Power Metallic (OTCBB: PNPNF) has reported significant high-grade assay results from its summer drilling program at the Lion Zone. The program completed 34 holes totaling 17,250 meters across multiple areas. Notable intersections include 22.66 meters of 4.57% CuEq in Hole 020 and 28.0 meters of 4.28% CuEq in Hole 015.

The summer campaign targeted several areas including Lion Extensional Drilling (3,929m), Lion In-fill drilling (5,845m), Tiger Area (2,067m), Nisk Deposit (3,575m), and Regional Exploration (1,833m). The company has implemented infrastructure improvements, including a drill mat road with bridged stream crossings, enabling year-round access to the Lion area.

Additionally, Power Metallic announced expanded mining rights near the Lion Zone discovery through a Quebec government land allocation process, with pending results expected in 30-90 days.

Power Metallic (OTCBB: PNPNF) ha riportato risultati di saggi significativi ad alta grade nel suo programma estivo di trivellazione nella Lion Zone. Il programma ha completato 34 fori per un totale di 17.250 metri in diverse aree. Intersezioni note includono 22,66 metri di 4,57% CuEq nel Pozzo 020 e 28,0 metri di 4,28% CuEq nel Pozzo 015.

La campagna estiva ha mirato diverse aree tra cui Lion Extensional Drilling (3.929 m), Lion In-fill drilling (5.845 m), Tiger Area (2.067 m), Nisk Deposit (3.575 m) e Regional Exploration (1.833 m). L'azienda ha implementato miglioramenti infrastrutturali, tra cui una strada di accesso per le trivellazioni con attraversamenti di corsi d'acqua ponticati, che consente l'accesso tutto l'anno all'area Lion.

Inoltre, Power Metallic ha annunciato l'espansione dei diritti minerari vicino alla scoperta della Lion Zone tramite un processo di assegnazione di terre del governo del Quebec, con risultati in sospeso attesi entro 30-90 giorni.

Power Metallic (OTCBB: PNPNF) ha informado resultados significativos de ensayo de alta ley en su programa de perforación de verano en la Lion Zone. El programa completó 34 hoyos que totalizan 17,250 metros en varias áreas. Intersecciones notables incluyen 22.66 metros de 4.57% CuEq en el pozo 020 y 28.0 metros de 4.28% CuEq en el pozo 015.

La campaña de verano se dirigió a varias áreas, incluidas Lion Extensional Drilling (3,929 m), Lion In-fill drilling (5,845 m), Tiger Area (2,067 m), Nisk Deposit (3,575 m) y Regional Exploration (1,833 m). La empresa ha implementado mejoras en la infraestructura, incluida una carretera de tablones para perforación con cruces de arroyo puenteados, que permite el acceso durante todo el año a la zona Lion.

Además, Power Metallic anunció la ampliación de derechos mineros cerca del descubrimiento de la Lion Zone mediante un proceso de asignación de tierras del gobierno de Quebec, con resultados pendientes esperados en 30-90 días.

Power Metallic (OTCBB: PNPNF)는 Lion Zone에서 여름 시추 프로그램의 고품질 샘플 결과를 보고했습니다. 이 프로그램은 여러 지역에 걸쳐 총 17,250미터의 34구멍을 완성했습니다. 주목할 만한 교차 구간은 Hole 020에서 22.66미터의 4.57% CuEq, Hole 015에서 28.0미터의 4.28% CuEq입니다.

여름 캠페인은 Lion Extensional Drilling(3,929m), Lion In-fill drilling(5,845m), Tiger Area(2,067m), Nisk Deposit(3,575m), Regional Exploration(1,833m) 등 여러 지역을 대상으로 했습니다. 회사는 루트 주행이 연중 가능하도록 bridged stream crossings가 있는 드릴 매트 도로를 포함한 인프라 개선을 도입했습니다.

또한 Power Metallic은 퀘벡 주정부 토지 배정 절차를 통해 Lion Zone 발견 부근의 광권을 확대했다고 발표했으며, 결과는 30-90일 이내에 예상됩니다.

