Soluna Holdings, Inc. (NASDAQ: SLNH) has released its September business update, highlighting progress across various projects. Key developments include:

1. Signing a term sheet for Project Rosa, adding 187 MW of sustainable energy capacity.

2. Project Dorothy 1A and 1B (50 MW total) completed optimization efforts and successfully participated in ancillary services.

3. Project Dorothy 2 (48 MW) is progressing with site grading and concrete pouring.

4. New Project Grace (2 MW) and Project Ada (1 MW) are advancing in AI cloud and hosting services.

5. Project Sophie (25 MW) is preparing for a fleet upgrade and expansion.

6. Project Kati (166 MW) continues negotiations for land leases.

The company also published new blogs on AI's energy consumption and the convergence of AI with renewable energy.

Soluna Holdings, Inc. (NASDAQ: SLNH) ha pubblicato l'aggiornamento aziendale di settembre, evidenziando i progressi in vari progetti. Gli sviluppi chiave includono:

1. La firma di un accordo preliminare per il Progetto Rosa, che aggiunge 187 MW di capacità energetica sostenibile.

2. I progetti Dorothy 1A e 1B (50 MW totali) hanno completato gli sforzi di ottimizzazione e hanno partecipato con successo ai servizi ausiliari.

3. Il Progetto Dorothy 2 (48 MW) è in fase di avanzamento con la preparazione del sito e la gettata di calcestruzzo.

4. Il nuovo Progetto Grace (2 MW) e il Progetto Ada (1 MW) stanno progredendo nei servizi di cloud AI e hosting.

5. Il Progetto Sophie (25 MW) si sta preparando per un aggiornamento e un'espansione della flotta.

6. Il Progetto Kati (166 MW) continua le negoziazioni per i contratti di locazione terreni.

La società ha pubblicato anche nuovi blog sul consumo energetico dell'AI e sulla convergenza dell'AI con le energie rinnovabili.

Soluna Holdings, Inc. (NASDAQ: SLNH) ha publicado su actualización empresarial de septiembre, destacando los avances en varios proyectos. Los desarrollos clave incluyen:

1. La firma de un acuerdo preliminar para el Proyecto Rosa, que agrega 187 MW de capacidad de energía sostenible.

2. Los Proyectos Dorothy 1A y 1B (50 MW en total) completaron los esfuerzos de optimización y participaron con éxito en servicios auxiliares.

3. El Proyecto Dorothy 2 (48 MW) está avanzando con el nivelado del terreno y el vertido de hormigón.

4. El nuevo Proyecto Grace (2 MW) y el Proyecto Ada (1 MW) están avanzando en servicios de nube de AI y hosting.

5. El Proyecto Sophie (25 MW) se está preparando para una actualización y expansión de la flota.

6. El Proyecto Kati (166 MW) continúa negociaciones para arrendamientos de tierras.

La empresa también ha publicado nuevos blogs sobre el consumo energético de la IA y la convergencia de la IA con la energía renovable.

Soluna Holdings, Inc. (NASDAQ: SLNH)는 9월 사업 업데이트를 발표하며 다양한 프로젝트에서의 진행 상황을 강조했습니다. 주요 개발 사항은 다음과 같습니다:

1. 프로젝 로사(Project Rosa)에 대한 조건 시트 서명, 187MW의 지속 가능한 에너지 용량 추가.

2. 프로젝 도로시 1A 및 1B (총 50MW)가 최적화 작업을 완료하고 보조 서비스에 성공적으로 참여했습니다.

3. 프로젝 도로시 2 (48MW)는 부지 정리와 콘크리트 타기를 진행하고 있습니다.

4. 새로운 프로젝 그레이스 (2MW)와 프로젝 아다 (1MW)는 AI 클라우드 및 호스팅 서비스에서 발전하고 있습니다.

5. 프로젝 소피 (25MW)는 함대 업그레이드 및 확장을 준비하고 있습니다.

6. 프로젝 카티 (166MW)는 토지 임대 협상을 계속 진행 중입니다.

회사는 AI의 에너지 소비와 재생 가능 에너지와의 융합에 대한 새로운 블로그도 게시했습니다.

Soluna Holdings, Inc. (NASDAQ: SLNH) a publié sa mise à jour commerciale de septembre, soulignant les progrès réalisés dans divers projets. Les développements clés comprennent :

1. La signature d'une feuille de conditions pour le Projet Rosa, ajoutant 187 MW de capacité énergétique durable.

2. Les Projets Dorothy 1A et 1B (50 MW au total) ont achevé leurs efforts d'optimisation et ont participé avec succès à des services auxiliaires.

