STOCK TITAN

U.S. GoldMining Inc. Commences Metallurgical Testwork At Whistler Gold-Copper Project, Alaska

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Neutral)
Tags

U.S. GoldMining Inc. (NASDAQ: USGO) has initiated metallurgical testwork for its Whistler Gold-Copper Project in Alaska, located 105 miles northwest of Anchorage. The testwork will support the project's preliminary economic assessment (PEA) and aims to develop an optimized process flowsheet for metal recovery.

The company has engaged Base Metallurgical Laboratories (BaseMet) to conduct comprehensive testing, including:

  • Preparation of variability and master composites from 2023-2024 drill core samples
  • Feed characterization and detailed mineralogy
  • Comminution testing for crushing and grinding
  • Sulphide flotation testing for chalcopyrite concentrate
  • Gravity gold and cyanide leaching tests

Previous metallurgical tests showed promising results with gold recovery at 70% and copper recovery at 83% through conventional flotation, producing a high-quality copper concentrate with gold and silver credits. The company aims to optimize these recovery rates through the current testing program.

U.S. GoldMining Inc. (NASDAQ: USGO) ha avviato test metallurgici per il suo Whistler Gold-Copper Project in Alaska, situato a 105 miglia a nord-ovest di Anchorage. I test supporteranno la valutazione economica preliminare (PEA) del progetto e mirano a sviluppare un flusso di processo ottimizzato per il recupero dei metalli.

L'azienda ha incaricato il Base Metallurgical Laboratories (BaseMet) di condurre test completi, che includono:

  • Preparazione di compositi di variabilità e master dai campioni di carotaggi 2023-2024
  • Caratterizzazione del materiale e mineralogia dettagliata
  • Test di frantumazione e macinazione
  • Test di flottazione dei solfuri per il concentrato di calcopirite
  • Test di oro per gravità e lisciviazione con cianuro

I precedenti test metallurgici hanno mostrato risultati promettenti con un recupero dell'oro al 70% e del rame all'83% tramite flottazione convenzionale, producendo un concentrato di rame di alta qualità con crediti in oro e argento. L'azienda punta a ottimizzare questi tassi di recupero attraverso il programma di test attuale.

U.S. GoldMining Inc. (NASDAQ: USGO) ha iniciado pruebas metalúrgicas para su Proyecto de Oro y Cobre Whistler en Alaska, ubicado a 105 millas al noroeste de Anchorage. Estas pruebas apoyarán la evaluación económica preliminar (PEA) del proyecto y buscan desarrollar un diagrama de flujo optimizado para la recuperación de metales.

La compañía contrató a Base Metallurgical Laboratories (BaseMet) para realizar pruebas exhaustivas que incluyen:

  • Preparación de compuestos de variabilidad y maestros a partir de muestras de núcleos de perforación 2023-2024
  • Caracterización del material y mineralogía detallada
  • Pruebas de conminución para trituración y molienda
  • Pruebas de flotación de sulfuros para concentrado de calcopirita
  • Pruebas de oro por gravedad y lixiviación con cianuro

Pruebas metalúrgicas anteriores mostraron resultados prometedores con una recuperación de oro del 70% y de cobre del 83% mediante flotación convencional, produciendo un concentrado de cobre de alta calidad con créditos de oro y plata. La compañía busca optimizar estas tasas de recuperación mediante el programa de pruebas actual.

U.S. GoldMining Inc. (NASDAQ: USGO)는 알래스카에 위치한 Whistler 금-구리 프로젝트에 대한 야금 시험 작업을 시작했습니다. 이 프로젝트는 앵커리지에서 북서쪽으로 105마일 떨어져 있습니다. 이번 시험 작업은 프로젝트의 예비 경제성 평가(PEA)를 지원하고 금속 회수를 위한 최적화된 공정 흐름도를 개발하는 것을 목표로 합니다.

회사는 Base Metallurgical Laboratories (BaseMet)에 포괄적인 시험을 의뢰했으며, 시험 내용은 다음과 같습니다:

  • 2023-2024년 시추 코어 샘플로부터 변동성 및 마스터 복합체 준비
  • 원료 특성 분석 및 상세 광물학
  • 분쇄 및 연삭을 위한 파쇄 시험
  • 황화광 부유선별 시험(황동석 농축물)
  • 중력 금 회수 및 시안화 침출 시험

이전 야금 시험에서는 금 회수율 70%, 구리 회수율 83%의 유망한 결과를 보였으며, 전통적인 부유선별법을 통해 금과 은 크레딧이 포함된 고품질 구리 농축물을 생산했습니다. 회사는 현재 시험 프로그램을 통해 이러한 회수율을 최적화하는 것을 목표로 하고 있습니다.

