Silver Storm Announces La Estrella Zone Drill Results
Silver Storm Mining announces positive drill results from its Phase 1 program at La Parrilla Silver Mine Complex in Mexico. Key highlights include high-grade mineralization in the La Estrella and San Rafael Zones. Results suggest potential future resource updates and mineralized zones expansion.
Positive drill results from La Estrella and San Rafael Zones imply high-grade mineralization potential.
Results may impact future resource updates positively and confirm mineralized potential within the area.
La Estrella Zone shows significant high-grade mineralization over a wide strike length, vertical extent, and true thickness.
- None.
Figure 1: Cross Section View of Quebradillas Mine Toward NNW (Graphic: Business Wire)
An overview video on the La Parrilla Project is available at www.youtube.com/watch?v=dybgKXcGrYo
Key highlights include:
-
Hole Q-23-030 intersected the La Estrella Zone returning 455 g/t Ag.Eq1 over 4.13 metres (“m”) including 1,617 g/t Ag.Eq over 0.60 m
- Located approximately 87 m above the last mine development in this area, with similar high-grade mineralization. 1967 EL stope composted historical channel samples graded 584 g/t Ag.Eq over a strike length of 71 m and average width of 1.89 m.
-
Hole Q-23-029A intersected the La Estrella Zone returning 321 g/t Ag.Eq over 7.50 m including 463 g/t Ag.Eq over 1.12 m and 708 g/t Ag.Eq over 1.38 m.
- Located approximately 22 m above the previously developed 1967 EL stope.
- Hole Q-23-027 intersected the San Rafael Zone returning 708 g/t Ag.Eq over 2.36 m, including 1,673 g/t Ag.Eq over 0.57 m.
- Hole Q-23-028 intersected the San Rafael Zone returning 540 g/t Ag.Eq over 1.21 m.
Greg McKenzie, President and CEO, commented: “We are pleased with the strong returns from the La Estrella,
These three zones possibly merge to the west, and further follow-up drilling will be performed in 2024 to confirm the mineralized potential within this area.”
La Estrella Zone
The La Estrella Zone (“VES”) is a sulphide-bearing hydrothermal breccia within a fault striking 274 degrees and dipping 80 degrees to the south over an approximate strike length of 225 m. Prior to placing the mine on care and maintenance (September 2019) First Majestic successfully mined one level in VES Zone with excellent results – the composited weighted average grade of historical channel samples within the 1967 EL Stope (Table 2) returned 584 g/t Ag.Eq over a strike length of 71 m and average width of 1.89 m.
Results from holes Q-23-029A and Q-23-030, when combined with historical holes in proximity (Figure 1, 2, 3 & Table 1), have identified a high-grade mineralized zone over a vertical extent of 135 m, strike length of 225 m, and true width varying up to 6 m.
Hole Q-23-029A
Hole Q-23-029A was drilled to target the VES Zone, successfully intersecting sulphide breccia mineralization returning 321 g/t Ag.Eq over 7.50 m (57.80 to 65.30 m) including 463 g/t Ag.Eq over 1.12 m and 708 g/t Ag.Eq over 1.38 m – See Table 1; Figures 2 & 3. This intercept was drilled 22 m above the previously developed 1967 EL stope.
Hole Q-23-029A also intersected the VES-A Zone, returning 376 g/t Ag.Eq over 3.93 m (46.12 to 50.05 m) including 811 g/t Ag.Eq over 1.01 m (49.04 to 50.05 m).
Hole Q-23-030
Hole Q-23-030 was drilled to target VES Zone, successfully intersecting sulphide breccia mineralization, returning 455 g/t Ag.Eq over 4.13 m (103.61 to 107.74 m) including 1,617 g/t Ag.Eq over 0.60 m (103.61 to 104.21 m). This intercept was drilled 87 m above the previously developed 1967 EL stope.
C1940 and San Rafael Zones
C1940 Zone (C1940) is a sulphide-bearing quartz-carbonate vein zone striking 335 degrees and dipping 73 degrees to the east-northeast with a known strike length of approximately 45 m. The zone is mineralized over a vertical extent of 75 m and its true width varies up to 5 m.
