TRX Gold Reports More High-Grade Intercepts at Stamford Bridge
TRX Gold (TRX) has announced significant drill results from its Stamford Bridge Shear Zone, revealing high-grade gold intercepts. Key findings include hole BMDD319 with 21 meters @ 8.63 g/t Au, BMDD320 with 20.50 meters @ 5.14 g/t Au, and BMDD321 with 5 meters @ 2.74 g/t Au.
The Stamford Bridge Zone, located approximately 250m east of the Buckreef Main Zone (which hosts a 2M+ ounce Au Mineral Resource), shows similar geological characteristics to the Main Zone. The new intercepts confirm a mineralized shear zone trending 070 degrees East Northeast, with potential to extend over 1 kilometer. Current reported intersections cover approximately 150m of strike length.
TRX Gold (TRX) ha annunciato risultati significativi dai suoi perforazioni nella Stamford Bridge Shear Zone, rivelando intercettazioni d'oro di alta qualità. I risultati chiave includono il pozzo BMDD319 con 21 metri @ 8.63 g/t Au, BMDD320 con 20.50 metri @ 5.14 g/t Au e BMDD321 con 5 metri @ 2.74 g/t Au.
La Stamford Bridge Zone, situata a circa 250m a est della Buckreef Main Zone (che ospita oltre 2 milioni di once di risorse minerarie d'oro), mostra caratteristiche geologiche simili a quelle della Main Zone. Le nuove intercettazioni confermano una zona di shear mineralizzata inclinata a 070 gradi Est-Nordest, con un potenziale di estensione di oltre 1 chilometro. Gli attuali rapporti di intercettazione coprono circa 150m di lunghezza di strike.
TRX Gold (TRX) ha anunciado resultados de perforación significativos de su zona de corte de Stamford Bridge, revelando interceptos de oro de alta calidad. Los hallazgos clave incluyen el pozo BMDD319 con 21 metros a 8.63 g/t Au, BMDD320 con 20.50 metros a 5.14 g/t Au y BMDD321 con 5 metros a 2.74 g/t Au.
La Zona Stamford Bridge, situada aproximadamente a 250 m al este de la Zona Principal de Buckreef (que alberga más de 2 millones de onzas de recurso mineral de Au), muestra características geológicas similares a la Zona Principal. Los nuevos interceptos confirman una zona de corte mineralizada que se extiende a 070 grados Este-Noreste, con potencial para extenderse más de 1 kilómetro. Las intersecciones reportadas actualmente cubren aproximadamente 150 m de longitud de strike.
TRX Gold (TRX)는 Stamford Bridge Shear Zone에서 중요한 드릴 결과를 발표하며 고등급 금 인터셉트를 공개했습니다. 주요 발견으로는 BMDD319 구멍에서 21미터 @ 8.63 g/t Au, BMDD320에서 20.50미터 @ 5.14 g/t Au, 그리고 BMDD321에서 5미터 @ 2.74 g/t Au가 있습니다.
Stamford Bridge Zone은 Buckreef Main Zone에서 동쪽으로 약 250m 떨어진 곳에 위치하고 있으며 (여기에는 200만 온스 이상의 금 미네랄 자원이 포함되어 있습니다), Main Zone과 유사한 지질적 특성을 보여줍니다. 새로운 인터셉트는 동북부 070도 방향으로 펼쳐진 광물화된 절리 대역을 확인하며, 1킬로미터 이상으로 확장될 잠재력이 있습니다. 현재 보고된 인터섹션은 약 150m의 스트라이크 길이를 포함합니다.
TRX Gold (TRX) a annoncé des résultats de forage significatifs de sa zone de cisaillement de Stamford Bridge, révélant des interceptions d'or de haute qualité. Les principales découvertes comprennent le trou BMDD319 avec 21 mètres à 8.63 g/t Au, BMDD320 avec 20.50 mètres à 5.14 g/t Au et BMDD321 avec 5 mètres à 2.74 g/t Au.
La Zone de Stamford Bridge, située à environ 250 m à l'est de la Zone Principale de Buckreef (qui abrite plus de 2 millions d'onces de ressources minérales d'or), présente des caractéristiques géologiques similaires à la Zone Principale. Les nouvelles interceptions confirment une zone de cisaillement minéralisée orientée à 070 degrés Est-Nord-Est, avec un potentiel de prolongement sur plus d'un kilomètre. Les intersections rapportées actuellement couvrent environ 150 m de longueur de strike.
