STOCK TITAN

O3 Mining Intersects 5.1 g/t Au Over 5.1 metres near Marban's Norlartic Pit

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

O3 Mining (TSXV: OIII | OTCQX: OIIIF) announced promising new drilling results from the Marban project in Québec. Key highlights include 5.1 g/t Au over 5.1 metres in the North Shear zone and 2.7 g/t Au over 10.6 metres in the new Triple North zone. The ongoing drilling program consists of 125,000 metres aiming to expand mineralization beyond the initial pit areas outlined in the Marban Preliminary Economic Assessment. The results indicate potential resource expansion, with additional assay results from 23 drill holes pending.

Positive
  • New drilling results indicate significant mineralization expansion potential at Marban.
  • Intercepts show high gold grades, including 5.1 g/t Au and 2.7 g/t Au.
  • 125,000 metres of drilling planned to further explore resource potential.
Negative
  • None.

TSXV: OIII | OTCQX:OIIIF - O3 Mining

TORONTO, March 9, 2021 /PRNewswire/ - O3 Mining Inc. (TSXV: OIII) (OTCQX: OIIIF) ("O3 Mining" or the "Corporation") is pleased to provide new drilling results from the Marban project on its Malartic Property in the Val-d'Or region of Québec, Canada as part of its 250,000 metre drilling program.

Drilling at Marban focuses on expanding mineralization outside of the proposed pit areas outlined in the Preliminary Economic Assessment ("Marban PEA") released on September 08, 2020. The 2021-2022 drilling program consists of 125,000 metres to test extensions of the deposits and zones outside the PEA pit areas. New drilling results from two drill holes include:

Drilling Highlights:

  • 5.1 g/t Au over 5.1 metres including 13.1 g/t Au Over 0.5 metres and 15.2 g/t Au over 0.7 metres in hole O3MA-21-033-W1 at the North Shear zone
  • 2.7 g/t Au over 10.6 metres including 26.9 g/t Au Over 0.5 metres in hole O3MA-21-033 near surface in new Triple North zone

"The discovery of the new Triple North zone outside of the Norlartic pit shell continues to build our confidence in the potential to expand the mineable resources at Marban. With 125,000 metres of drilling planned for the Marban project, our drill program continues to grow, as does the potential for new discovery," said President and CEO José Vizquerra.

The intercepts released today in holes O3MA-21-033, O3MA-21-033-W1 and O3MA-21-039 are part of six drill holes completed earlier this year to test extensions at depth of the North North and North Shear zones, which are both proposed for open pit mining in the 2020 Marban PEA.  Assay results from four other drill holes in this area are pending.

A total of 51 drill holes have been drilled at Marban since the beginning of the campaign in August 2020, focusing on the Kierens, Kierens NW, Gold Hawk, Orion, MK, North Shear, North North, and Marban NE zones. Assay results from 23 drill holes are pending. 

Table 1: Drill Hole Intercepts (only intercepts above 5 g/t Au * m are reported, cut-off 0.3 g/t Au above 200 m and 1.0 g\t Au below 200 m)

Drill Hole

From
(m)

To
(m)

Interval
(m)

Au
(g/t)

Zone

O3MA-21-033

38.9

49.5

10.6

2.7

Triple North
(new zone)

incl.

38.9

39.4

0.5

26.9

incl.

43.8

44.5

0.7

8.9

O3MA-21-033-W1

580.2

585.3

5.1

5.1

North Shear

incl.

581.1

581.6

0.5

13.1

incl.

583.1

583.8

0.7

15.2

O3MA-21-039

286.9

288.8

1.9

5.3

North North


NOTE: True width determination is currently unknown but is estimated at 65-80% of the reported core length interval for the zones.

Table 2: Drill Hole Details 

Drill Hole ID

Azimuth
(˚)

Dip
(˚)

Length
(m)

UTM E

UTM N

O3MA-21-033

206

-72

701

277929

5337816

O3MA-21-033-W1

206

-72

31

277929

5337816

O3MA-21-039

208

-73

666

277756

5337904

Hole O3MA-21-033 intersected a new zone called Triple North, at a vertical depth of approximately  30 metres. The hole intersected stockwork quartz-carbonate veins with disseminated pyrite and visible gold within an albitized and sheared granodiorite. The interval returned 2.7 g/t Au over 10.6metres, including 26.9 g/t Au over 0.5 metres and 8.9 g/t Au over 0.7 metres. The Triple North zone is open laterally and at depth.