San Rafael Zone (VSR) is a sulphide-bearing tectonic breccia zone striking 299 degrees and dipping 68 degrees to the north-northeast with a known strike length of approximately 120 m. The zone is mineralized over a known vertical extent of 80 m and its true width varies up to 3.5 m.
Hole Q-23-027
Hole Q-23-027 was drilled to target the VSR and C1940 Zones, successfully intersecting VSR Zone stockwork and breccia mineralization, returning 708 g/t Ag.Eq over 2.36 m (0.49 to 2.85 m), including 1,673 g/t Ag.Eq over 0.57 m (1.26 to 1.83 m).
This intercept is located approximately 17 m along strike to the southwest of the last mine development in this area, with similar high-grade mineralization:
- The composited weighted average grade of historical channel samples from the 1945 EL stope returned 930 g/t Ag.Eq over a strike length of 11 m and average width of 2.28 m.
Hole Q-23-027 also intersected C1940 Zone quartz-carbonate vein mineralization, returning 689 g/t Ag.Eq over 0.70 m (61.43 to 62.13 m).
This intercept is located approximately 17 m above the last mine development in this area, with similar high-grade mineralization:
- The composited weighted average grade of historical channel samples from the 1940 EL stope returned 689 g/t Ag.Eq over a strike length of 21 m and average width of 2.60 m.
Hole Q-23-028
Hole Q-23-028 successfully intersected VSR Zone breccia mineralization, returning 540 g/t Ag.Eq over 1.21 m (0 to 1.21 m).
Table 1 – Select Assay Intervals from Holes Q-23-027 to Q-23-030 and Historical Results
Zone |
Hole |
From |
To |
Length
|
Ag.Eq(1)
|
Ag
|
Au
|
Pb
|
Zn
|
Cu
|
VSR |
Q_23_027 |
0.49 |
2.85 |
2.36 |
708 |
619 |
0.19 |
1.27 |
1.46 |
0.03 |
|
including |
1.26 |
1.83 |
0.57 |
1,673 |
1,555 |
0.24 |
1.65 |
2.00 |
0.09 |
NEW |
Q_23_027 |
42.00 |
42.90 |
0.90 |
195 |
156 |
0.07 |
0.61 |
0.63 |
0.01 |
C1940 |
Q_23_027 |
61.43 |
62.13 |
0.70 |
689 |
548 |
0.14 |
3.07 |
1.73 |
0.04 |
|
|
|
|
|
|
|
|
|
|
|
VSR |
Q_23_028 |
0.00 |
1.21 |
1.21 |
540 |
466 |
0.14 |
1.58 |
0.74 |
0.02 |
|
|
|
|
|
|
|
|
|
|
|
VES_A |
Q_23_029A |
46.12 |
50.05 |
3.93 |
376 |
326 |
0.04 |
1.45 |
0.27 |
0.02 |
|
including |
49.04 |
50.05 |
1.01 |
811 |
673 |
0.10 |
4.29 |
0.55 |
0.02 |
VES |
Q_23_029A |
57.80 |
65.30 |
7.50 |
321 |
284 |
0.04 |
0.89 |
0.36 |
0.02 |
|
including |
57.80 |
58.92 |
1.12 |
463 |
390 |
0.06 |
1.97 |
0.57 |
0.02 |
|
and |
63.00 |
64.38 |
1.38 |
708 |
611 |
0.03 |
2.64 |
0.88 |
0.02 |
NEW |
Q_23_029A |
76.04 |
76.70 |
0.66 |
170 |
136 |
0.02 |
0.30 |
0.93 |