TRX Gold (TRX) hat bedeutende Bohrergebnisse aus seiner Stamford Bridge Shear Zone bekannt gegeben, die hochgradige Goldinterzeptionen enthüllen. Zu den wichtigsten Ergebnissen gehören das Loch BMDD319 mit 21 Metern bei 8.63 g/t Au, BMDD320 mit 20.50 Metern bei 5.14 g/t Au und BMDD321 mit 5 Metern bei 2.74 g/t Au.
Die Stamford Bridge Zone, die sich etwa 250 m östlich der Buckreef Main Zone (die über 2 Millionen Unzen Goldmineralressourcen beherbergt) befindet, weist ähnliche geologische Merkmale wie die Main Zone auf. Die neuen Interzeptionen bestätigen eine mineralisierte Scherzone, die sich in Richtung 070 Grad Ostnordost erstreckt und das Potenzial hat, über 1 Kilometer hinaus zu reichen. Die derzeit gemeldeten Schnitte decken eine Streckenlänge von etwa 150 m ab.
- High-grade gold intercepts with significant widths (21m @ 8.63 g/t Au)
- Extension of mineralized zone by additional 25 meters
- Proximity to existing 2M+ ounce Au resource at Buckreef Main Zone
- 100% core recovery across all drill holes
- True width estimated at only 50-60% of reported intercept lengths
Insights
These drill results from Stamford Bridge represent a significant exploration success. The high-grade intercepts of 21m @ 8.63 g/t Au and 20.50m @ 5.14 g/t Au are particularly impressive, as they're well above the typical economic threshold for gold mining. The strike extension of 25 meters along with consistent mineralization suggests substantial resource expansion potential.
The geological similarity to the main Buckreef zone, which hosts a 2M+ ounce resource, indicates this could be a major parallel structure. The mineralized shear zone's 070-degree trend and kilometer-long potential is particularly promising for resource growth. In simple terms, imagine finding a second gold vein running parallel to your main one - that's exactly what's happening here.
The consistent 100% core recovery and robust QA/QC protocols add high confidence to these results. The true width estimates of 50-60% of intersection length are typical for this style of mineralization and still indicate excellent mining widths.
This discovery materially enhances TRX Gold's asset value and growth potential. With a current market cap of just
Most notably, these grades (particularly 8.63 g/t Au over 21m) are well above the global average gold grade of ~1.5 g/t, suggesting strong potential project economics. The location between existing deposits creates operational synergy opportunities that could enhance the overall project's net present value. Think of it as finding a new high-grade wing of a profitable mine - it could be developed relatively quickly using existing infrastructure and expertise.
Zone extended another 25 meters
TORONTO, Jan. 14, 2025 (GLOBE NEWSWIRE) -- TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) (the “Company” or “TRX Gold”) is excited to announce, once again, another excellent set of drill results, with hole BMDD319 intersecting 21 metres (“m”) @ 8.63 g/t Au from 81 m; BMDD320 intersecting 20.50 metres (“m”) @ 5.14 g/t Au from 125.5 m and BMDD321 intersecting 5 metres (“m”) @ 2.74 g/t Au from 157 m. These drill hole results are downdip extensions at the newly discovered and highly prospective Stamford Bridge Shear Zone (see Figure 1). They are located approximately 250 m east of the Buckreef Main Zone—host to Buckreef Gold’s 2M+ ounce Au Mineral Resource1 and where current operations are ongoing in the Main Pit.
These drill hole results come following the Company’s previous drill results, dated October 24 and November 12, 2024, whereby the Company announced the discovery of a promising new gold mineralization shear zone, named the Stamford Bridge Zone, at which results are revealing geological characteristics and mineral alterations similar to that at Buckreef’s Main Zone.
Significance of this latest drill intercept:
Significant intercept from Hole BMDD319 confirms downdip extension intercepted previously by BMDD310 and is 15 m further downdip (see Figure 2). Similarly, significant intercept from BMDD320 confirms up-dip extension of previously intercepted zone by BMDD315;
BMDD321 intercepted the mineralised shear zone further to the northeast 25 m along strike;
These intercepts continue to confirm a “bridge” or an interpreted mineralized shear zone trending 070 degrees East Northeast, that is showing potential to extend over 1 kilometer. To date, intersections reported over the last few months cover approximately 150 m of strike length (see Figure 1); and
The Stamford Bridge Zone is a potentially significant shear zone and geologically similar to the Buckreef Main Zone. It is situated between the Buckreef Main Zone and the Eastern Porphyry deposit and Anfield Zone, to the Southeast (see Figure 1).
Stephen Mullowney, TRX Gold CEO continues, “The Stamford Bridge Shear Zone keeps delivering! This initial exploration work is paying off thus far and we are eager to launch the ground geophysical survey over the next few weeks, which is expected to support some very targeted drilling.”
