STOCK TITAN

Battery Grade Lithium Carbonate to be Produced at HMN Li Project

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

Lithium South Development Corporation (TSX-V: LIS) (OTCQB: LISMF) announced that Eon Minerals will conduct test work to produce battery-grade lithium carbonate from brine at the Hombre Muerto North Lithium Project in Argentina. The process involves a pre-concentration phase of 15 cubic meters of brine and follows conventional evaporation extraction methods. The effort will yield valuable data for designing a pilot test plant and is supervised by a qualified expert. The project aims to advance lithium production capabilities in line with growing market demand.

Positive
  • Test work on battery-grade lithium carbonate could enhance production capabilities.
  • The project is moving towards the pilot plant stage, indicating progress.
  • Collaboration with Eon Minerals, an experienced firm, supports quality assurance.
Negative
  • None.

VANCOUVER, BC, Oct. 19, 2021 /PRNewswire/ -- Lithium South Development Corporation (the "Company") (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce that Eon Minerals of Miami Florida, through its laboratory located in Salta, Argentina, will be conducting test work to produce battery grade lithium carbonate from a bulk sample of brine to be recovered from the Hombre Muerto North Lithium Project (HMN Li Project), Argentina. Conventional process technology, based upon the proven evaporation extraction process of lithium will be utilized in this test phase.

The testing will begin with a pre-concentration process of 15 cubic meters of brine in ponds located at the project site.  Work will include liming, solid-liquid separation, removal of boron through Solvent Extraction, polishing of the brine, precipitation of primary lithium carbonate, bi-carbonation, polishing of the brine by Ion Exchange, resulting in a targeted-battery grade lithium carbonate product.  The process will also produce a lithium chloride solution with a targeted concentration up to 6% wt., which will be shipped to Chemphys Chengdu in China for further refinishing to their customer specifications.

The process test work will result in hard data for the design of a pilot test plant.  Recovery rates of lithium under salar conditions will provide the information required for a National Instrument 43-101 Technical Report.   The process test work will be supervised by Mr. Alex Mezei, a Qualified Person for the purposes of N.I. 43-101 and a recognized expert within the industry.

Company President, Adrian F.C. Hobkirk is quoted: "We are very pleased to move our project forward towards the pilot plant stage, as part of our evaluation of the best process to use in achieving lithium production at the HMN Li Project."

About Eon Minerals

Eon Minerals of Miami Florida has a fully capable laboratory in Salta Argentina, equipped for lithium test work.  The company is well experienced in the lithium industry.  Past and current clients include Ganfeng Lithium, Neo Lithium and Rincon Ltd.  Eon Minerals technical staff includes Susana Martinez, PhD in Chemistry with specialization in synthesis and nanomaterials, Ivan Machin, PhD in Chemistry with specialization in thermodynamic and catalysis, Lorena Perez, MSc specializing in heavy and extra heavy oil extraction, and Gonzalo Chaparro who has worked on engineering for the most important projects in Argentina.  The team has a joint experience of more than 50 years in process development, and more than 15 years with specific lithium experience.  The Company is owned and operated by Fernando Villarroel, Vice President, and Director of the Company.

About Lithium South

Lithium South is focused on developing the Hombre Muerto North Lithium Project (HMN Li Project), located on the Hombre Muerto Salar, a major lithium-producing salar in Argentina.  The property is adjacent to land under development by the Korean multinational corporation POSCO, which acquired the ground from Galaxy Resources Ltd. for US $280 million.  The Company completed a Preliminary Economic Assessment of the HMN Li Project in 2019, utilizing conventional evaporation extraction. The Company is focused on evaluating alternative extraction methods for the HMN Li Project.  

This news release was reviewed and approved by Mr. Alex Mezei, P.Eng., a Qualified Person for the purposes of NI 43-101, and technical consultant to the Company.  Mr. Mezei participated in the production of this news release and approves of the scientific disclosure contained herein.

On behalf of the Board of Directors

Adrian F. C. Hobkirk
President and Chief Executive Officer
Investors / Shareholders call 855-415-8100 / website: www.lithiumsouth.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange has not reviewed the content of this news release and therefore does not accept responsibility or liability for the adequacy or accuracy of the contents of this news release.

This news release contains certain "forward-looking statements" within the meaning of Section 21E of the United States Securities and Exchange Act of 1934, as amended. Except for statements of historical fact relating to the Company, certain information contained herein constitutes forward-looking statements. Forward-looking statements are based upon opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors which could cause actual results to differ materially from those projected in the forward-looking statements.  The reader is cautioned not to place undue reliance on forward- looking statements.  We seek safe harbor.

 

Cision View original content:https://www.prnewswire.com/news-releases/battery-grade-lithium-carbonate-to-be-produced-at-hmn-li-project-301403446.html

SOURCE Lithium South Development Corporation

FAQ

What is the purpose of the lithium test work by Lithium South Development Corporation?

The test work aims to produce battery-grade lithium carbonate from brine at the Hombre Muerto North Lithium Project.

When will the lithium production testing begin for LISMF?

The testing is set to commence following the announcement made on October 19, 2021.

What methodology will be used for lithium carbonate production at the HMN Li Project?

Conventional evaporation extraction technology will be utilized during the testing phase.

Who is supervising the lithium production test work for LISMF?

The test work is supervised by Alex Mezei, a Qualified Person for N.I. 43-101.

What will the lithium test work data be used for?

The data will inform the design of a pilot test plant and support a National Instrument 43-101 Technical Report.

LITHIUM SOUTH DEV CORP

OTC:LISMF

LISMF Rankings

LISMF Latest News

LISMF Stock Data

8.37M
109.39M
0.85%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Vancouver