U.S. GoldMining Inc. (NASDAQ: USGO) a lancé des essais métallurgiques pour son projet Whistler Gold-Copper en Alaska, situé à 105 miles au nord-ouest d'Anchorage. Ces essais soutiendront l'évaluation économique préliminaire (PEA) du projet et visent à développer un procédé optimisé pour la récupération des métaux.

La société a fait appel à Base Metallurgical Laboratories (BaseMet) pour réaliser des tests complets, comprenant :

  • Préparation de composites de variabilité et maîtres à partir des échantillons de carottes de forage 2023-2024
  • Caractérisation de l'alimentation et minéralogie détaillée
  • Tests de concassage et broyage
  • Tests de flottation des sulfures pour le concentré de chalcopyrite
  • Tests de récupération de l'or par gravité et de lixiviation au cyanure

Les essais métallurgiques précédents ont montré des résultats prometteurs avec un taux de récupération de l'or de 70 % et du cuivre de 83 % par flottation conventionnelle, produisant un concentré de cuivre de haute qualité avec des crédits en or et argent. La société vise à optimiser ces taux de récupération grâce au programme actuel de tests.

U.S. GoldMining Inc. (NASDAQ: USGO) hat metallurgische Testarbeiten für sein Whistler Gold-Kupfer-Projekt in Alaska gestartet, das 105 Meilen nordwestlich von Anchorage liegt. Die Testarbeiten sollen die vorläufige wirtschaftliche Bewertung (PEA) des Projekts unterstützen und einen optimierten Prozessablauf für die Metallrückgewinnung entwickeln.

Das Unternehmen hat Base Metallurgical Laboratories (BaseMet) mit umfassenden Tests beauftragt, die Folgendes umfassen:

  • Vorbereitung von Variabilitäts- und Masterkompositen aus Bohrkernproben von 2023-2024
  • Futtercharakterisierung und detaillierte Mineralogie
  • Zerkleinerungs- und Mahlversuche
  • Schwefelaufschlussschwebungstests für Chalkopyritkonzentrat
  • Schwerkraftgold- und Cyanidlaugungstests

Frühere metallurgische Tests zeigten vielversprechende Ergebnisse mit einer Goldrückgewinnung von 70 % und einer Kupferrückgewinnung von 83 % durch konventionelle Flotation, wobei ein hochwertiges Kupferkonzentrat mit Gold- und Silbergutschriften produziert wurde. Das Unternehmen strebt an, diese Rückgewinnungsraten durch das aktuelle Testprogramm zu optimieren.

Positive
  • Previous metallurgical tests demonstrated strong recovery rates: 70% for gold and 83% for copper
  • Project produces high-quality, saleable copper concentrate with gold and silver credits
  • Potential for improved gold recoveries through additional cyanide leaching optimization
Negative
  • None.

ANCHORAGE, Alaska, April 24, 2025 /PRNewswire/ - U.S. GoldMining Inc. (NASDAQ: USGO) ("U.S. GoldMining" or the "Company") is pleased to announce it has commenced metallurgical testwork, which will help to inform the proposed initial economic assessment for the Whistler Gold-Copper Project ("Whistler" or the "Project"), located 105 miles northwest of Anchorage, Alaska. As previously announced on April 15, 2025, the proposed study (the "PEA") will be intended to constitute an initial assessment under U.S. Regulation S-K 1300 ("S-K 1300") and a preliminary economic assessment under Canadian National Instrument 43-101 ("NI 43-101").

Highlights:

  • The principal aim of the metallurgical testwork is to develop a preliminary process flowsheet optimized for metal recovery for the Whistler gold-copper mineralization, that will be used in the proposed PEA.
  • The Company has engaged Base Metallurgical Laboratories Ltd., ("BaseMet") located in Kamloops, B.C., Canada, to undertake the testwork. BaseMet's specialties include mineral processing, gold extraction technologies, comminution, geometallurgy and applied mineralogy, with experience gained throughout North America and internationally across dozens of gold-copper projects for some of the largest mining companies in the world.
  • Metallurgical testwork will comprise:
    • Preparation of variability composites and a master composite prepared from drill core samples collected at the Whistler Deposit during the 2023 – 2024 drill seasons.
    • Feed characterization by head assaying and QEMSCAN (scanning electron microscopy) mineralogy.
    • Detailed mineralogy on the master composite, including a gold deportment study.
    • Comminution testing to determine the crushing and grinding process.
    • Sulphide flotation testing to determine the chalcopyrite concentrate process path.
    • Gravity gold and cyanide leaching on concentrate tailings to further optimize gold recoveries. 

