of PNRL, commented: "These assays are the last underground drill holes to be included in the first Selebi National Instrument 43-101 compliant Mineral Resource Estimate ("MRE"). The MRE will incorporate drilling data from both Selebi North and Selebi Main and is expected in the coming weeks. The delay is predominantly due to the lag time in receiving the assays from drill hole SNUG-24-105. Additional BCL mine development data from the lower Selebi Mines levels has also been included, to extend the resource upwards to the existing mine infrastructure. The ongoing underground drilling, along with remaining pending assay results, will support the future classification of inferred resources to indicated resources. An upgrade in classification would enable their inclusion in a future NI 43-101 compliant Prefeasibility Study ("PFS"), thereby optimizing initial mine life estimates."
Assay results are provided below in Table 1 for SNUG-24-088, 094, 095, 097, 098, 101, 102, 104, 105 and 108; hole collar details are provided in Table 2.
The various mineralized zones have been historically mined and subsequently named N2 Limb, N3 Limb and South Limb to demarcate their location on the folded mineralized horizon. Additional drilling is needed to properly determine true width of mineralization on each limb and define the folded mineralization. Figures 1 through 3 show the location of the holes relative to the historic resource and underground infrastructure.
Table 1: Assay Results Selebi North Deposit
Hole-ID | From (m) | To (m) | *Length (m) | Ni (%) | Cu (%) | Co (%) | Limb | **NiEq (%) | **CuEq (%) |
SNUG-24-088 | 8.10 | 11.95 | 3.85 | 1.09 | 1.05 | 0.06 | South Limb | 1.78 | 3.16 |
SNUG-24-094 | 573.10 | 625.55 | 52.45 | 1.26 | 1.17 | 0.06 | N2 Limb | 2.02 | 3.59 |
incl. | 573.10 | 588.00 | 14.90 | 1.38 | 2.04 | 0.07 | N2 Limb | 2.64 | 4.68 |
*incl. | 577.60 | 588.00 | 10.40 | 1.73 | 1.89 | 0.09 | N2 Limb | 2.93 | 5.21 |
incl. | 592.60 | 607.00 | 14.40 | 1.72 | 1.05 | 0.09 | N2 Limb | 2.45 | 4.34 |
incl. | 612.80 | 625.55 | 12.75 | 1.43 | 1.05 | 0.07 | N2 Limb | 2.13 | 3.78 |
SNUG-24-095 | 16.30 | 19.70 | 3.40 | 2.03 | 1.31 | 0.10 | South Limb | 2.93 | 5.21 |
SNUG-24-095 | 32.30 | 34.30 | 2.00 | 1.37 | 0.45 | 0.07 | South Limb | 1.73 | 3.07 |
SNUG-24-095 | 94.80 | 98.00 | 3.20 | 1.93 | 1.46 | 0.10 | N2 Limb | 2.91 | 5.17 |
SNUG-24-097 | 33.35 | 71.10 | 37.75 | 0.52 | 0.97 | 0.03 | South Limb | 1.11 | 1.97 |
incl. | 41.10 | 57.80 | 16.70 | 0.66 | 0.91 | 0.04 | South Limb | 1.23 | 2.18 |
SNUG-24-097 | 133.15 | 144.25 | 11.10 | 1.61 | 0.91 | 0.09 | N2 Limb | 2.26 | 4.01 |
incl. | 133.15 | 139.50 | 6.35 | 2.24 | 1.06 | 0.12 | N2 Limb | 3.03 | 5.37 |
SNUG-24-098 | 14.00 | 23.55 | 9.55 | 1.78 | 1.63 | 0.09 | South Limb | 2.84 | 5.03 |
SNUG-24-098 | 120.80 | 128.25 | 7.45 | 1.16 | 0.55 | 0.06 | N2 Limb | 1.56 | 2.77 |
SNUG-24-101 | 419.70 | 424.25 | 4.55 | 1.96 | 1.19 | 0.10 | South Limb | 2.78 | 4.94 |