0.01 |
VSR |
Q_23_029A |
108.00 |
109.50 |
1.50 |
143 |
141 |
0.01 |
0.02 |
0.05 |
0.03 |
|
|
|
|
|
|
|
|
|
|
|
VES_A |
Q_23_030 |
91.99 |
92.57 |
0.58 |
260 |
213 |
0.05 |
0.85 |
0.76 |
0.01 |
VES |
Q_23_030 |
103.61 |
107.74 |
4.13 |
455 |
376 |
0.04 |
1.35 |
1.44 |
0.01 |
|
including |
103.61 |
104.21 |
0.60 |
1,617 |
1,270 |
0.14 |
4.98 |
7.44 |
0.05 |
|
|
|
|
|
|
|
|
|
|
|
C1940 |
ILP-Q-16-04 |
68.00 |
69.00 |
1.00 |
598 |
262 |
0.07 |
7.59 |
4.63 |
0.03 |
C1940 |
74.30 |
88.30 |
14.00 |
591 |
340 |
0.23 |
5.46 |
3.15 |
0.06 |
|
C1940 |
ILP-Q-16-05 |
67.55 |
70.10 |
2.55 |
174 |
103 |
0.04 |
2.23 |
0.25 |
0.03 |
C1940 |
76.40 |
79.15 |
2.75 |
173 |
112 |
0.12 |
1.84 |
0.04 |
0.03 |
|
VSR |
ILP-Q-16-09 |
197.20 |
199.05 |
1.85 |
147 |
119 |
0.01 |
0.43 |
0.60 |
0.01 |
VES-VSR |
ILP-Q-17-21 |
91.05 |
96.10 |
5.05 |
1,761 |
1,277 |
0.44 |
6.45 |
10.10 |
0.10 |
VES-VSR |
ILP-Q-17-23-A |
67.65 |
74.40 |
6.75 |
246 |
211 |
0.09 |
0.42 |
0.59 |
0.03 |
C1940 |
ILP-Q-17-27 |
67.30 |
70.95 |
3.65 |
250 |
187 |
0.03 |
1.12 |
1.14 |
0.02 |
VSR |
ILP-Q-18-08 |
195.80 |
197.30 |
1.50 |
244 |
195 |
0.05 |
0.41 |
1.29 |
0.02 |
C1940 |
ILP-Q-18-70 |
130.95 |
132.15 |
1.20 |
438 |
377 |
0.11 |
1.20 |
0.74 |
0.10 |
VES |
ILP-Q-18-72 |
209.00 |
213.85 |
4.85 |
167 |
143 |
0.03 |
0.37 |
0.43 |
- |
VES-A |
ILP-Q-19-07 |
64.15 |
72.90 |
8.75 |
228 |
170 |
0.03 |
1.35 |
0.72 |
0.01 |
VES |
82.20 |
84.20 |
2.00 |
493 |
410 |
0.08 |
1.58 |
1.23 |
0.01 |
|
VES |
ILP-Q-19-09 |
46.75 |
47.45 |
0.70 |
225 |
193 |
0.09 |
0.08 |
0.82 |
0.03 |
NEW |
68.75 |
69.25 |
0.50 |
172 |
141 |
0.03 |
0.69 |
0.38 |
0.01 |
|
NEW |
71.45 |
72.00 |
0.55 |
863 |
783 |
0.16 |
1.90 |
0.57 |
0.03 |
|
VSR |
105.30 |
107.55 |
2.25 |
322 |
285 |
0.04 |
1.16 |
0.08 |
0.02 |
|
VES |
ILP-Q-19-19 |
82.00 |
94.75 |
12.75 |
184 |
141 |
0.06 |
0.43 |
0.96 |
0.01 |
VES |
ILP-Q-19-21 |
59.85 |
61.85 |
2.00 |
2,936 |
2,861 |
0.03 |
1.99 |
0.74 |
0.02 |
VES |
76.25 |
77.05 |
0.80 |
211 |
154 |
0.04 |
0.57 |
1.40 |
- |
|
VES-VSR |
SLP-Q-12-06 |
130.65 |
131.35 |
0.70 |
378 |
377 |
- |
0.01 |
0.02 |
- |
VSR |
SLP-Q-12-09 |
164.05 |
165.95 |
1.90 |
157 |
137 |
- |
0.24 |
0.50 |
0.01 |
VES |
SLP-V-13-01 |
202.60 |
215.30 |
12.70 |
168 |
140 |
0.04 |
0.42 |
0.50 |
0.01 |
Table 2 – Historical Channel Sample Results (2) – C1940, Veta San Rafael and Veta La Estrella
Elevation |
Zone |
Channel |
Width |
Ag.Eq(1)
|
Ag
|
Pb
|
Zn
|
1940 |
C1940 |
VVI-1940-L4S |
0.50 |
806 |
805 |
0.02 |
0.02 |
1940 |
C1940 |
VVI-1940-L3S |
1.70 |
479 |
355 |
1.92 |
