Arizona Sonoran Copper Company Inc (ASCUF) is a copper mining development company focused on the Cactus Project, a copper oxide and sulfide deposit located in Pinal County, Arizona. The company operates in the mining sector with a specific focus on developing copper resources in the southwestern United States.

The Cactus Project

The company's primary asset is the Cactus Project, which sits within Arizona's historic mining districts. Arizona Sonoran holds mineral rights and surface land necessary for developing this copper deposit. The project contains both oxide and sulfide copper mineralization, with the company working to advance the property through feasibility studies and permitting processes required for eventual mine development.

Business Model and Development Strategy

Arizona Sonoran operates as a development-stage mining company, meaning it does not yet generate revenue from copper production. Instead, the company focuses on proving the economic viability of its copper resources through technical studies, securing the necessary land and permits, and raising capital to fund development activities. The business model depends on successfully advancing the Cactus Project from exploration through feasibility studies to construction and eventual production.

Mining companies in this stage typically fund operations through equity financings, selling shares to investors who believe in the future value of the mineral deposit. Arizona Sonoran follows this pattern, conducting private placements to raise capital for drilling programs, metallurgical testing, engineering studies, and environmental assessments.

Copper Industry Context

Copper serves as a critical industrial metal used in electrical wiring, construction, electronics, and increasingly in renewable energy infrastructure and electric vehicles. The metal's conductivity makes it irreplaceable in many applications. Arizona has a long history of copper production, with several major mines operating in the state. Arizona Sonoran positions itself as a potential future supplier of domestically-sourced copper at a time when demand for the metal continues to grow globally.

Technical Development Approach

The company conducts geological studies to understand the size, grade, and characteristics of its copper deposit. This involves drilling programs to collect core samples, metallurgical testing to determine how the copper can be extracted and processed, and engineering studies to design a potential mining and processing operation. These technical studies culminate in feasibility reports that assess whether the project can be developed profitably.

For copper projects, key considerations include the grade of copper in the ore (how much copper per ton of rock), the mineralogy (whether the copper is in oxide or sulfide form affects processing methods), the depth and geometry of the deposit, and the proximity to infrastructure like roads, power, and water. Arizona Sonoran's work focuses on answering these questions for the Cactus Project.

Regulatory and Environmental Considerations

Developing a mine in the United States requires navigating complex permitting processes at federal, state, and local levels. This includes environmental impact assessments, water rights, air quality permits, and consultations with stakeholders. Mining companies must demonstrate how they will minimize environmental impacts and reclaim the land after mining concludes. These regulatory processes often take several years to complete and require significant documentation and community engagement.

Capital Requirements and Funding

Advancing a mining project from exploration to production requires substantial capital investment. Development-stage mining companies raise this capital through equity offerings, selling shares to investors in exchange for funding. Arizona Sonoran conducts these financings periodically, with the proceeds used to fund ongoing technical work, pay for permitting activities, and maintain operations. The amount of capital required depends on the scope and timeline of development activities.

Stock Performance

$—
0.00%
0.00
Last updated:
233.04 %
Performance 1 year
$327.0M

SEC Filings

No SEC filings available for ARIZONA SONORAN COPPER CO.

Financial Highlights

Revenue (TTM)
Net Income (TTM)
Operating Cash Flow

Upcoming Events

APR
12
April 12, 2026 Financial

Hold period expiry

4-month-and-1-day Canadian statutory hold on Pre-emptive Right Shares from closing
MAY
01
May 1, 2026 - August 31, 2026 Regulatory

APP & Industrial Air permits

Amendments for Cactus Project APP and Industrial Air permits; target mid-2026 approvals.
JUL
01
July 1, 2026 - December 31, 2026 Operations

Complete standalone DFS

Standalone Definitive Feasibility Study for Cactus Project targeted completion window
JUL
01
July 1, 2026 - December 31, 2026 Operations

DFS planned

Definitive Feasibility Study planned for Cactus Project
JUL
01
July 1, 2026 - December 31, 2026 Operations

Construction starts

Construction commencement for Cactus Project heap leach operation
SEP
01
September 1, 2026 - December 31, 2026 Corporate

MLRP approval and potential FID

MLRP amendment and potential final investment decision for Cactus Project; target late-2026.
OCT
01
October 1, 2026 - December 31, 2026 Corporate

Cactus Project FID

Final Investment Decision for the Cactus Project due by Q4 2026
OCT
01
October 1, 2026 - December 31, 2026 Operations

Final Investment Decision

Target Final Investment Decision for Cactus Project
OCT
01
October 1, 2026 - December 31, 2026 Financial

Project financing expected

Anticipated Cactus Project financing in Q4 2026
OCT
01
October 1, 2026 - December 31, 2026 Corporate

Possible final investment decision

Potential final investment decision (FID) for Cactus Project as early as 4Q 2026; timing uncertain

Short Interest History

Last 12 Months
Loading short interest data...

Days to Cover History

Last 12 Months
Loading days to cover data...

Frequently Asked Questions

What is the current stock price of ARIZONA SONORAN COPPER CO (ASCUF)?

The current stock price of ARIZONA SONORAN COPPER CO (ASCUF) is $3.73 as of January 11, 2026.

What is the market cap of ARIZONA SONORAN COPPER CO (ASCUF)?

The market cap of ARIZONA SONORAN COPPER CO (ASCUF) is approximately 327.0M. Learn more about what market capitalization means .

What does Arizona Sonoran Copper Company do?

Arizona Sonoran is a development-stage mining company focused on advancing the Cactus Project, a copper deposit in Pinal County, Arizona. The company conducts technical studies, permitting work, and capital raising to develop this copper resource toward eventual production.

Where is the Cactus Project located?

The Cactus Project is located in Pinal County, Arizona, within the state's historic mining districts. Arizona has a long history of copper mining and hosts several major producing copper mines.

How does Arizona Sonoran generate revenue?

As a development-stage company, Arizona Sonoran does not currently generate revenue from copper sales. The company funds its operations through equity financings, raising capital from investors to advance the Cactus Project through feasibility studies and permitting.

What type of copper deposit is the Cactus Project?

The Cactus Project contains both copper oxide and copper sulfide mineralization. The mineralogy affects how the copper would be extracted and processed if the project advances to production.

What stages must a copper project complete before production?

Copper projects typically progress through exploration, resource definition, feasibility studies, permitting, financing, construction, and finally production. Arizona Sonoran is working through the feasibility and permitting stages for the Cactus Project.

Why is copper important as an industrial metal?

Copper's exceptional electrical conductivity makes it essential for electrical wiring, electronics, construction, and infrastructure. Growing demand comes from renewable energy systems and electric vehicles, which use significantly more copper than traditional vehicles.

What are the main risks for development-stage mining companies?

Development-stage mining companies face risks including the ability to prove economic viability of deposits, securing necessary permits, raising sufficient capital, commodity price fluctuations, and successfully navigating the transition from development to production.

How long does it typically take to develop a copper mine?

Developing a copper mine from discovery through to production typically takes many years, often a decade or more, depending on the complexity of permitting, the scale of the project, capital availability, and commodity market conditions.