Ameresco and U.S. Army Unveil Advanced Renewable Energy System at Fort Detrick

The Honorable Rachel Jacobson, the 17th Assistant Secretary of the
Ameresco’s energy asset activation is now live and features a 6 MW/6MWh battery energy storage system (BESS) that integrates seamlessly with an existing 18.6 MW (DC) solar energy facility, which has been operational since 2016. This integration not only boosts the facility’s capacity by providing frequency regulation services to the local electric grid but also enhances the overall energy security and sustainability of the installation by improving the power quality and correcting unintended fluctuations in generation.
“We’re proud to lead initiatives that not only bolster the
“The Army and industry partners like Ameresco share a common vision to create a sustainable, resilient, and clean energy future,” said the Assistant Secretary of the Army for Installations, Energy and Environment, Honorable Rachel Jacobson. “The 6 MW/h energy storage system we are inaugurating at
The
Today, a ribbon-cutting ceremony was held to celebrate the activation of the BESS. The event took place at the
For additional information on Ameresco and its energy solutions, visit www.ameresco.com.
About Ameresco, Inc.
Founded in 2000, Ameresco, Inc. (NYSE:AMRC) is a leading cleantech integrator and renewable energy asset developer, owner and operator. Our comprehensive portfolio includes solutions that help customers reduce costs, decarbonize to net zero, and build energy resiliency while leveraging smart, connected technologies. From implementing energy efficiency and infrastructure upgrades to developing, constructing, and operating distributed energy resources – we are a trusted sustainability partner. Ameresco has successfully completed energy saving, environmentally responsible projects with Federal, state and local governments, utilities, healthcare and educational institutions, housing authorities, and commercial and industrial customers. With its corporate headquarters in
The announcement of Ameresco’s completion of a renewable energy asset project is not necessarily indicative of the timing or amount of revenue from such arrangement, of the company’s overall revenue for any particular period or of trends in the company’s overall total assets in development or operation. This project was included in our previously reported assets in operation as of March 31, 2024.
View source version on businesswire.com: https://www.businesswire.com/news/home/20240618358644/en/
Media Contact:
Ameresco: Leila Dillon, 508-661-2264, news@ameresco.com
Source: Ameresco, Inc.