Tim Smith, Chief Executive Officer of U.S. GoldMining, commented: "The Company is delighted to kick off one of the cornerstone studies intended to inform a robust PEA for the Project. Previous metallurgical testwork concluded that the Whistler gold-copper porphyry mineralization is amenable to a conventional flotation route that produces a saleable high quality copper concentrate with gold and silver credits. With previous testwork indicating recoveries of 70% and 83% for gold and copper respectively, we believe that there is room for recovery optimization. Our mission with this current round of testwork is to follow-up on the previous conventional flotation testwork and to optimize the process path. Additional variability data points will enable us to understand metal recoveries in different parts of the deposit, and to quantify the extent to which cyanide leaching can potentially return improved gold recoveries." 

About U.S. GoldMining Inc.

U.S. GoldMining Inc. is an exploration and development company focused on advancing the 100% owned Whistler Gold-Copper Project, located 105 miles (170 kilometers) northwest of Anchorage, Alaska, U.S.A. The Whistler Project consists of several gold-copper porphyry deposits and exploration targets within a large regional land package entirely on State of Alaska mining claims totaling approximately 53,700 acres (217.5 square kilometers). The Whistler Project Mineral Resource Estimate comprises 294 Mt at 0.68 g/t AuEq for 6.48 Moz AuEq Indicated, plus 198 Mt at 0.65 g/t AuEq for 4.16 Moz AuEq Inferred.

For further information regarding the Project, refer to the technical report summary titled "S-K 1300 Technical Report Summary Initial Assessment for the Whistler Project, South Central Alaska" with an effective date of September 12, 2024, and the technical report titled "NI 43-101 2024 Updated Mineral Resource Estimate for the Whistler Project, South Central Alaska" with an effective date of September 12, 2024, available under the Company's respective profiles at www.sec.gov and www.sedarplus.ca.

Tim Smith, P.Geo., Chief Executive Officer of the Company, has supervised the preparation of this news release and has reviewed and approved the scientific and technical information contained herein. Mr. Smith is a "qualified person" as defined under NI 43-101.

Visit www.usgoldmining.us for more information.

Forward-Looking Statements

Except for the statements of historical fact contained herein, the information presented in this news release constitutes "forward-looking statements" within the meaning of the United States federal securities laws and "forward-looking information" within the meaning of applicable Canadian securities laws (collectively, "forward-looking statements"). Such statements include statements with regard to the Company's plans expectations regarding the Project, including the proposed metallurgical testwork and the PEA. Words such as "expects", "anticipates", "plans", estimates" and "intends" or similar expressions are intended to identify forward-looking statements. Forward-looking statements are based on U.S. GoldMining's current expectations and are subject to inherent uncertainties, risks and assumptions that are difficult to predict and involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such risks and other factors include, among others, the actual results of future exploration may not confirm expectations, variations in the underlying assumptions associated with the estimation or realization of mineral resources, the availability of capital to fund programs, accidents, labor disputes and other risks of the mining industry including, without limitation, those associated with the environment, delays in obtaining governmental approvals or permits, title disputes other risks inherent in the exploration and development of mineral properties and the other risk factors set forth in the Company's filings with the U.S. Securities and Exchange Commission at www.sec.gov and Canadian Securities Administrators at www.sedarplus.ca. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements contained in this news release. Forward-looking statements contained in this news release are made as of this date, and U.S. GoldMining does not undertake any duty to update such information except as required under applicable law.

Cision View original content:https://www.prnewswire.com/news-releases/us-goldmining-inc-commences-metallurgical-testwork-at-whistler-gold-copper-project-alaska-302436202.html

SOURCE U.S. GoldMining Inc.

FAQ

What are the current metal recovery rates for USGO's Whistler Project?

Previous testwork showed recovery rates of 70% for gold and 83% for copper through conventional flotation processes.

Where is USGO's Whistler Gold-Copper Project located?

The Whistler Project is located 105 miles northwest of Anchorage, Alaska.

What is the purpose of USGO's new metallurgical testwork program?

The testwork aims to develop an optimized process flowsheet for metal recovery and inform the project's preliminary economic assessment (PEA).

Which laboratory is conducting the metallurgical testing for USGO's Whistler Project?

Base Metallurgical Laboratories (BaseMet) in Kamloops, B.C., Canada, is conducting the testwork.

What testing methods will be used in USGO's metallurgical program?

The program includes feed characterization, QEMSCAN mineralogy, comminution testing, sulphide flotation testing, and gravity gold and cyanide leaching tests.
U.S. Goldmining Inc.

NASDAQ:USGO

USGO Rankings

USGO Latest News

USGO Stock Data

134.59M
1.59M
87.36%
5.13%
0.33%
Other Industrial Metals & Mining
Gold and Silver Ores
Link
Canada
VANCOUVER, BC