Power Metallic (OTCBB: PNPNF) a rapporté des résultats d'analyses significatifs et de haute teneur de son programme de forage estival dans la Lion Zone. Le programme a achevé 34 trous totalisant 17 250 mètres dans plusieurs zones. Les intersections notables incluent 22,66 mètres à 4,57% CuEq dans le puits 020 et 28,0 mètres à 4,28% CuEq dans le puits 015.

La campagne estivale ciblait plusieurs zones, notamment Lion Extensional Drilling (3 929 m), Lion In-fill drilling (5 845 m), Tiger Area (2 067 m), Nisk Deposit (3 575 m) et Regional Exploration (1 833 m). L'entreprise a mis en place des améliorations d'infrastructure, notamment une route de plate-forme de forage avec des traversées de ruisseaux pontées, permettant un accès toute l'année à la zone Lion.

De plus, Power Metallic a annoncé l'élargissement des droits miniers près de la découverte de Lion Zone via un processus d'allocation foncière du gouvernement du Québec, les résultats étant attendus sous 30 à 90 jours.

Power Metallic (OTCBB: PNPNF) hat bedeutende hochgradige Ergebnisse aus dem Sommerbohrprogramm in der Lion Zone gemeldet. Das Programm umfasste 34 Bohrlöcher mit insgesamt 17.250 Metern in mehreren Bereichen. Bemerkenswerte Intersections umfassen 22,66 Meter mit 4,57% CuEq in Loch 020 und 28,0 Meter mit 4,28% CuEq in Loch 015.

Die Sommerkampagne zielte auf mehrere Bereiche ab, darunter Lion Extensional Drilling (3.929 m), Lion In-fill drilling (5.845 m), Tiger Area (2.067 m), Nisk Deposit (3.575 m) und Regional Exploration (1.833 m). Das Unternehmen hat Infrastrukturverbesserungen umgesetzt, darunter eine Bohrmatten-Straßentrasse mit überbrückten Bachläufen, die einen ganzjährigen Zugang zur Lion-Region ermöglicht.

Darüber hinaus kündigte Power Metallic die Erweiterung der Bergbaurechte in der Nähe der Lion Zone durch einen Landzuweisungsprozess der Regierung von Quebec an, mit Ergebnissen, die in 30–90 Tagen erwartet werden.

Power Metallic (OTCBB: PNPNF) أبلغت عن نتائج فحص عالية الجودة ذات أهمية من برنامج الحفر الصيفي في منطقة Lion Zone. أكمل البرنامج 34 بئراً بإجمالي 17,250 متراً عبر عدة مناطق. تشمل العيّنات البارزة 22.66 متراً من 4.57% CuEq في البئر 020 و 28.0 متر من 4.28% CuEq في البئر 015.

استهدفت الحملة الصيفية عدة مناطق بما فيها Lion Extensional Drilling (3,929م)، Lion In-fill drilling (5,845م)، Tiger Area (2,067م)، Nisk Deposit (3,575م)، والتنقيب الإقليمي (1,833م). نفذت الشركة تحسينات بنية تحتية، بما في ذلك طريق طور من طبقة الحفر مع معابر جداول موصولة بالجسور، مما يتيح الوصول على مدار السنة إلى منطقة Lion.

بالإضافة إلى ذلك، أعلنت Power Metallic عن توسيع حقوق التعدين بالقرب من اكتشاف Lion Zone عبر عملية تخصيص أراضٍ حكومية في كيبيك، مع نتائج معلقة من المتوقع أن تكون خلال 30-90 يوماً.

