Group Ten Metals Announces Arrival of First Drill Rig at Stillwater West PGE-Ni-Cu-Co + Au Project in Montana, USA
Group Ten Metals has commenced a significant drilling campaign at its Stillwater West project in Montana, with the first drill rig now on site. The campaign aims to drill 10,000 meters to expand known mineralization, with results expected to enhance resource estimates by summer 2021. The project focuses on platinum, palladium, nickel, copper, cobalt, and gold, essential for the electrification movement. The Company anticipates this drilling will lead to further resource estimations and geological mapping to prepare additional targets for drilling.
- Commencement of a 10,000-meter drill campaign aimed at expanding known mineralization.
- Drilling results expected to enhance inaugural mineral resource estimates by summer 2021.
- Strategic geological mapping and prospecting to advance additional targets.
- None.
VANCOUVER, BC / ACCESSWIRE / June 21, 2021 / Group Ten Metals Inc. (TSXV:PGE)(OTCQB:PGEZF)(FSE:5D32) (the "Company" or "Group Ten") announces that the first drill of a planned three rig drill program has arrived at site and is being prepared for the start of work at the Company's flagship Stillwater West platinum group element, nickel, copper, cobalt, and gold ("PGE-Ni-Cu-Co + Au") project in Montana, USA.
A 10,000-meter drill campaign is planned for the 2021 season with the primary objective of expanding drill-defined mineralization at the three most advanced areas and testing adjacent priority targets identified in the 2020 Induced Polarization ("IP") survey (see figure below, and April 19, 2021 news release). Results from 2021 drilling are expected to drive expansion of the inaugural mineral resource estimates that are now in development, with publication targeted for this summer. The program will further include geological mapping and prospecting programs to advance earlier-stage targets to drill-ready status across the 32-kilometer-long project, as well as an expanded IP geophysical survey.
Michael Rowley, President and CEO, commented, "We are excited to announce the arrival of the first drill rig as we initiate our most aggressive field program to date at Stillwater West. Additional equipment and crews are in transit as we enter what we expect will be a transformative period for the Company. Work in 2021 is expected to pave the way for rapid expansion of the inaugural resource estimates that are now in development based on the enormous potential demonstrated by previous drilling and the 2020 IP survey noted above. We successfully identified multiple new high-grade magmatic horizons and expanded known mineralization into untested adjacent targets at Chrome Mountain in 2020 with this approach, and our objective is to continue that success at all three advanced target areas this year. We look forward to further announcements in the near term."
(To view the full size image, click here)
Upcoming Events
The Company will be participating in the Soar Financial Online Conference on Wednesday, June 23 with a presentation time of 9:00 am PST/18:00 CEST. Titled SF Online Session 9 - Future Metals, the event will focus exclusively on clean energy/battery metals. To register, click here.
About Stillwater West
Group Ten is rapidly advancing the Stillwater West PGE-Ni-Cu-Co + Au project towards becoming a world-class source of low-carbon, sulphide-hosted nickel, copper, and cobalt, critical to the electrification movement, as well as key catalytic metals including platinum, palladium and rhodium used in catalytic converters, fuel cells, and the production of green hydrogen. Stillwater West positions Group Ten as the second-largest landholder in the Stillwater Complex, with a
About Group Ten Metals Inc.
Group Ten Metals Inc. is a TSX-V-listed Canadian mineral exploration company focused on the development of high-quality platinum, palladium, nickel, copper, cobalt, and gold exploration assets in top North American mining jurisdictions. The Company's core asset is the Stillwater West PGE-Ni-Cu-Co + Au project adjacent to Sibanye-Stillwater's high-grade PGE mines in Montana, USA. Group Ten also holds the high-grade Black Lake-Drayton Gold project adjacent to Treasury Metals' development-stage Goliath Gold Complex in northwest Ontario, and the Kluane PGE-Ni-Cu-Co project on trend with Nickel Creek Platinum‘s Wellgreen deposit in Canada‘s Yukon Territory.
About the Metallic Group of Companies
The Metallic Group is a collaboration of leading precious and base metals exploration companies, with a portfolio of large, brownfield assets in established mining districts adjacent to some of the industry's highest-grade producers of silver and gold, platinum and palladium, and copper. Member companies include Metallic Minerals in the Yukon's high-grade Keno Hill silver district and La Plata silver-gold-copper district of Colorado, Group Ten Metals in the Stillwater PGM-nickel-copper district of Montana, and Granite Creek Copper in the Yukon's Minto copper district. The founders and team members of the Metallic Group include highly successful explorationists formerly with some of the industry's leading explorers/developers and major producers. With this expertise, the companies are undertaking a systematic approach to exploration using new models and technologies to facilitate discoveries in these proven, but under-explored, mining districts. The Metallic Group is headquartered in Vancouver, BC, Canada, and its member companies are listed on the Toronto Venture, US OTC, and Frankfurt stock exchanges.
Note 1: References to adjoining properties are for illustrative purposes only and are not necessarily indicative of the exploration potential, extent, or nature of mineralization or potential future results of the Company's projects.
Note 2: Magmatic Ore Deposits in Layered Intrusions-Descriptive Model for Reef-Type PGE and Contact-Type Cu-Ni-PGE Deposits, Michael Zientek, USGS Open-File Report 2012-1010.
FOR FURTHER INFORMATION, PLEASE CONTACT:
Michael Rowley, President, CEO & Director
Phone: (604) 357 4790
Toll Free: (888) 432 0075
Email: info@grouptenmetals.com
Web: http://grouptenmetals.com
Quality Control and Quality Assurance
Mr. Mike Ostenson, P.Geo., is the qualified person for the purposes of National Instrument 43-101, and he has reviewed and approved the technical disclosure contained in this news release.
Forward-Looking Statements
Forward Looking Statements: This news release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing of the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, titlefuture driling actiivities and the locations of such drilling, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Group Ten believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Group Ten and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SOURCE: Group Ten Metals Inc.
View source version on accesswire.com:
https://www.accesswire.com/652497/Group-Ten-Metals-Announces-Arrival-of-First-Drill-Rig-at-Stillwater-West-PGE-Ni-Cu-Co-Au-Project-in-Montana-USA
FAQ
What does the arrival of the first drill rig mean for Group Ten Metals (PGEZF)?
When will Group Ten Metals publish its inaugural resource estimates?
What are the primary objectives of Group Ten's drilling program at Stillwater West?