Stamford Bridge Delivers Again – Another Best Drill Intercept
TRX Gold announces exceptional drill results from the Stamford Bridge Shear Zone, with hole BMDD315 intersecting 37 metres @ 6.86 g/t Au from 130m, including 23m @ 9.31 g/t Au from 139m. This represents the best drill hole result in Buckreef Gold's history, extending the zone another 50 meters. The new mineralized shear zone, located approximately 250m east of the Buckreef Main Zone, shows similar geological characteristics to the main deposit which hosts 2M+ ounce Au Mineral Resource. The company is preparing for a geophysical survey campaign covering the Stamford Bridge trend line and surrounding areas to define high-priority targets for future drilling.
TRX Gold annuncia risultati eccezionali da perforazione nella Stamford Bridge Shear Zone, con il foro BMDD315 che ha intercettato 37 metri a 6,86 g/t Au a partire da 130m, inclusi 23m a 9,31 g/t Au da 139m. Questo rappresenta il miglior risultato di perforazione nella storia di Buckreef Gold, estendendo la zona di ulteriori 50 metri. La nuova zona di frattura mineralizzata, situata a circa 250m a est della Buckreef Main Zone, mostra caratteristiche geologiche simili a quelle del deposito principale che ospita oltre 2 milioni di once di risorse minerarie di Au. L'azienda si sta preparando per una campagna di indagine geofisica che coprirà la tendenza di Stamford Bridge e le aree circostanti per definire obiettivi ad alta priorità per future perforazioni.
TRX Gold anuncia resultados de perforación excepcionales de la Stamford Bridge Shear Zone, con el pozo BMDD315 intersectando 37 metros a 6.86 g/t Au desde 130m, incluidos 23m a 9.31 g/t Au desde 139m. Este representa el mejor resultado de perforación en la historia de Buckreef Gold, extendiendo la zona otros 50 metros. La nueva zona de cizalla mineralizada, ubicada aproximadamente a 250m al este de la Buckreef Main Zone, muestra características geológicas similares al depósito principal que alberga más de 2 millones de onzas de recursos minerales de Au. La empresa se está preparando para una campaña de encuesta geofísica que cubrirá la línea de tendencia de Stamford Bridge y áreas circundantes para definir objetivos de alta prioridad para futuras perforaciones.
TRX Gold는 스탬포드 브리지 전단대에서 예외적인 시추 결과를 발표하며, 구멍 BMDD315가 130m에서 6.86 g/t Au로 37미터를 교차하고, 139m에서 9.31 g/t Au로 23미터를 포함합니다. 이는 Buckreef Gold의 역사상 최고의 시추 구멍 결과로, 해당 구역을 추가로 50미터 연장합니다. 새로운 광물화된 전단대는 Buckreef Main Zone의 동쪽 약 250m 지점에 위치해 있으며, 200만 온스 이상의 Au 광물 자원을 보유한 주요 매장지와 유사한 지질학적 특성을 보여줍니다. 회사는 스탬포드 브리지 트렌드라인과 주변 지역을 포괄하는 지구물리학 조사 캠페인을 준비하고 있으며, 향후 시추를 위한 고우선 목표를 정의할 계획입니다.
TRX Gold annonce des résultats de forage exceptionnels de la Stamford Bridge Shear Zone, avec le trou BMDD315 intersectant 37 mètres à 6,86 g/t Au à partir de 130m, y compris 23m à 9,31 g/t Au à partir de 139m. Cela représente le meilleur résultat de forage de l'histoire de Buckreef Gold, prolongeant la zone de 50 mètres supplémentaires. La nouvelle zone de cisaillement minéralisée, située à environ 250m à l'est de la Buckreef Main Zone, présente des caractéristiques géologiques similaires à celles du dépôt principal qui abrite plus de 2 millions d'onces de ressources minérales en Au. L'entreprise se prépare à une campagne d'enquête géophysique couvrant la ligne de tendance de Stamford Bridge et les zones environnantes afin de définir des cibles prioritaires pour les forages futurs.