Power Metallic (OTCBB: PNPNF) 已在 Lion Zone 的夏季钻探计划中报告了显著的高品位化验结果。该计划在多个区域完成了共34孔,总长17,250米。值得注意的交叉段包括020号孔的22.66米,CuEq=4.57%以及015号孔的28.0米,CuEq=4.28%

夏季作业针对多个区域进行,包括 Lion Extensional Drilling(3,929米)、Lion In-fill drilling(5,845米)、Tiger Area(2,067米)、Nisk Deposit(3,575米)和 Regional Exploration(1,833米)。公司已经实施基础设施改进,包括带桥梁河流穿越的钻探垫路,年内可进入 Lion 区域。

此外,Power Metallic 宣布通过魁北克政府的土地分配程序,拓展 Lion Zone 附近的矿权,相关结果预计在30–90天内公布。

Positive
  • High-grade drill results with significant copper equivalent values (22.66m of 4.57% CuEq and 28.0m of 4.28% CuEq)
  • Successful completion of extensive drilling program covering 17,250 meters across multiple target areas
  • Infrastructure improvements enabling year-round drilling access
  • Potential expansion of mining rights through new land allocation near Lion Zone
Negative
  • Drilling season ended early due to Moose Break on September 15th with three holes incomplete
  • Lab results delayed due to high industry demand
  • High variability in grade and thickness observed in drill results
  • Extension hole PML-025-014 missed high-grade portion of Lion zone

22.66 meters of 4.57% CuEq, including 6.05 meters of 9.70% CuEq in Hole 020, and
28.0 meters of 4.28% CuEq, including 3.4 meters of 15.45% CuEq in Hole 015

TORONTO, Sept. 22, 2025 /PRNewswire/ - Power Metallic Mines Inc(the "Company" or "Power Metallic") (TSXV: PNPN) (OTCBB: PNPNF) (Frankfurt: IVV) is pleased to announce the completion of the summer drill program and the return of five (5) holes from the 2025 drill campaign focused on the Lion Zon. The summer program included the drilling of 34 holes for a total of 17,250 meters drilled. Three (3) holes were in progress when the drilling season ended due to Moose Break on September 15th. Of the 34 holes, 13 holes were surveyed with Bore Hole Electromagnetic (BHEM). Summer program drilling focus areas can be seen over the entirety of Power Metallic's land package (Figure 1 Land package overlain on basin geology with summer program drill locations). Table 1 lays out the summer program target zones, hole identified, depth and BEHM survey status.            

Figure 1: Land package overlain on basin geology with Summer program drill locations (CNW Group/Power Metallic Mines Inc.)

Table 1: Summer drill program including target zone, hole identifier, depth and BEHM status (CNW Group/Power Metallic Mines Inc.)

Power Metallic is pleased to announce the return of five (5) holes from the spring 2025 drilling campaign focused on the Lion Zone. The five holes were testing plunge extension (PML-25-014) and conducting in-fill drilling to approximately 50m centres for future mineral resource estimations (PML-25-015, PML-25-016A, PML-25-018, PML-25-020) (Figure 2).

Figure 2: Lion Area long-section with drill hole locations reported in this news release. (CNW Group/Power Metallic Mines Inc.)

The Summer drill campaign targeted several different prospective areas with total meters drilled of approximately 17,250 meters. This included:


• Lion Extensional Drilling                                                                    

3,929 meters


• Lion In-fill drilling for future Mineral Resource Estimation              

5,845 meters


• Tiger Area drilling                                                                              

2,067 meters


• Nisk Deposit Drilling                                                                          

3,575 meters


• Regional Exploration drilling (new Li-FT acquisition ground)          

1,833 meters

The initial Summer 2025 drill plan had proposed to complete extension holes following the Lion Zone plunge. One of the extension holes results is included in this news release (PML-25-014) and results for subsequent extension holes are pending. To facilitate this drilling in the Lion area required crossing streams and marshes to make it accessible to overland haulage of drill equipment. Environmental assessment was carried out and recommendations were to create a drill mat road (Figure 3) with bridged stream crossings to make the Lion area accessible to more powerful skid mounted drills. This change has allowed the extensional drilling at Lion to resume and Power Metallic expects much better extensional drilling productivity from the larger drills as we move into the fall campaign. The drill roads also provide guaranteed access to the Lion area all year round with no need to stop for seasonal changes.