3. Le Projet Dorothy 2 (48 MW) progresse avec le nivellement du site et le coulage de béton.

4. Le nouveau Projet Grace (2 MW) et le Projet Ada (1 MW) avancent dans les services de cloud AI et d'hébergement.

5. Le Projet Sophie (25 MW) se prépare à une mise à niveau et à une expansion de la flotte.

6. Le Projet Kati (166 MW) continue les négociations portant sur les baux de terrain.

L'entreprise a également publié de nouveaux blogs sur la consommation d'énergie de l'IA et la convergence de l'IA avec les énergies renouvelables.

Soluna Holdings, Inc. (NASDAQ: SLNH) hat sein Geschäftsupdate für September veröffentlicht und die Fortschritte in verschiedenen Projekten hervorgehoben. Wichtige Entwicklungen umfassen:

1. Unterzeichnung eines Termsheets für das Projekt Rosa, mit dem 187 MW nachhaltige Energieerzeugungskapazität hinzugefügt werden.

2. Die Projekte Dorothy 1A und 1B (insgesamt 50 MW) haben Optimierungsarbeiten abgeschlossen und erfolgreich an Dienstleistungsangeboten teilgenommen.

3. Das Projekt Dorothy 2 (48 MW) schreitet mit der Geländepräparation und dem Betongießen voran.

4. Das neue Projekt Grace (2 MW) und das Projekt Ada (1 MW) machen Fortschritte im Bereich der KI-Cloud- und Hosting-Dienste.

5. Das Projekt Sophie (25 MW) bereitet sich auf ein Flottenupgrade und eine Erweiterung vor.

6. Das Projekt Kati (166 MW) führt weiterhin Verhandlungen über Grundstückspachtverträge.

Das Unternehmen hat auch neue Blogs über den Energieverbrauch von KI und die Zusammenführung von KI mit erneuerbaren Energien veröffentlicht.

Positive
  • Signed term sheet for Project Rosa, adding 187 MW of sustainable energy capacity
  • Successful completion of summer program for ancillary services participation
  • Progress in construction and infrastructure development for Project Dorothy 2
  • Advancement in AI cloud and hosting services with Projects Grace and Ada
  • Planned 8.8 MW fleet upgrade and 3.3 MW expansion for Project Sophie
Negative
  • None.

ALBANY, N.Y.--(BUSINESS WIRE)-- Soluna Holdings, Inc. (“SHI” or the “Company”), (NASDAQ: SLNH), a developer of green data centers for intensive computing applications including Bitcoin mining and AI, announced its September project site-level operations, developments, and updates.

Soluna's Project Dorothy 2 - Under Construction (Photo: Business Wire)

Soluna's Project Dorothy 2 - Under Construction (Photo: Business Wire)

The Company has provided the following Corporate and Site Updates.

Key Company Metrics:

The monthly metrics are now available here.

Corporate Highlights:

  • Term Sheets for Project Rosa – Soluna signed a term sheet with a renewable energy leader for Project Rosa, boosting capacity by 187 MW of sustainable energy for AI and Bitcoin mining.
  • CEO John Belizaire attended the 2024 Ai4 Conference – A recording of the panel “The AI Ecosystem: Hardware, Cloud, and Enterprise Integration” can now be viewed here.
  • New Blog – We unpack the problems and novel solutions to AI’s bottomless energy appetite. Read it here.
  • New Blog – We explore the convergence of artificial intelligence and renewable energy and the resulting innovative solutions. Read it here.

Key Project Updates:

Project Dorothy 1A (25 MW, Bitcoin Hosting) / Project Dorothy 1B (25 MW, Bitcoin Prop-Mining):

  • The Four Coincident Peak (4CP) period ended in September with our MaestroOS(™) control system successfully responding to all demand requirements.
  • Optimization efforts to include building insulation, heat shielding, and power infrastructure cooling solutions have been completed.
  • We successfully completed the summer program for our participation in ancillary services.

Project Dorothy 2 (48 MW, Bitcoin Hosting):

  • Site grading will be completed in the coming weeks.
  • Civil construction teams are in the process of pouring concrete pads for the initial phase of work with MDC fabrication underway so building erection can follow shortly after.
  • All long lead power infrastructure has been received.
  • Dates to complete the substation interconnection are in the process of being finalized with work slated to begin in December.