TRX Gold gibt außergewöhnliche Bohrergebnisse aus der Stamford Bridge Shear Zone bekannt, wobei das Bohrloch BMDD315 37 Meter bei 6,86 g/t Au ab 130m durchschneidet, einschließlich 23m bei 9,31 g/t Au ab 139m. Dies stellt das beste Bohrloch-Ergebnis in der Geschichte von Buckreef Gold dar, wobei die Zone um weitere 50 Meter verlängert wird. Die neue mineralisierte Scherzone, die sich etwa 250m östlich der Buckreef Main Zone befindet, zeigt ähnliche geologische Merkmale wie das Hauptvorkommen, das über 2 Millionen Unzen Au-Ressourcen beherbergt. Das Unternehmen bereitet eine geophysikalische Erkundungskampagne vor, die die Stamford Bridge-Trendlinie und die umliegenden Gebiete abdecken soll, um hochpriorisierte Ziele für zukünftige Bohrungen zu definieren.
- Best drill hole result in company history: 37m @ 6.86 g/t Au
- Extension of mineralized zone by additional 50 meters
- New shear zone discovered near existing 2M+ ounce resource
- Consistent 100% core recovery across all drill holes
- True width estimated at only 50-60% of reported intersection length
Insights
This is a highly significant drill result for TRX Gold, marking their best intercept to date at the Stamford Bridge Zone. The headline intersection of 37 meters at 6.86 g/t Au, including 23 meters at 9.31 g/t Au, represents exceptional grades over substantial widths. These grades are significantly above the typical economic threshold for open-pit gold mining.
The discovery extends the mineralized zone by another 50 meters along strike, suggesting potential for a much larger resource. The geological similarities to the main Buckreef deposit (which hosts 2+ million ounces) and the ENE trending shear zone structure indicate strong potential for resource expansion. The location between existing deposits could enable operational synergies if development proceeds.
The upcoming geophysical survey covering up to 500 meters on both sides of the trend line could identify additional drill targets and help define the full extent of mineralization. For a company with a market cap of just
New Stamford Bridge shear zone extended another 50 meters
TORONTO, Nov. 12, 2024 (GLOBE NEWSWIRE) -- TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) (the “Company” or “TRX Gold”) is excited to announce, once again, another best drill results ever, on a gram x tonne x meters (“gtm”) basis with hole BMDD315 intersecting 37 metres (“m”) @ 6.86 g/t Au (253.82 gtm) from 130 m. This drill hole result is approximately 250 m east of the Buckreef Main Zone—host to Buckreef Gold’s 2M+ ounce Au Mineral Resource1 and where current operations are ongoing in the Main Pit—and is located at the project’s newly discovered Stamford Bridge Shear Zone (see Figure 1).
This drill hole result comes following the Company’s previous drill results, dated October 24, whereby the Company announced the discovery of a promising new gold mineralization shear zone, named the Stamford Bridge Zone, at which results are revealing geological characteristics and mineral alterations similar to that at Buckreef’s Main Zone.
On the heels of this exciting new discovery, the Stamford Bridge shear zone has quickly become the Company’s exploration priority. An exploration program is underway to uncover the area’s true gold mineralisation potential. Over the next few weeks, the Buckreef Gold team will be preparing for the kick-off of a geophysical survey campaign, which will focus on the Stamford Bridge trend line, as well as an area covering up to 500 meters to both the North and South sides of the trend line. Following the results of this campaign, a strategic drill campaign will resume on newly defined, high-priority targets.
Significance of this latest drill intercept:
- Hole BMDD315 intersected 37 m @ 6.86 g/t Au from 130 m; including 23 m @ 9.31 g/t Au from 139 m. This is the best drill hole result ever in the history of Buckreef Gold’s database, and is 50 meters further along the bridge than the last hole (see Figure 2);
- This intercept continues to confirm a “bridge” or an interpreted mineralized shear zone trending 070 degrees (ENE) that is showing potential to extend to over 1 kilometer. To date, intersections reported over the last few weeks cover approximately 150 meters of strike length (See Figure 1);
- The Stamford Bridge Zone is a potentially significant shear zone and geologically similar to the Buckreef Main Zone. It bridges the gap between the Buckreef Main Zone and the Eastern Porphyry deposit and Anfield Zone, to the Southeast (see Figure 1).
Isaac Bisansaba, Manager of Technical Services at Buckreef Gold, explains, “We are eager to begin the detailed ground geophysics work, as results should enable us to plan very strategic drill targets, and ultimately help us to define the direction and length of this new shear structure.”
