SCOTTIE RESOURCES ANNOUNCES 20,000 METRE DRILL PROGRAM AND FINAL RESULTS FROM 2022 INCLUDING 5.28 G/T GOLD OVER 4.50 METRES IN NEW ZONE IN STOCKWORK AREA
Scottie Resources Corp. announced a 20,000 metre drill program at the Scottie Gold Mine Project, commencing in late June 2023. This initiative aims to expand the Blueberry Contact Zone, focusing on approximately 17,000 metres of drilling. Assays from the Stockwork area highlighted a high-grade intercept of 5.28 g/t gold over 4.50 metres, contributing to the project's potential. The drilling will explore additional targets, including the C/D Zones. A ground-based horizontal loop survey (HLEM) is also planned to identify sulphide-rich structures. The exploration program underscores a commitment to uncovering significant gold deposits within the Golden Triangle region of British Columbia.
- 20,000 metre drill program planned to expand Blueberry Contact Zone.
- High-grade intercept of 5.28 g/t gold over 4.50 metres reported from Stockwork area.
- Robust exploration activity expected to enhance understanding of mineralization.
- Targeting additional exploration areas, including C/D Zones and Stockwork.
- None.
Highlights
- 20,000 metre diamond drill program planned on the
Scottie Gold Mine Project - Focus on expansion of the Blueberry Contact Zone
- Testing an additional 600 metres of strike length (currently 1,550 metres)
- Exploration targets at C / D Zones, Stockwork area, Scottie Gold Mine
- Ground-based horizontal loop survey (HLEM) planned to test for additional sulphide-rich cross-structures in the andesite and siltstone units that comprise the Blueberry Contact Zone
- Drilling covered HLEM targets in 2022 generated intercepts of up to 7.10 g/t gold over 6.09 metres
- Stockwork area drill hole SR22-203 returned 5.28 g/t gold over a core length of 4.50 metres in a new zone
- Area is adjacent to the projected northern extension of the Blueberry Contact Zone that is off-set by an E-W fault
- Occurs within a large relatively untested gold-in-soil anomaly
- All 2022 holes intercepted anomalous gold mineralization throughout the entire hole length, including 245 metres of 0.35 g/t gold in SR22-203
- Potential new deposit type on the property.
"We are excited to be ramping up for another robust exploration program on the expanding Blueberry Contact Zone," comments President and CEO,
2023 Drill Program Overview
The drill program will commence in late-June (snow melt dependant) with three skid-based diamond drills targeting the Blueberry Contact Zone zones for expansion. Three primary areas of expansion focus are: (1) Extension at depth from 2022 drill intercepts, (2) areas in between widely spaced holes, (3) the 600 metre southern continuation of the contact from the southernmost 2022 drilling to the property border with Newcrest Mining. In early August one of the drills will transition to fly-drills and test targets around the Scottie Gold Mine, as well as other sites requiring helicopter access.
Blueberry Drilling
After making the Blueberry Contact Zone discovery in 2019 the geology team at Scottie developed a new geological model which transformed the Blueberry target from a single vein to a property scale structural feature. This model which was tested throughout the 2021/2022 field seasons has helped define the architecture of the system, which links several widely spaced high-quality targets along a common structure. Testing during 2022 doubled the existing strike length of the system, extending the zone to 1,550 metres and to a maximum depth of 400 metres. Combining multiple geophysical data sets, extensive mapping and surficial sample data has allowed the team to extrapolate the structure beneath the historic lakebed, in order to generate high-confidence drill targets – many of which were successful. Fieldwork during 2022 generated additional targets using similar parameters that will be further tested during 2023.
2023 Exploration Fieldwork
In addition to drilling, the Company will be carrying out an extensive greenfield exploration program on the
About the Blueberry Contact Zone
Stockwork Area Results
The Stockwork area is situated approximately 1.3 kilometres northwest of the Blueberry Contact Zone. Originally, the area was a target for the easterly extension of the high-grade Bend vein which historic mapping, geophysics, and soil sampling were designed around. The discovery of the Blueberry Contact Zone caused renewed interest in the area, due to the projected offset of the contact due to the north bounding 'Mill' fault (see Figure 2). On the northside of the fault the contact is complicated by the emplacement of a dioritic intrusion (interpreted to be part of the Texas Creek Plutonic Suite) between the andesite and siltstone units.
VP Exploration, Dr.
Table 1: Selected 2021 - 2022 drill results from the Stockwork area.
Drill Hole | From (m) | To (m) | Width* (m) | Gold (g/t) | |
SR22-203 | 3 | 248 (EOH) | 245.00 | 0.35 | |
including | 45.5 | 59 | 13.50 | 2.29 | |
including | 47 | 53 | 4.50 | 5.28 | |
SR22-205 | 12.05 | 170 (EOH) | 157.95 | 0.13 | |
16.51 | 119.5 | 84.49 | 0.17 | ||
SR22-208 | 16 | 107 (EOH) | 91.00 | 0.13 | |
2021 Stockwork Zone Holes | |||||
SR21-085** | 6.34 | 92 | 75.16 | 0.20 | |
including | 48.64 | 78.5 | 29.86 | 0.32 | |
SR21-087** | 5.79 | 182 (EOH) | 176.21 | 0.20 | |
including | 15.84 | 79.91 | 64.07 | 0.36 |
* True thicknesses of mineralized intercepts are undetermined, ** Results from 2021 drill program
Drilling in the Stockwork area during 2021 and 2022 produced consistent long intervals of anomalous gold over the entire hole lengths, e.g., 0.35 g/t gold over 245 metres in SR22-203, which represents the longest hole drilled in the area. Hole SR22-203 also included the first high-grade intercept reported in the area, grading 5.28 g/t over 4.50 metres. In all holes (Table 1) mineralization is primarily hosted in the andesite and siltstone, although anomalous gold also occurs in the diorite phase but to a lesser extent.
The clear boundary of the gold-in-soil anomaly at Stockwork across the right lateral 'Mill' fault is strong evidence of both the reliability and scale of the anomaly. The occurrence of widespread low-grade gold both at surface and in drilling supports the presence of a bulk tonnage exploration target on the property. While the mineralization at Blueberry, Bend, and the Scottie Gold Mine all display characteristics of a structurally controlled intrusion-related gold system, the preliminary model used to explain and target the mineralization at Stockwork is that of a porphyry system.
Quality Assurance and Control
Results from samples taken during the 2022 field season were analyzed at SGS Minerals in
This release constitutes the final results from Scottie's 2022 drill program. All significant intercepts from the season have now been reported.
ABOUT
Scottie owns a
The Company's focus is on expanding the known mineralization around the past-producing mines while advancing near mine high-grade gold targets, with the purpose of delivering a potential resource.
All of the Company's properties are located in the area known as
Forward Looking Statements
This news release may contain forward–looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward–looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward–looking statements are based on the beliefs, estimates and opinions of the Company's management on the date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forward–looking statements whether as a result of new information, future events or otherwise.
Neither
View original content to download multimedia:https://www.prnewswire.com/news-releases/scottie-resources-announces-20-000-metre-drill-program-and-final-results-from-2022-including-5-28-gt-gold-over-4-50-metres-in-new-zone-in-stockwork-area-301802931.html
SOURCE
FAQ
What is the focus of Scottie Resources' 2023 drill program?
What significant assay results were reported by Scottie Resources?
When is the drilling program set to commence for Scottie Resources?
How many metres will Scottie Resources drill this year?