Talisker Intersects 56.88 g/t Au over 1.00 Metre from the Bralorne Gold Project Resource Conversion Program
- None.
- None.
TORONTO, April 17, 2024 (GLOBE NEWSWIRE) -- Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX:TSK | OTCQX:TSKFF) is pleased to announce additional high-grade drill results highlighted by 56.88 g/t Au over 1.00 metre at its
Key Points:
- Talisker initiated resource conversion drilling on October 17, 2023, with 15,000 metres of planned drilling and completed the program on February 15, 2024.
- Hole SB-2024-018 intersected 56.88 g/t Au over 1.00 metres on the BK-9870 Splay Vein.
- Hole SB-2024-018 also intersected 11.74 g/t Au over 2.15 metres within a broader intercept of 3.31 g/t Au over 11.00 metres on the BK-9870 Vein.
- Hole SB-2024-007 intersected 8.81 g/t Au over 4.15 metres within a broader intercept of 3.34 g/t Au over 17.75 metres on the BK-9870 Vein.
- Hole SB-2024-007 also intersected 8.08 g/t Au over 2.20 metres on the Alhambra Vein.
- The resource conversion drill program focused on increasing confidence in the Alhambra, BK and BK-9870 Veins.
- A total of 81 drill holes were drilled during the resource conversion program, totaling 14,949 metres.
- All assays have been received from Q4 2023 and Q1 2024 drilling.
SB-2024-007 Hole Description
- All assays have been received.
- Located in the King block and hosted in diorite intrusive.
- Intersected BK-9870 Vein from 55.35 – 59.50 metres.
- Intersected Alhambra Vein from 133.80 – 136.00 metres.
SB-2024-018 Hole Description
- All assays have been received.
- Located in the King block and hosted in diorite intrusive.
- Intersected BK-9870 Splay Vein from 245.50 – 246.50 metres.
- Intersected BK-9870 Vein from 283.15 – 285.30 metres.
Major vein structures intersected are considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica-sericite±mariposite alteration halos.
Bralorne Gold Project | |||||
Drill Hole SB-2024-007 and 2024-018 | |||||
Drill Hole Name | From (m) | To (m) | Interval (m) | Au (g/t) | Interpreted Structure |
SB-2024-007 | 49 | 49.8 | 0.8 | 0.42 | BK-9870 Vein Halo |
SB-2024-007 | 49.8 | 50.3 | 0.5 | 1.52 | |
SB-2024-007 | 50.3 | 51.1 | 0.8 | 4.30 | |
SB-2024-007 | 51.1 | 51.6 | 0.5 | 4.86 | |
SB-2024-007 | 51.6 | 52.25 | 0.65 | 2.72 | |
SB-2024-007 | 52.25 | 53.5 | 1.25 | 1.03 | |
SB-2024-007 | 53.5 | 54 | 0.5 | 2.58 | |
SB-2024-007 | 54 | 54.85 | 0.85 | 0.77 | |
SB-2024-007 | 54.85 | 55.35 | 0.5 | 2.36 | |
SB-2024-007 | 55.35 | 55.85 | 0.5 | 43.00 | BK-9870 Vein |
SB-2024-007 | 55.85 | 56.35 | 0.5 | 3.10 | |
SB-2024-007 | 56.35 | 57 | 0.65 | 4.48 | |
SB-2024-007 | 57 | 58 | 1 | 3.80 | |
SB-2024-007 | 58 | 58.9 | 0.9 | 2.14 | |
SB-2024-007 | 58.9 | 59.5 | 0.6 | 8.11 | |
SB-2024-007 | 59.5 | 60 | 0.5 | 2.90 | BK-9870 Vein Halo |
SB-2024-007 | 60 | 61 | 1 | 1.67 | |
SB-2024-007 | 61 | 62 | 1 | 0.94 | |
SB-2024-007 | 62 | 63.05 | 1.05 | 0.19 | |
SB-2024-007 | 63.05 | 63.55 | 0.5 | 5.80 | |
SB-2024-007 | 63.55 | 64.15 | 0.6 | 0.36 | |
SB-2024-007 | 64.15 | 65 | 0.85 | 0.02 | |
SB-2024-007 | 65 | 66 | 1 | 1.78 | |
SB-2024-007 | 66 | 66.75 | 0.75 | 0.63 | |
SB-2024-007 | 133.8 | 134.3 | 0.5 | 3.98 | Alhambra Vein |
SB-2024-007 | 134.3 | 134.85 | 0.55 | 21.10 | |
SB-2024-007 | 134.85 | 135.35 | 0.5 | 3.23 | |
SB-2024-007 | 135.35 | 136 | 0.65 | 3.94 | |
SB-2024-018 | 245.5 | 246 | 0.5 | 0.25 | BK-9870 Splay Vein |
SB-2024-018 | 246 | 246.5 | 0.5 | 113.50 | |
SB-2024-018 | 279.5 | 281 | 1.5 | 0.48 | BK-9870 Vein Halo |
SB-2024-018 | 281 | 282 | 1 | 0.58 | |
SB-2024-018 | 282 | 282.65 | 0.65 | 0.25 | |
SB-2024-018 | 282.65 | 283.15 | 0.5 | 0.40 | |
SB-2024-018 | 283.15 | 283.65 | 0.5 | 3.06 | BK-9870 Vein |
SB-2024-018 | 283.65 | 284.3 | 0.65 | 30.20 | |
SB-2024-018 | 284.3 | 284.8 | 0.5 | 1.71 | |
SB-2024-018 | 284.8 | 285.3 | 0.5 | 6.46 | |
SB-2024-018 | 285.3 | 286.3 | 1 | 0.42 | BK-9870 Vein Halo |
SB-2024-018 | 286.3 | 287.8 | 1.5 | 2.20 | |
SB-2024-018 | 287.8 | 289 | 1.2 | 4.55 | |
SB-2024-018 | 289 | 290.5 | 1.5 | 0.22 | |