Stephen Mullowney, TRX Gold CEO continues, “This is a very exciting blue-sky potential-type of drill result! We’ve confirmed this new shear structure to another 50 meters along strike. Although this is early in the drill campaign, results to date are very encouraging. The Buckreef Gold Project still has very good discovery potential built-in to its underexplored 16km2 land package and we intend to unlock that value and ultimately grow the Mineral Resource of the project beyond its current 2 million ounces,” commented Stephen Mullowney, TRX Gold Chief Executive Officer.
Figure 1. Buckreef Gold Property Showing Location of Latest Drill Hole BMDD315 Among Previous Results Along Stamford Bridge Zone
Figure 2. Cross-section results for new drill hole BMDD315 - Stamford Bridge Zone
Table 1: Summary of Results – Stamford Bridge
Hole ID | Hole Type | Drill Holes Location | Sample Depth | Width (m) | Assay Grade (gpt) | Lithology | Comment | |||||
Easting (m) | Northing (m) | RL (m) | Azimuth | Dip | From (m) | To (m) | ||||||
BMGT001 | DD | 391,780 | 9,658,453 | 1,217.8 | 270 | -50 | 104.00 | 115.39 | 11.39 | 2.80 | Msh | Stamford Bridge Mineralised shear zone with strong alteration |
186.00 | 208.00 | 22.00 | 2.36 | Msh | ||||||||
393.00 | 425.80 | 32.80 | 1.70 | Msh | Buckreef Main mineralised shear zone | |||||||
BMDD309 | DD | 391,676 | 9,658,400 | 1,216.6 | 334 | -60 | 101.80 | 104.50 | 2.70 | 1.65 | Msh | Mineralised shear zone with strong alteration |
BMDD310 | DD | 391,723 | 9,658,418 | 1,217.2 | 334 | -60 | 64.50 | 100.00 | 35.50 | 5.48 | Msh | Mineralised shear zone with strong alteration |
Including | 76.00 | 89.00 | 13.00 | 8.06 | ||||||||
BMDD312 | DD | 391,685 | 9,658,382 | 1,216.4 | 335 | -60 | 164.60 | 181.80 | 17.20 | 3.14 | Msh | Mineralised shear zone with strong alteration |
BMDD315 | DD | 391,770 | 9,658,435 | 1,217.6 | 335 | -60 | 130.00 | 167.00 | 37.00 | 6.86 | Msh | Mineralised shear zone with strong alteration |
Including | 139.00 | 162.00 | 23.00 | 9.31 |
Qualified Person
Mr. William van Breugel, P.Eng, BASc (Hons), technical Advisor to TRX Gold Corporation, is the Company’s Qualified Person under National Instrument 43-101 “Standards of Disclosure for Mineral Projects” (“NI 43-101”) and has reviewed and assumes responsibility for the scientific and technical content in this press release.
Sample Protocol QA/QC
The sample chain of custody is managed by the Buckreef geology team on site. Reported results are from diamond drilled core samples. Intervals of core to be analyzed are split into half using a mechanized core cutter, with one half sent to the Laboratory for geochemical analysis and the remaining half kept in storage for future reference and uses. Diamond drilled core has been a HQ size and recoveries are consistently
Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control program. The QAQC program involves insertion of duplicate samples, blanks and certified reference materials in the sample stream. Gold analyses are performed by standard fire assaying protocols using a 50-gram charge with atomic absorption (AAS) finish and a gravimetric finish performed for assays greater than 10 grams per tonne.
Sample Preparation and analysis are performed by independent SGS Laboratory in Mwanza, Tanzania. SGS Laboratory is ISO17025 accredited and employs a Laboratory Information Management System for sample tracking, quality control and reporting.