2.66 |
1940 |
C1940 |
VVI-1940-L2S |
1.00 |
340 |
303 |
0.64 |
0.73 |
1940 |
C1940 |
VVI-1940-L1S |
1.20 |
609 |
517 |
1.49 |
1.89 |
1940 |
C1940 |
VVI-1940-L1 |
3.50 |
1,363 |
1,179 |
3.64 |
3.17 |
1940 |
C1940 |
VVI-1940-L-1+2 |
4.00 |
755 |
664 |
1.59 |
1.81 |
1940 |
C1940 |
VVI-1940-L-2N |
2.40 |
697 |
629 |
1.44 |
1.08 |
1940 |
C1940 |
VVI-1940-L2+2N |
1.60 |
328 |
264 |
1.25 |
1.14 |
1940 |
C1940 |
VVI-1940-L4N |
2.40 |
474 |
298 |
4.36 |
2.16 |
1940 |
C1940 |
VVI-1940-TD |
5.20 |
731 |
576 |
4.87 |
0.89 |
1940 |
C1940 |
VVI-1940-TDN |
5.10 |
1,002 |
880 |
3.03 |
1.51 |
|
|
|
|
|
|
|
|
1945 |
VSR |
VSR-1945-0 |
1.30 |
126 |
110 |
0.23 |
0.37 |
1945 |
VSR |
VSR-1945-3 |
1.50 |
262 |
203 |
0.88 |
1.29 |
1945 |
VSR |
VSR-1945-4 |
1.40 |
1,643 |
1,580 |
2.06 |
0.29 |
1945 |
VSR |
VSR-1945-5 |
4.90 |
1,690 |
1,411 |
5.77 |
4.55 |
|
|
|
|
|
|
|
|
1958 |
VSR |
VQ-1958-24 |
3.05 |
365 |
309 |
1.66 |
0.39 |
1958 |
VSR |
VQ-1958-21 |
0.40 |
202 |
139 |
1.52 |
0.82 |
1958 |
VSR |
VQ-1958-18 |
1.60 |
173 |
132 |
0.85 |
0.63 |
1958 |
VSR |
VQ-1958-15 |
0.40 |
3 |
3 |
0.00 |
0.00 |
1958 |
VSR |
VQ-1958-12 |
0.90 |
404 |
339 |
1.06 |
1.33 |
1958 |
VSR |
VQ-1958-9 |
1.80 |
646 |
549 |
1.86 |
1.73 |
1958 |
VSR |
VQ-1958-6 |
1.15 |
156 |
86 |
1.52 |
1.09 |
1958 |
VSR |
VQ-1958-3 |
3.40 |
129 |
111 |
0.45 |
0.21 |
1958 |
VSR |
VQ-1958-00 |
2.20 |
200 |
181 |
0.51 |
0.18 |
1958 |
VSR |
VQ-1958-01 |
0.50 |
352 |
315 |
0.60 |
0.76 |
1958 |
VSR |
VQ-1958-02 |
0.40 |
148 |
137 |
0.27 |
0.15 |
1958 |
VSR |
VQ-1958-05 |
0.80 |
299 |
280 |
0.56 |
0.13 |
1958 |
VSR |
VQ-1958-08 |
1.00 |
295 |
271 |
0.68 |
0.22 |
|
|
|
|
|
|
|
|
1956 |
VES |
VQ-1956-6 |
0.50 |
285 |
219 |
1.02 |
1.44 |
1956 |
VES |
VQ-1956-9 |
1.50 |
542 |
480 |
1.70 |
0.58 |
1956 |
VES |
VQ-1956-12 |
0.70 |
100 |
79 |
0.57 |
0.20 |
1956 |
VES |
VQ-1956-22 |
3.00 |
438 |
290 |
2.30 |
3.20 |
1956 |
VES |
VQ-1956-25 |
1.40 |
1,065 |
858 |
4.59 |
3.05 |
1956 |
VES |
VQ-1956-26 |
0.25 |
233 |
182 |
0.88 |
1.02 |
1956 |
VES |
VQ-1956-29 |
1.90 |
214 |
171 |
0.58 |
1.01 |
1956 |
VES |
VQ-1956-32 |
1.70 |
67 |
57 |
0.17 |
0.21 |
1956 |
VES |
VQ-1956-35 |
1.50 |
302 |
257 |
0.88 |
0.76 |
1956 |
VES |
VQ-1956-38 |
3.25 |
421 |
375 |
0.82 |
0.85 |
|
|
|
|
|
|
|
|
1967 |
VES |
VES-1967-17 |
3.40 |
722 |
582 |
1.69 |
3.45 |
1967 |
VES |
VES-1967-16 |
3.00 |
279 |
221 |
0.89 |
1.23 |
1967 |
VES |
VES-1967-15 |
2.30 |
193 |
151 |
0.65 |
0.90 |
1967 |
VES |
VES-1967-14 |
0.50 |
20 |
15 |
0.05 |
0.12 |
1967 |
VES |
VES-1967-13 |
0.40 |
1,554 |
