BWXT Awarded Engineering Contract from GE Hitachi for BWRX-300 Small Modular Reactor
BWX Technologies (NYSE: BWXT) announced a significant engineering contract with GE Hitachi Nuclear Energy for the BWRX-300 small modular reactor (SMR) reactor pressure vessel (RPV). The RPV, crucial for the reactor core, will undergo engineering analysis, design support, and manufacturing preparations. This contract highlights BWXT's engineering strengths and supports increasing interest in SMR development across North America and Europe. The BWRX-300 is projected to have lower capital costs per MW compared to other SMR designs, enhancing its market viability. Forward-looking statements caution about potential risks like project delays and modifications.
- Awarded engineering contract for BWRX-300 SMR from GE Hitachi Nuclear Energy.
- Highlights BWXT's engineering capabilities in nuclear component design.
- BWRX-300 projected to require significantly less capital cost per MW compared to other SMR designs.
- Potential execution risks and uncertainties associated with the project.
- Possible delays in project timelines.
The RPV, which contains the reactor core and associated internals, comprises the largest component within the BWRX-300.
Work associated with the contract includes engineering analysis, design support, manufacturing and procurement preparations.
This announcement supports recent demonstrations of interest in SMR development by utilities and project developers across
“Intricate design projects like the RPV for GEH’s BWRX-300 are well-suited for BWXT’s engineering capabilities, as BWXT excels in supplying design solutions for complex nuclear components that BWXT can efficiently manufacture,” said
About the BWRX-300 Small Modular Reactor
The BWRX-300 is a 300 MWe water-cooled, natural circulation SMR with passive safety systems that leverages the design and licensing basis of GEH’s
Forward Looking Statements
BWXT cautions that this release contains forward-looking statements, including statements relating to the performance, design, suitability and impact of the RPV engineering contract for the BWRX-300 SMR. These forward-looking statements involve a number of risks and uncertainties, including, among other things, modification or termination of the project, execution of future contracts and delays. If one or more of these or other risks materialize, actual results may vary materially from those expressed. For a more complete discussion of these and other risk factors, please see BWXT’s annual report on Form 10-K for the year ended
About
View source version on businesswire.com: https://www.businesswire.com/news/home/20230321005309/en/
Media Contact
Senior Director, Corporate Affairs, BWXT Commercial Operations
519.242.8071 mamiller@bwxt.com
Investor Contact
Vice President, Investor Relations
980.365.4300 investors@bwxt.com
Source:
FAQ
What contract did BWXT announce on March 21, 2023?
What is the significance of the reactor pressure vessel in the BWRX-300 project?
What are the expected benefits of the BWRX-300 SMR design?
What are the risks associated with BWXT's contract for the BWRX-300?