Figure 3: New drill road construction to access the Lion area all year round. (CNW Group/Power Metallic Mines Inc.)

There are no assay results yet from drilling the Tiger area, which includes extensional exploration holes between the Lion and Tiger zones. All the Tiger area holes as well as the Lion Extensional holes, the Nisk deposit holes, and the regional exploration holes received bore hole EM surveys. 

One of the heli-portable drills has now been re-assigned to drilling airborne EM anomalies developed from our recently completed VTEM property wide survey (regional exploration holes). This survey resulted in many conductors which are being prioritised for drilling based on our summer reconnaissance mapping and prospecting program that was designed to identify favourable geology for polymetallic deposits. All holes to date have hit sulphide bearing structures, verifying the BHEM conductors. Assay results from this exploration drill program are pending.

LION ZONE DRILL RESULTS (Table 1)

The one (1) completed plunge extension zone (PML-025-014) intersected the Lion deposit approximately 100m west and 175m down plunge from the nearest known drill hole. The high grade portion of the Lion zone was not intersected and the disseminated zone returned a 9.44m intersection of 1.10% CuEq1.

In-fill drilling for future mineral resource estimation confirmed the continuity of the Lion Zone (Figure 1) in all holes, but also highlighted the previously interpreted high variability of  grade and thickness. As example, holes PML-25-015, 018 and 020 (Figure 4) confirmed and improved grade and thickness from previous surrounding holes, PML-25-016a was narrower and lower grade than surrounding holes. The in-fill drilling will greatly increase our confidence in  modelling of the Lion zone for future resource estimation.

Drill results from the lab has been slowed by high demand from the mining industry this summer. We are still awaiting results from holes PML-25-017 and PML-25-019 and these will be reported when results are available. The summer program has now shut down for a few weeks over the Cree moose hunt season (the "Moose Break"), and will start up again in a couple of weeks. Pending holes at Lion include up to PML-25-034a, as well as additional holes at the Nisk deposit, exploration drilling between Lion and Tiger, and six (6) exploration holes completed on VTEM anomalies.  

Figure 4: Core photo of a portion of the high-grade mineralization in drill hole PML-25-020 (CNW Group/Power Metallic Mines Inc.)

 

Table 2: Significant assay results Spring 2025 - Lion zone  

 

Hole

From

To

Length

Au

Ag

Cu

Pd

Pt

Ni

CuEq Rec*

(m)

(m)

(m)

(g/t)

( g/t )

( %)

(g/t)

( g/t )

( %)

( %)

PML-25-014

464.00

466.00

2.00

0.04

1.57

0.30

0.41

0.30

0.30

1.46

and

590.17

595.25

9.44

0.28

5.98

0.39

1.02

0.09

0.03

1.01

Including

593.17

595.25

2.08

0.67

14.18

1.08

2.29

0.03

0.04

2.36












PML-25-015

162.00

190.00

28.00

0.56

25.18

2.87

2.86

0.35

0.13

4.28

Including

176.00

177.90

1.90

2.83

45.78

13.60

8.14

0.50

0.16

17.68

and

186.60

190.00

3.40

0.69

84.37

9.79

15.12

2.16

0.22

15.45

PML-25-016a

292.20

302.30

7.10

0.07

2.06

0.31

1.01

1.13

0.20

1.41

PML-25-018

479.00

508.50

29.50

0.15

4.96

0.54

1.80

0.58

0.09

1.58

Including

488.16

495.00

6.84

0.20

11.41

0.83

4.54

1.79

0.12

3.30

PML-25-020

241.10

262.86

21.76

0.24

4.67

0.10

1.61

1.09

0.01

1.19

Including

252.86

255.86

3.00

0.92

12.50

0.32

6.68

4.80

0.02

4.81

and

280.84

303.50

22.66

0.78

7.63

3.04

2.79

0.70

0.16

4.57

Including

286.15

292.20

6.05

1.03

9.65

6.11

8.33

1.75

0.27

9.70


Note: Reported length is downhole distance; true width based on model projections is estimated as 85% of downhole length

1Copper Equivalent Rec Calculation (CUEqRec1)

CuEqRec represents CuEq calculated based on the following metal prices (USD) : 2,360.15 $/oz Au, 27.98 $/oz Ag, 1,215.00 $/oz Pd, 1000.00 $/oz Pt, 4.00 $/lb Cu, 10.00 $/lb Ni and 22.50 $/lb Co., and a recovery grade of 80% for all commodities, consistent with comparable peers.