New Project Grace (2 MW at Dorothy 2, AI Cloud/Hosting):

New Project Ada (1 MW, AI Cloud with HPE):

  • 6 POCs in progress or completed with partners or potential customers.
  • New sales team in contract negotiations with several customers to fill the initial Cluster.
  • Demand for an additional 84 Nodes (or 672 GPUs) is on the waitlist.
  • Attracted leading aggregators to our Cloud platform.

Project Sophie (25 MW, Bitcoin Hosting with Profit Share, AI Hosting):

  • The site has continued to operate at a high level as cooler temperatures persist into the fall season.
  • Preparations are underway for an 8.8 MW fleet upgrade and 3.3 MW expansion of an existing customer to be completed in October.

Project Kati (166 MW, Bitcoin Hosting and AI):

  • Meter Design Proposal Submitted to AEP
  • Negotiations continue with landowners for the site land leases.

View Soluna’s recent AMA here.

View Soluna 2024 Earnings Power Presentation here.

Safe Harbor Statement

This announcement contains forward-looking statements. These statements are made under the "safe harbor" provisions of the U.S. Private Securities Litigation Reform Act of 1995. These forward-looking statements can be identified by terminology such as "will," "expects," "anticipates," "future," "intends," "plans," "believes," "estimates," "confident" and similar statements. Soluna Holdings, Inc. may also make written or oral forward-looking statements in its periodic reports to the U.S. Securities and Exchange Commission, in its annual report to shareholders, in press releases and other written materials, and in oral statements made by its officers, directors, or employees to third parties. Statements that are not historical facts, including but not limited to statements about Soluna’s beliefs and expectations, are forward-looking statements. Forward-looking statements involve inherent risks and uncertainties, further information regarding which is included in the Company's filings with the Securities and Exchange Commission. All information provided in this press release is as of the date of the press release, and Soluna Holdings, Inc. undertakes no duty to update such information, except as required under applicable law.

Non-GAAP Measures

In addition to figures prepared in accordance with GAAP, Soluna from time to time presents alternative non-GAAP performance measures, e.g., EBITDA, adjusted EBITDA, adjusted net profit/loss, adjusted earnings per share, free cash flow, both on a company basis and on a project-level basis. Project-level measures may not take into account a full allocation of corporate expenses. These measures should be considered in addition to, but not as a substitute for, the information prepared in accordance with GAAP. Alternative performance measures are not subject to GAAP or any other generally accepted accounting principle. Other companies may define these terms in different ways. See our annual report on Form 10-K for the year ended December 31, 2023, for an explanation of how management uses these measures in evaluating its operations.

About Soluna Holdings, Inc. (SLNH)

Soluna is on a mission to make renewable energy a global superpower using computing as a catalyst. The company designs, develops, and operates digital infrastructure that transforms surplus renewable energy into global computing resources. Soluna’s pioneering data centers are strategically co-located with wind, solar, or hydroelectric power plants to support high-performance computing applications including Bitcoin Mining, Generative AI, and other compute-intensive applications. Soluna’s proprietary software MaestroOS(™) helps energize a greener grid while delivering cost-effective and sustainable computing solutions, and superior returns. To learn more visit solunacomputing.com. Follow us on X (formerly Twitter) at @SolunaHoldings.

Sam Sova

Partner and CEO

SOVA

Sam@letsgosova.com

Source: Soluna Holdings, Inc.

FAQ

What is the status of Soluna's Project Dorothy 2?

Project Dorothy 2, a 48 MW Bitcoin hosting facility, is currently under construction. Site grading is nearing completion, concrete pads are being poured, and MDC fabrication is underway. Long lead power infrastructure has been received, and substation interconnection work is expected to begin in December.

How much additional capacity will Project Rosa add to Soluna (SLNH)?

Project Rosa is expected to add 187 MW of sustainable energy capacity to Soluna's portfolio for AI and Bitcoin mining operations, as per the term sheet signed with a renewable energy leader.

What upgrades are planned for Soluna's Project Sophie?

Soluna (SLNH) is preparing for an 8.8 MW fleet upgrade and a 3.3 MW expansion of an existing customer at Project Sophie, scheduled to be completed in October.

How is Soluna (SLNH) expanding its AI cloud services?

Soluna is expanding its AI cloud services through Project Ada, which has 6 POCs in progress or completed with partners or potential customers. The company is also in contract negotiations with several customers and has a waitlist demand for an additional 84 Nodes (672 GPUs).

Soluna Holdings, Inc.

NASDAQ:SLNH

SLNH Rankings

SLNH Latest News

SLNH Stock Data

29.47M
5.96M
27.24%
5.23%
2.86%
Capital Markets
Finance Services
Link
United States of America
ALBANY