1,477 |
1.30 |
1.53 |
1967 |
VES |
VES-1967-12 |
0.70 |
409 |
361 |
0.62 |
1.16 |
1967 |
VES |
VES-1967-11 |
1.30 |
614 |
538 |
0.86 |
1.93 |
1967 |
VES |
VES-1967-10 |
0.40 |
218 |
185 |
0.24 |
0.96 |
1967 |
VES |
VES-1967-9 |
1.15 |
309 |
256 |
0.60 |
1.32 |
1967 |
VES |
VES-1967-8 |
0.50 |
222 |
210 |
0.34 |
0.10 |
1967 |
VES |
VES-1967-7 |
2.65 |
297 |
265 |
0.63 |
0.56 |
1967 |
VES |
VES-1967-6 |
1.90 |
172 |
163 |
0.24 |
0.10 |
1967 |
VES |
VES-1967-5 |
3.00 |
171 |
147 |
0.57 |
0.34 |
1967 |
VES |
VES-1967-4 |
3.20 |
254 |
141 |
0.96 |
3.18 |
1967 |
VES |
VES-1967-3 |
1.10 |
306 |
257 |
0.78 |
1.05 |
1967 |
VES |
VES-1967-2 |
0.50 |
123 |
96 |
0.32 |
0.68 |
1967 |
VES |
VES-1967-1 |
5.90 |
186 |
146 |
0.57 |
0.91 |
1967 |
VES |
VES-1967-02 |
2.90 |
111 |
98 |
0.24 |
0.21 |
1967 |
VES |
VES-1967-03 |
2.30 |
46 |
41 |
0.07 |
0.09 |
1967 |
VES |
VES-1967-04 |
0.60 |
1,056 |
707 |
4.91 |
7.99 |
1967 |
VES |
VES-1967-05 |
3.70 |
2,577 |
2,368 |
4.76 |
2.97 |
1967 |
VES |
VES-1967-06 |
3.40 |
407 |
342 |
1.37 |
1.02 |
1967 |
VES |
VES-1967-07 |
1.40 |
457 |
343 |
1.25 |
2.93 |
1967 |
VES |
VES-1967-08 |
0.70 |
2,964 |
2,766 |
2.62 |
4.68 |
1967 |
VES |
VES-1967-09 |
0.35 |
944 |
886 |
0.70 |
1.45 |
|
|
|
|
|
|
|
|
2055 |
VES |
V550-2055-265 |
2.00 |
859 |
859 |
- |
- |
2055 |
VES |
V550-2055-267 |
0.80 |
182 |
182 |
- |
- |
2055 |
VES |
V550-2055-270 |
1.70 |
1,151 |
1,151 |
- |
- |
2055 |
VES |
V550-2055-273 |
2.40 |
297 |
297 |
- |
- |
2055 |
VES |
V550-2055-276 |
1.00 |
202 |
202 |
- |
- |
2055 |
VES |
V550-2055-278 |
0.70 |
294 |
294 |
- |
- |
2055 |
VES |
V550-2055-280 |
0.90 |
638 |
638 |
- |
- |
-
All results in this release are rounded. Assays are uncut and undiluted. Widths are core-lengths, not true widths. Silver equivalent: Ag.Eq g/t was calculated using commodity prices of
US /oz Ag,$22.50 US /oz Au,$1,800 US /lb Pb, and$0.94 US /lb Zn applying metallurgical recoveries of$1.35 70.1% for silver and82.8% for gold in oxides and79.6% for silver,80.1% for gold,74.7% for lead and58.8% for zinc in sulphides. Metal payable used was99.6% for silver and95% for gold in doré produced from oxides, and95% for silver, gold, and lead and85% for zinc in concentrates produced from sulphides. Cut-off grades considered for oxide and sulphide were, respectively 140 g/t Ag.Eq and 125 g/t Ag.Eq and are based on 2017 costs adjusted by the inflation rate and include sustaining costs. - Weighted average grades were calculated over the mineralized widths of each channel (Figures 2 & 3).