The North Shear zone was intersected in hole O3MA-21-033-W1 and confirmed the depth continuity of the mineralized zone. The mineralized interval has been intercepted 200 metres below the last historical intercept of the North Shear zone, and returned 5.1 g/t Au over 5.1 metres, including 13.1 g/t Au over 0.5 metres and 15.2 g/t Au over 0.7 metres, expanding the potential of the zone further at depth. The mineralization is hosted within a quartz-carbonate vein with visible gold and disseminated pyrite at the sheared contact between mafic volcanics and a felsic dyke.

Hole O3MA-21-039 intersected the  North North zone at a vertical depth of approximately 200 metres and cross-cut an albitized granodiorite. Mineralization consists of quartz-carbonate-tourmaline veins with up to 2% disseminated pyrite. The intercept returned 5.3 g/t Au over 1.9 metres.

Figure 1: Malartic Property Map

Figure 1: Malartic Property Map (CNW Group/O3 Mining Inc.)

Figure 2: Marban Project Drilling Map

Figure 2: Marban Project Drilling Map (CNW Group/O3 Mining Inc.)

Qualified Person

The scientific and technical content of this news release has been reviewed, prepared, and approved by Mr. Louis Gariepy. (OIQ #107538), VP Exploration, who is a "qualified person" as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control and Reporting Protocols

True width determination is currently unknown but is estimated at 65-80% of the reported core length interval for the zones. Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Half-core samples are shipped to Agat laboratory in Val-d'Or, Québec, and Mississauga, Ontario for assaying. The core is crushed to 75% passing -2 mm (10 mesh), a 250 g split of this material is pulverized to 85% passing 75 microns (200 mesh) and 50 g is analyzed by Fire Assay (FA) with an Atomic Absorption Spectrometry (AAS) finish. Samples assaying >10.0 g/t Au are re-analyzed with a gravimetric finish using a 50 g charge. Commercial certified standard material and blanks are systematically inserted by O3 Mining's geologists into the sample chain after every 18 core samples as part of the QA/QC program. Third-party assays are submitted to other designated laboratories for 5% of all samples. Drill program design, Quality Assurance/Quality Control ("QA/QC"), and interpretation of results are performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices.

About O3 Mining Inc.

O3 Mining Inc., an Osisko Group company, is a gold explorer and mine developer ready to produce from its highly prospective gold camps in Québec, Canada. O3 Mining benefits from the support, previous mine-building success, and expertise of the Osisko team as it grows towards being a gold producer with several multi-million ounce deposits in Québec.

O3 Mining is well-capitalized and owns a 100% interest in all its properties (137,000 hectares) in Québec.
O3 Mining trades on the TSX Venture Exchange (TSX.V: OIII) and OTC Markets (OTCQX: OIIIF). The company is focused on delivering superior returns to its shareholders and long-term benefits to its stakeholders. Further information can be found on our website at https://o3mining.com

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections, and interpretations as at the date of this news release. The information in this news release about the transaction; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This forward-looking information is based on reasonable assumptions and estimates of management of the Corporation, at the time it was made, involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the companies to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, risks relating to the restart of operations; further steps that might be taken to mitigate the spread of COVID-19; the impact of COVID-19 related disruptions in relation to the Corporation's business operations including upon its employees, suppliers, facilities and other stakeholders; uncertainties and risk that have arisen and may arise in relation to travel, and other financial market and social impacts from COVID-19 and responses to COVID 19. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the parties cannot assure shareholders and prospective purchasers of securities that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Corporation nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Corporation does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

O3 Mining Inc. Logo (CNW Group/O3 Mining Inc.)

Download press release (CNW Group/O3 Mining Inc.)

Cision View original content to download multimedia:http://www.prnewswire.com/news-releases/o3-mining-intersects-5-1-gt-au-over-5-1-metres-near-marbans-norlartic-pit-301243117.html

SOURCE O3 Mining Inc.

FAQ

What are the recent drilling results for O3 Mining (OIIIF)?

O3 Mining reported new drilling results from the Marban project, including 5.1 g/t Au over 5.1 metres in the North Shear zone and 2.7 g/t Au over 10.6 metres in the Triple North zone.

How many metres of drilling are planned for the Marban project?

O3 Mining has planned a total of 125,000 metres of drilling for the Marban project.

What is the significance of the Marban Preliminary Economic Assessment for O3 Mining?

The Marban Preliminary Economic Assessment outlines the initial economic potential of the Marban project and serves as a baseline for exploring further mineralization.

How many drill holes have been completed at Marban since the campaign began?

A total of 51 drill holes have been completed at the Marban project since the campaign started in August 2020.

O3 MINING INC

OTC:OIIIF

OIIIF Rankings

OIIIF Latest News

OIIIF Stock Data

89.83M
49.91M
21.26%
20.06%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Toronto