The results summarized in this release are from Stamford Bridge target. The intercepts confirm an interpreted mineralized shear zone trending 070 degrees (ENE) that is over a km long. The intersections reported here has covered only the first 100m strike length, they are down-hole lengths and may not represent true width, however the true width is estimated to be between
About TRX Gold Corporation
TRX Gold is rapidly advancing the Buckreef Gold Project. Anchored by a Mineral Resource published in May 2020, the project currently hosts an NI 43-101 Measured and Indicated Mineral Resource of 35.88 MT at 1.77 g/t gold containing 2,036,280 oz of gold and an Inferred Mineral Resource of 17.8 MT at 1.11g/t gold for 635,540 oz of gold. The leadership team is focused on creating both near-term and long-term shareholder value by increasing gold production to generate positive cash flow. The positive cash flow will be utilized for exploratory drilling with the goal of increasing the current gold Resource base and advancing the Sulphide Ore Project which represents
For investor or shareholder inquiries, please contact:
Investor Relations
Christina Lalli
Vice President, Investor Relations
TRX Gold Corporation
+1-438-399-8665
c.lalli@TRXgold.com
www.TRXgold.com
Forward-Looking and Cautionary Statements
This press release contains certain forward-looking statements as defined in the applicable securities laws. All statements, other than statements of historical facts, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”, “believes”, “hopes”, “intends”, “estimated”, “potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could” or “should” occur or be achieved. Forward-looking statements relate to future events or future performance and reflect TRX Gold management’s expectations or beliefs regarding future events and include, but are not limited to, statements with respect to continued operating cash flow, expansion of its process plant, estimation of mineral resources, ability to develop value creating activities, recoveries, subsequent project testing, success, scope and viability of mining operations, the timing and amount of estimated future production, and capital expenditure.
Although TRX Gold believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance. The actual achievements of TRX Gold or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors. These risks, uncertainties and factors include general business, legal, economic, competitive, political, regulatory and social uncertainties; actual results of exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in costs; future prices of gold and other minerals; mining method, production profile and mine plan; delays in exploration, development and construction activities; changes in government legislation and regulation; the ability to obtain financing on acceptable terms and in a timely manner or at all; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business. These risks are set forth in reports that TRX Gold files with the SEC and the various Canadian securities authorities. You can review and obtain copies of these filings from the SEC's website at http://www.sec.gov/edgar.shtml and the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR+”) at www.sedarplus.ca.
The disclosure contained in this press release of a scientific or technical nature relating to the Company’s Buckreef Project has been summarized or extracted from the technical report entitled “The National Instrument 43-101 Independent Technical Report, Updated Mineral Resource Estimate for the Buckreef Gold Mine Project, Tanzania, East Africa for TRX Gold” with an effective date (the “Effective Date”) of May 15, 2020 (the “2020 Technical Report”). The 2020 Technical Report was prepared by or under the supervision Mr. Wenceslaus Kutekwatekwa (Mining Engineer, Mining and Project Management Consultant) BSc Hons (Mining Eng.), MBA, FSAIMM, of Virimai Projects, and, Dr Frank Crundwell, MBA, PhD, a Consulting Engineer, each of whom is an independent Qualified Person as such term is defined in NI 43-101. The information contained herein is subject to all of the assumptions, qualifications and procedures set out in the 2020 Technical Report and reference should be made to the full details of the 2020 Technical Report which has been filed with the applicable regulatory authorities and is available on the Company’s profile at www.sedarplus.ca. The Company did not complete any new work that would warrant reporting material changes in the previously reported Mineral Resource (“MRE”) and Mineral Reserve statements during the prior reporting period. The Company has engaged two globally recognized and respected mining consulting groups to undertake a comprehensive review of the MRE, and economic analysis which was previously conducted under the 2003 CIM code. This in turn follows significant infill and exploration drilling, plus other required technical work undertaken over the prior 18 months. This work is currently being undertaken to be compliant with the November 2019 CIM Code for the Valuation of Mineral Properties, which are different with respect to the 2003 guidelines. There can be no assurance that there will not be a change in the MRE and Mineral Reserve as disclosed in the 2020 Technical Report after such work has been updated (in accordance with the 2019 CIM code).
The information contained in this press release is as of the date of the press release and TRX Gold assumes no duty to update such information.
The TSX and NYSE America have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this press release, which has been prepared by the management of TRX Gold.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/f30151aa-6656-4c19-a53a-892f72caca27
https://www.globenewswire.com/NewsRoom/AttachmentNg/382c94a9-005e-4113-a237-908e76ad03c5
FAQ
What are the latest drill results from TRX Gold's Stamford Bridge Zone?
How far has TRX Gold extended the Stamford Bridge Shear Zone?