Sample Analysis and QA/QC Program
Silver Storm uses a quality assurance/quality control (QA/QC) program that monitors the chain of custody of samples and includes the insertion of blanks, duplicates, and reference standards in each batch of samples sent for analysis. The drill core is photographed, logged, and cut in half, with one half retained in a secured location for verification purposes and one half shipped for analysis. Sample preparation (crushing and pulverizing) is performed at ALS Geochemistry, an independent ISO 9001:2001 certified laboratory, in
Review by Qualified Person and QA/QC
The scientific and technical information in this document has been reviewed and approved by Bruce Robbins, P.Geo., a Qualified Person as defined by National Instrument 43-101.
About Silver Storm Mining Ltd. (formerly Golden Tag Resources Ltd.)
Silver Storm Mining Ltd. holds advanced-stage silver projects located in
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.
Cautionary Note Regarding Forward Looking Statements:
Certain statements in this news release are forward-looking and involve a number of risks and uncertainties. Such forward-looking statements are within the meaning of the phrase ‘forward-looking information’ in the Canadian Securities Administrators’ National Instrument 51-102 – Continuous Disclosure Obligations. Forward-looking statements are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management and Qualified Persons (in the case of technical and scientific information) expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan”. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the future exploration performance at La Parrilla, the timing and extent of current and future drill programs, the ability to increase Mineral Resources therein, and the ability to eventually place the La Parrilla Complex back into production.
In making the forward-looking statements included in this news release, the Company and Qualified Persons (in the case of technical and scientific information) have applied several material assumptions, including that the Company´s financial condition and development plans do not change because of unforeseen events, that future metal prices and the demand and market outlook for metals will remain stable or improve, management’s ability to execute its business strategy and no unexpected or adverse regulatory changes with respect to La Parrilla. Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of the Company to control or predict, that may cause the Company’s actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein, including, but not limited to, there being no assurance that the Company’s current and future exploration programs will grow the Mineral Resource base or upgrade Mineral Resource confidence, the risk that the assumptions referred to above prove not to be valid or reliable, the risk that the Company is unable to achieve its goal of placing La Parrilla back into production; market conditions and volatility and global economic conditions including increased volatility and potentially negative capital raising conditions resulting from the continued or escalation of the COVID-19 pandemic, risk of delay and/or cessation in planned work or changes in the Company’s financial condition and development plans; risks associated with the interpretation of data (including in respect of third party mineralized material) regarding the geology, grade and continuity of mineral deposits, the uncertainty of the geology, grade and continuity of mineral deposits and the risk of unexpected variations in Mineral Resources, grade and/or recovery rates; risks related to gold, silver and other commodity price fluctuations; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour, the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses and permits and the presence of laws and regulations that may impose restrictions on mining, including the Mexican mining reforms; risks relating to environmental regulation and liability; the possibility that results will not be consistent with the Company’s expectations.
Such forward-looking information represents managements and Qualified Persons (in the case of technical and scientific information) best judgment based on information currently available. No forward-looking statement can be guaranteed, and actual future results may vary materially. Accordingly, readers are advised not to place undue reliance on forward-looking statements or information.
View source version on businesswire.com: https://www.businesswire.com/news/home/20240507765356/en/
For additional information:
Greg McKenzie, President & CEO
Ph: +1 (416) 504-2024
greg.mckenzie@silverstorm.ca
Source: Silver Storm Mining Ltd.
FAQ
What are the key highlights of Silver Storm's drill results?
Where is the La Parrilla Silver Mine Complex located?
Which zones were featured in the drill results?
Who commented on the drill results?