Mexus Expands Heap Leach Pad; Second Batch Of Activated Carbon Being Readied For Shipment
Mexus Gold US (MXSG) has successfully completed the expansion of its heap leach pad at the Santa Elena mine, increasing capacity by 15,000 tons. This new pad is set to begin receiving mineralized material from September 27, 2021. Additionally, preparations for the shipment of the second batch of activated carbon are underway. This expansion is a significant step in enhancing the company’s operational capabilities in mining, particularly in gold and copper extraction in Mexico.
- Completion of 15,000-ton heap leach pad expansion enhances processing capacity.
- New mineralized material loading starts immediately, indicating operational progress.
- Second batch of activated carbon being prepared for shipment, suggesting increased production capabilities.
- None.
CABORCA, MEXICO / ACCESSWIRE / September 27, 2021 / Mexus Gold US (OTC PINK:MXSG) ("Mexus" or the "Company) announced that the expansion of the heap leach pad at its Santa Elena mine is now complete. The 15,000 ton pad expansion is lined and will be loaded with new mineralized material starting September 27th. In addition, the second batch of activated carbon is being readied for shipment.
About Mexus Gold US
Mexus Gold US is an American based mining company with holdings in Mexico. The fully owned Santa Elena mine is located 54km NW of Caborca, Mexico. Mexus also owns rights to the Ures property located 80km N of Hermosillo, Mexico. This property contains 6900 acres and has both gold and copper on the property. Founded in 2009, Mexus Gold US is committed to protecting the environment, mine safety and employing members of the communities in which it operates.
For more information on Mexus Gold US, visit www.mexusgoldus.com.
Mexus Gold US (775) 721-9960. Paul Thompson Sr
Cautionary Statement
Forward looking Statement: Statements in this press release may constitute forward-looking statements and are subject to numerous risks and uncertainties, including the failure to complete successfully the development of new or enhanced products, the Company's future capital needs, the lack of market demand for any new or enhanced products the Company may develop, any actions by the Company's partners that may be adverse to the Company, the success of competitive products, other economic factors affecting the Company and its markets, seasonal changes, and other risks detailed from time to time in the Company's filings with the Securities and Exchange Commission. The actual results may differ materially from those contained in this press release. The Company disclaims any obligation to update any statements in this press release.
SOURCE: Mexus Gold US
View source version on accesswire.com:
https://www.accesswire.com/665576/Mexus-Expands-Heap-Leach-Pad-Second-Batch-Of-Activated-Carbon-Being-Readied-For-Shipment
FAQ
What recent development did Mexus Gold US announce regarding its Santa Elena mine?
What is the significance of the heap leach pad expansion for Mexus Gold US?
When will the new mineralized material start being loaded onto the expanded heap leach pad?