Field Crews Re-mobilize for Summer-Fall Drill and Surface Exploration Programs, Corvette Property, Quebec
Patriot Battery Metals Inc. has re-mobilized field crews to the Corvette Property to initiate the summer-fall phase of its 2022 drill campaign. The primary focus is to delineate the spodumene pegmatite body in the CV5-1 Corridor, while secondary objectives target other lithium pegmatite occurrences. Previous drilling has shown significant results, with intercepts of 3.01% Li2O over 40.7 m. The upcoming phase aims to complete at least 15,000 m of drilling, supported by the addition of a third drill rig and continued surface exploration starting mid-June.
- Successful winter-spring program achieved objectives with 4,345 m over 20 drill holes.
- Significant lithium assays reported, including 3.01% Li2O over 40.7 m.
- Drilling expected to include at least 15,000 m of additional coring, indicating ongoing commitment to exploration.
- Drilling paused from April 20 to late May due to regional restrictions, impacting operational continuity.
- -
Highlights
- Field crews have re-mobilized to the Corvette Property for commencement of the summer-fall phase of its 2022 drill campaign
- Primary objective is to further delineate the main spodumene pegmatite body within the 2+ km long CV5-1 Corridor
- Secondary objectives include drill testing of multiple other lithium pegmatite occurrences identified on the Property
- Field crews will mobilize within the next two weeks for commencement of its 2022 surface exploration programs
- Surface exploration to consist of surface mapping proximal to the known lithium pegmatite occurrences, as well as prospecting of the more than 30 km trend that remains unexplored for lithium pegmatite
VANCOUVER, British Columbia, June 02, 2022 (GLOBE NEWSWIRE) -- Patriot Battery Metals Inc. (the “Company” or “Patriot”) (CSE: PMET) (OTCQB: PMETF) (FSE: R9GA) is pleased to announce that field crews have re-mobilized to site for the commencement of the summer-fall phase of its 2022 drill campaign at the Corvette Property (the “Property”). The Property is located proximal to the regional and all-weather Trans-Taiga Road and powerline infrastructure, within the James Bay Region of Quebec.
The mobilization of drill crews, geological staff, and support staff follows a brief pause in drilling from April 20th through late May to comply with regional restrictions on exploration activity over the period as well as to allow for spring break-up. The Company utilized this time to further develop its geological model of the main lithium pegmatite body(s) and corridor being drill tested – the CV1, CV2, CV5, and CV6 pegmatites – as well as further refine the next series of drill holes and finalize plans for the pending surface exploration programs.
The winter-spring drill program was highly successful (4,345 m over 20 drill holes), achieving all its objectives, significantly expanding the mineralized pegmatite along strike and to depth. Specifically, the drilling traced the pegmatite across the lake from CV5 towards CV1 – a strike length of at least 1,400 m – and also indicates that the pegmatite body is widening at depth. Drill results reported to date from the program include
The main pegmatite body remains open to the southwest, the northeast, and at depth, with a significant portion of the overall corridor of focus – containing the CV6, CV5, CV11, CV2, CV1, CV4, and CV7 pegmatite outcrops – remaining to be drill tested. To date, the main pegmatite body has been traced to a vertical depth of a least 180 m (CV22-030) and additional pegmatite encountered down to a vertical depth of approximately 265 m – ending in spodumene pegmatite.
The summer/fall phase of drilling is anticipated to include at least 15,000 m of additional coring. This drilling will focus on continued land-based infill and step-out holes at the CV5-1 corridor, as well as testing new regional targets (see news release dated March 8th, 2022). The Company will add a third drill rig to the program, expected to arrive by mid-July, as well as a lake barge, which will allow continued focus on delineating the main pegmatite body beneath the shallow glacial lake between the CV5 and CV1 pegmatites.
The surface component of the 2022 exploration program will commence in mid-June with detailed outcrop mapping proximal to the known spodumene pegmatite outcrops present across the Property (CV1 through CV12). This data will help with local structural and geological interpretation and allow for refined drill hole targeting. Additionally, the new claim blocks recently acquired by the Company (Felix, Deca-Goose, and Corvette East) will be prospected for lithium pegmatite. Historically, pegmatite outcrops have been documented over these claim blocks; however, the large majority have not been assessed for lithium mineralization, representing more than 25-30+ km of prospective trend.
About the CV Lithium Trend
The CV Lithium Trend is an emerging spodumene pegmatite district discovered by the Company in 2017 and spans the FCI West, FCI East, and Corvette claim blocks. The core area includes an approximate 2 km long corridor (the CV5-1 Corridor), which is part of the more than 25-km long CV Lithium Trend extending across the Property. It consists of numerous spodumene pegmatite occurrences, which include the CV1, CV2, CV3, CV5, CV6, CV7, and CV11 pegmatites and has returned drill intercepts of
Qualified Person
Darren L. Smith, M.Sc., P. Geo., Vice President of Exploration of the Company, a registered permit holder with the Ordre des Géologues du Québec and Qualified Person as defined by National Instrument 43-101, has reviewed the technical information in this news release.
About Patriot Battery Metals Inc.
Patriot Battery Metals Inc. is a mineral exploration company focused on the acquisition and development of mineral properties containing battery, base, and precious metals.
The Company’s flagship asset is the Corvette Property, located proximal to the Trans-Taiga Road and powerline infrastructural corridor in the James Bay Region of Québec. The land package hosts significant lithium potential highlighted by the CV5-1 spodumene pegmatite corridor with drill intercepts of
The Company also holds
The Company’s other assets include the Pontax Lithium-Gold Property, QC; and the Hidden Lake Lithium Property, NWT, where the Company maintains a
For further information, please contact us at info@patriotbatterymetals.com Tel: +1 (778) 945-2950 , or visit www.patriotbatterymetals.com.
On Behalf of the Board of Directors,
“BLAIR WAY”
Blair Way, President, CEO, & Director
Disclaimer for Forward-Looking Information
This news release contains forward-looking statements and other statements that are not historical facts. Forward-looking statements are often identified by terms such as “will”, “may”, “should”, “anticipate”, “expects” and similar expressions. All statements other than statements of historical fact, included in this news release are forward-looking statements that involve risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s expectations include the results of further exploration and testing, and other risks detailed from time to time in the filings made by the Company with securities regulators, available at www.sedar.com. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of which are beyond the control of the Company. The reader is cautioned not to place undue reliance on any forward-looking information. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement. The forward-looking statements contained in this news release are made as of the date of this news release and the Company will update or revise publicly any of the included forward-looking statements as expressly required by applicable law.
No securities regulatory authority or stock exchange has reviewed nor accepts responsibility for the adequacy or accuracy of the content of this news release.
FAQ
What are the objectives of Patriot Battery Metals' summer-fall drilling campaign?
What recent drilling results has Patriot reported from the Corvette Property?
How much drilling is planned for the upcoming phase at the Corvette Property?
What challenges did Patriot Battery Metals face in April and May 2022?