Figure 1. Location of latest drill holes among previous results at the Stamford Bridge Zone
Figure 2. Cross-sections 50 metres apart; results from new drill holes BMDD319 and BMDD320 - Stamford Bridge Zone
Table 1: Summary of Results – Stamford Bridge
Hole ID | Hole Type | Drill Holes Location | Sample Depth | Width (m) | Assay Grade (gpt) | Lithology | Comment | |||||
Easting (m) | Northing (m) | RL (m) | Azimuth | Dip | From (m) | To (m) | ||||||
BMGT001 | DD | 391,780 | 9,658,453 | 1,218 | 270 | -50 | 105.0 | 115.4 | 10.4 | 3.03 | Msh | Stamford Bridge Mineralised shear zone with strong alteration |
186.6 | 208.0 | 21.4 | 2.42 | Msh | ||||||||
393.0 | 425.8 | 32.8 | 1.70 | Msh | Buckreef main shearzone | |||||||
BMDD309 | DD | 391,676 | 9,658,400 | 1,217 | 334 | -60 | 101.8 | 104.5 | 2.7 | 1.65 | Msh | |
BMDD310 | DD | 391,723 | 9,658,418 | 1,217 | 334 | -60 | 64.5 | 100.0 | 35.5 | 5.48 | Msh | Mineralised shear zone with strong alteration |
BMDD312 | DD | 391,685 | 9,658,382 | 1,216 | 335 | -60 | 164.6 | 180.8 | 16.2 | 3.14 | Msh | Mineralised shear zone with strong alteration |
BMDD315 | DD | 391,770 | 9,658,435 | 1,217 | 335 | -60 | 130.0 | 166.0 | 36.0 | 7.04 | Msh | Mineralised shear zone with strong alteration |
BMDD319 | DD | 391,729 | 9,658,404 | 1,217 | 335 | -60 | 76.0 | 79.0 | 3.0 | 1.21 | Msh | Mineralised shear zone with strong alteration |
BMDD319 | DD | 391,729 | 9,658,404 | 1,217 | 335 | -60 | 81.0 | 102.0 | 21.0 | 8.63 | Msh | Mineralised shear zone with strong alteration |
BMDD320 | DD | 391,765 | 9,658,447 | 1,218 | 335 | -60 | 125.5 | 146.0 | 20.5 | 5.14 | Msh | Mineralised shear zone with strong alteration |
BMDD321 | DD | 391,790 | 9,658,441 | 1,218 | 335 | -60 | 157.0 | 162.0 | 5.0 | 2.74 | Msh | Mineralised shear zone with strong alteration |
The sample chain of custody is managed by the Buckreef geology team on site. Reported results are from diamond drilled core samples. Intervals of core to be analyzed are split into half using a mechanized core cutter, with one half sent to the Laboratory for geochemical analysis and the remaining half kept in storage for future reference and uses. Diamond drilled core has been a HQ size and recoveries are consistently | ||||||||||||
Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control program. The QAQC program involves insertion of duplicate samples, blanks and certified reference materials in the sample stream. Gold analyses are performed by standard fire assaying protocols using a 50-gram charge with atomic absorption (AAS) finish and a gravimetric finish performed for assays greater than 10 grams per ton. | ||||||||||||
Sample Preparation and analysis are performed by independent SGS Laboratory in Mwanza, Tanzania. SGS Laboratory is ISO17025 accredited and employs a Laboratory Information Management System for sample tracking, quality control and reporting. | ||||||||||||
The results summarized in this release are from Stamford Bridge target. The intercepts confirm an interpreted mineralized shear zone trending 070 degrees East Northeast that is over a km long. The intersections reported here has covered only the first 150m strike length, they are down-hole lengths and may not represent true width, however the true width is estimated to be between | ||||||||||||
Qualified Person
Mr. William van Breugel, P.Eng, BASc (Hons), technical Advisor to TRX Gold Corporation, is the Company’s Qualified Person under National Instrument 43-101 “Standards of Disclosure for Mineral Projects” (“NI 43-101”) and has reviewed and assumes responsibility for the scientific and technical content in this press release.
Sample Protocol QA/QC
The sample chain of custody is managed by the Buckreef geology team on site. Reported results are from diamond drilled core samples. Intervals of core to be analyzed are split into half using a mechanized core cutter, with one half sent to the Laboratory for geochemical analysis and the remaining half kept in storage for future reference and uses. Diamond drilled core has been a HQ size and recoveries are consistently
Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control program. The QAQC program involves insertion of duplicate samples, blanks and certified reference materials in the sample stream. Gold analyses are performed by standard fire assaying protocols using a 50-gram charge with atomic absorption (AAS) finish and a gravimetric finish performed for assays greater than 10 grams per tonne.