SNUG-24-101 | 456.00 | 456.55 | 0.55 | 1.59 | 0.35 | 0.06 | South Limb | 1.89 | 3.36 |
SNUG-24-102 | 305.95 | 307.65 | 1.70 | 2.21 | 0.61 | 0.11 | South Limb | 2.73 | 4.84 |
SNUG-24-102 | 315.90 | 318.55 | 2.65 | 2.13 | 1.74 | 0.11 | South Limb | 3.28 | 5.83 |
SNUG-24-102 | 329.55 | 335.10 | 5.55 | 0.91 | 1.19 | 0.05 | South Limb | 1.66 | 2.95 |
SNUG-24-104 | 377.30 | 384.30 | 7.00 | 2.19 | 1.64 | 0.12 | South Limb | 3.29 | 5.84 |
SNUG-24-105 | 286.05 | 321.65 | 35.60 | 1.54 | 1.38 | 0.08 | South Limb / N2 | 2.45 | 4.35 |
incl. | 286.05 | 302.20 | 16.15 | 1.86 | 1.80 | 0.10 | South Limb | 3.03 | 5.38 |
and | 305.90 | 311.20 | 5.30 | 1.61 | 1.15 | 0.09 | South Limb | 2.39 | 4.25 |
and | 315.85 | 321.65 | 5.80 | 2.23 | 1.72 | 0.12 | N2 Limb | 3.38 | 6.00 |
SNUG-24-108 | 284.80 | 288.55 | 3.75 | 1.37 | 0.53 | 0.08 | South Limb | 1.79 | 3.18 |
SNUG-24-108 | 296.40 | 301.60 | 5.20 | 0.91 | 1.52 | 0.05 | N2 Limb | 1.84 | 3.27 |
*Length refers to drillhole length and not true width. True widths are unknown.
**NiEq was calculated assuming a price of $US 7.90/lb for Ni, $US 4.45/lb for Cu and $US 12.32/lb for Co with no adjustments for recoveries or payabilities.
Table 2: Drill Collar Information Selebi North Deposit
HOLE ID | Mine East | Mine North | Elevation | Dip | Mine Azimuth | Hole Length | Comment |
SNUG-24-088 | 35065.5 | 84687.5 | -44.9 | -33.7 | 218.7 | 173.4 | Rig #1 925mL |
SNUG-24-094 | 35366.0 | 84406.7 | 81.5 | -66.1 | 206.9 | 661.3 | Rig #2 810mL |
SNUG-24-095 | 35071.1 | 84688.6 | -44.3 | -7.0 | 179.2 | 149.6 | Rig #1 925mL |
SNUG-24-097 | 35070.8 | 84688.0 | -45.4 | -37.6 | 179.1 | 212.1 | Rig #1 925mL |
SNUG-24-098 | 35069.6 | 84689.4 | -45.3 | -51.7 | 223.5 | 161.4 | Rig #1 925mL |
SNUG-24-101 | 35376.5 | 84423.8 | 81.3 | -74.4 | 229.4 | 479.5 | Rig #3 810mL |
SNUG-24-102 | 35322.6 | 84605.8 | 82.3 | -59.4 | 235.6 | 488.4 | Rig #1 810mL |
SNUG-24-103 | 35366.7 | 84407.6 | 81.3 | -68.0 | 225.8 | 638.8 | Rig #2 810mL |
SNUG-24-104 | 35377.2 | 84424.1 | 81.1 | -73.4 | 254.2 | 434.5 | Rig #3 810mL |
SNUG-24-105 | 35321.0 | 84606.0 | 82.4 | -46.3 | 246.0 | 380.4 | Rig #1 810mL |
SNUG-24-108 | 35321.3 | 84605.6 | 82.6 | -41.4 | 236.0 | 377.6 | Rig #1 810mL |
Drilling and BHEM Continues
Three drills are currently active on the 810-metre level exploration drift. The two drill bays, located at the southern most extent of this drift, allow for the evaluation of areas further down plunge and outside of the known historic resource estimate. The third drill is positioned approximately 130 metres east, orthogonal to the main 810-metre level exploration drift, allowing for optimal intersection angles on South Limb and N2 Limb.
As of June 24, 2024,
FAQ
What are the latest assay results for Premium Nickel Resources (PNRLF)?
When can we expect the Mineral Resource Estimate (MRE) for Premium Nickel (PNRLF)?
How much drilling has Premium Nickel (PNRLF) completed at Selebi North?
What caused the delay in the Mineral Resource Estimate (MRE) for Premium Nickel (PNRLF)?