Notes: Diamond drill hole SB-2024-007 has a collar orientation of Azimuth 112; Dip -78. Diamond drill hole SB-2024-018 has a collar orientation of Azimuth 200.5; Dip -50.5. True widths are estimated at 40 - |
All reported drill assay results are available on the Company’s website.
For further information, please contact:
Terry Harbort President and CEO terry.harbort@taliskerresources.com +1 416 357 0227 | Matt Filgate Vice President, Corporate Development matt.filgate@taliskerresources.com +1 778 679 3579 |
Qualified Person
The technical information contained in this news release relating to the drill results at the Bralorne Gold Project has been approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified person” within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.
About Talisker Resources Ltd.
Talisker (taliskerresources.com) is a junior resource company involved in the exploration and development of gold projects in British Columbia, Canada. Talisker’s flagship asset is the high-grade, fully permitted Bralorne Gold Project where the Company is currently transitioning into underground production at the Mustang Mine. Talisker projects also include the Ladner Gold Project, an advanced stage project with significant exploration potential from an historical high-grade producing gold mine and the Spences Bridge Project where the Company holds ~
Sample Preparation and QAQC
Drill core at the Bralorne Gold Project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm, respectively). Drill core samples are a minimum of 50 cm and a maximum of 160 cm long along the core axis. Samples are focused on an interval of interest, such as a vein or zone of mineralization. Shoulder samples bracket the interval of interest such that a total sampled core length of not less than 3m both above and below the interval of interest must be assigned. Sample QAQC measures of unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and makeup
Caution Regarding Forward Looking Statements
Certain statements contained in this press release constitute forward-looking information. The use of any of the words “could”, “intend”, “expect”, “believe”, “will”, “projected”, “estimated” and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker’s current belief or assumptions as to the outcome and timing of such future events. Various assumptions or factors are typically applied in drawing conclusions or making the forecasts or projections set out in forward-looking information. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker’s management, there can be no assurance that any conclusions or forecasts will prove to be accurate.
Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and supply of minerals, risks related to increased competition and current global financial conditions, access and supply risks, reliance on key personnel, operational risks, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, title and environmental risks and risks relating to the failure to receive all requisite shareholder and regulatory approvals.
The forward-looking information contained in this release is made as of the date hereof, and Talisker is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.
Figure 1: Plan view showing locations of SB-2024-007 and 2024-018 in relation to the proposed Mustang Mine development.
Figure 2: Cross section showing the SB-2024-007 drill hole intersection on the BK-9870 and Alhambra Vein.
Figure 3: Cross section showing the SB-2024-018 drill hole intersection on the BK-9870 Vein.
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/a767862f-9760-42f8-ae76-26aa21d6d493
https://www.globenewswire.com/NewsRoom/AttachmentNg/437acfcf-ca27-4b87-b75b-e0dc0a313486
https://www.globenewswire.com/NewsRoom/AttachmentNg/13433235-fdce-41c8-b92f-14f092060da0
FAQ
What is the latest high-grade drill result announced by Talisker Resources at the Bralorne Gold Project?
What was the focus of the resource conversion drill program at the Bralorne Gold Project?
Who is the President and CEO of Talisker Resources ?