Sample Preparation and analysis are performed by independent SGS Laboratory in Mwanza, Tanzania. SGS Laboratory is ISO17025 accredited and employs a Laboratory Information Management System for sample tracking, quality control and reporting.
The results summarized in this release are from Stamford Bridge target. The intercepts confirm an interpreted shear zone trending 070 degrees East Northeast that is over a km long. The intersections reported here has covered only the first 150m strike length, they are down-hole lengths and may not represent true width, however the true width is estimated to be between
About TRX Gold Corporation
TRX Gold is rapidly advancing the Buckreef Gold Project. Anchored by a Mineral Resource published in May 2020, the project currently hosts a Measured and Indicated Mineral Resource of 35.88 MT at 1.77 g/t gold containing 2,036,280 oz of gold and an Inferred Mineral Resource of 17.8 MT at 1.11g/t gold for 635,540 oz of gold. The leadership team is focused on creating both near-term and long-term shareholder value by increasing gold production to generate positive cash flow. The positive cash flow will be utilized for exploratory drilling with the goal of increasing the current gold Resource base and advancing the Sulphide Ore Project which represents
For investor or shareholder inquiries, please contact:
Investor Relations
Christina Lalli
Vice President, Investor Relations
TRX Gold Corporation
+1-438-399-8665
c.lalli@TRXgold.com
www.TRXgold.com
Forward-Looking and Cautionary Statements
This press release contains certain forward-looking statements as defined in the applicable securities laws. All statements, other than statements of historical facts, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”, “believes”, “hopes”, “intends”, “estimated”, “potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could” or “should” occur or be achieved. Forward-looking statements relate to future events or future performance and reflect TRX Gold management’s expectations or beliefs regarding future events and include, but are not limited to, statements with respect to continued operating cash flow, expansion of its process plant, estimation of mineral resources, ability to develop value creating activities, recoveries, subsequent project testing, success, scope and viability of mining operations, the timing and amount of estimated future production, and capital expenditure.
Although TRX Gold believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance. The actual achievements of TRX Gold or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors. These risks, uncertainties and factors include general business, legal, economic, competitive, political, regulatory and social uncertainties; actual results of exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in costs; future prices of gold and other minerals; mining method, production profile and mine plan; delays in exploration, development and construction activities; changes in government legislation and regulation; the ability to obtain financing on acceptable terms and in a timely manner or at all; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business. These risks are set forth in reports that TRX Gold files with the SEC and the various Canadian securities authorities. You can review and obtain copies of these filings from the SEC's website at http://www.sec.gov/edgar.shtml and the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR+”) at www.sedarplus.ca.
The disclosure contained in this press release of a scientific or technical nature relating to the Company’s Buckreef Project has been summarized or extracted from the technical report entitled “The National Instrument 43-101 Independent Technical Report, Updated Mineral Resource Estimate for the Buckreef Gold Mine Project, Tanzania, East Africa for TRX Gold” with an effective date (the “Effective Date”) of May 15, 2020 (the “2020 Technical Report”). The 2020 Technical Report was prepared by or under the supervision Mr. Wenceslaus Kutekwatekwa (Mining Engineer, Mining and Project Management Consultant) BSc Hons (Mining Eng.), MBA, FSAIMM, of Virimai Projects, and, Dr Frank Crundwell, MBA, PhD, a Consulting Engineer, each of whom is an independent Qualified Person as such term is defined in NI 43-101. The information contained herein is subject to all of the assumptions, qualifications and procedures set out in the 2020 Technical Report and reference should be made to the full details of the 2020 Technical Report which has been filed with the applicable regulatory authorities and is available on the Company’s profile at www.sedarplus.ca. The Company did not complete any new work that would warrant reporting material changes in the previously reported Mineral Resource (“MRE”) and Mineral Reserve statements during the prior reporting period. The 2020 Technical Report follows the CIM Definition Standards on Mineral Resources and Mineral Reserves (“CIM Definition Standards”) and the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (“CIM Guidelines”).
The information contained in this press release is as of the date of the press release and TRX Gold assumes no duty to update such information.
The TSX and NYSE America have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this press release, which has been prepared by the management of TRX Gold.
______________________
1 See Forward-Looking and Cautionary Statements
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/2e079f9c-b201-45a5-9303-1f59fac31c59
https://www.globenewswire.com/NewsRoom/AttachmentNg/b58b0eb8-46b5-4a1e-889d-453a219998ee
FAQ
What are the latest gold intercept results from TRX's Stamford Bridge Zone?
How far is TRX's Stamford Bridge Zone from the Buckreef Main Zone?
What is the potential strike length of TRX's Stamford Bridge mineralized zone?