Previously released drill results are available in a public database accessible as a download on Power Metallic's website. Currently this database contains hole assay and collar information up to hole PML-25-013 and will be updated as soon as possible with all remaining publicly released holes. 

FALL AND WINTER PROGRAM UPDATE 

On September 3rd, 2025 the Government of Quebec published in the No. 36 Gazette Officielle du Québec on expanded mining rights within close proximity to our Lion Zone discovery. The process gives previous claims holders any land from their portfolio that had been restricted previously by Hydro-Quebec. That land addition can be seen in the figure 5 below.      

Figure 5: Land package overlain on basin geology with summer program drill locations (CNW Group/Power Metallic Mines Inc.)

Additional land was open to public bidding and Power Metallic bid and is waiting on the results of the bid which is anticipated to be registered in the next 30-90 days with the extension lands shown in Figure 5. Additionally, a detailed summary of the Fall-Winter program is planned to be released by the end of October sharing more details on BHEM results, land changes and drilling program plans over the fall and winter periods.           

"We were very excited to get this ground. Honestly as important as our drilling program was this summer, I can sincerely say our primary mission was to get more land. The Lift Package and the lifting of the Hydro Quebec restriction will really benefit the projects development. Power Metallic approached our friends and partner the James Bay Cree for their assistance in lobbying Hydro-Quebec to remove these restrictions on land that clearly was no longer required. With their assistance and the understanding and cooperation of Hydro-Quebec we were able to have the land referred to the ministry for the process that has now occurred. We will have further comments on this when the full process is complete" commented Terry Lynch Power Metallic CEO        

Qualified Person

Joseph Campbell, P.Geo, VP Exploration at Power Metallic, is the qualified person who has reviewed and approved the technical disclosure contained in this news release.

About Power Metallic Mines Inc.

Power Metallic is a Canadian exploration company focused on advancing the Nisk Project Area (Nisk–Lion–Tiger)—a high–grade Copper–PGE, Nickel, gold and silver system—toward Canada's next polymetallic mine.

On 1 February 2021, Power Metallic (then Chilean Metals) secured an option to earn up to 80% of the Nisk project from Critical Elements Lithium Corp. (TSX–V: CRE). Following the June 2025 purchase of 313 adjoining claims (~167 km²) from Li–FT Power, the Company now controls ~212.86 km² and roughly 50 km of prospective basin margins.

Power Metallic is expanding mineralization at the Nisk and Lion discovery zones, evaluating the Tiger target, and exploring the enlarged land package through successive drill programs.

Beyond the Nisk Project Area, Power Metallic indirectly has an interest in significant land packages in British Columbia and Chile, by its 50% share ownership position in Chilean Metals Inc., which were spun out from Power Metallic via a plan of arrangement on February 3, 2025.

It also owns 100% of Power Metallic Arabia which owns 100% interest in the Jabul Baudan exploration license in The Kingdon of Saudi Arabia's JabalSaid Belt. The property encompasses over 200 square kilometres in an area recognized for its high prospectivity for copper gold and zinc mineralization. The region is known for its massive volcanic sulfide (VMS) deposits, including the world-class Jabal Sayid mine and the promising Umm and Damad deposit.

For further information, readers are encouraged to contact:
Power Metallic Mines Inc.
The Canadian Venture Building
82 Richmond St East, Suite 202
Toronto, ON

Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

QAQC and Sampling

GeoVector Management Inc ("GeoVector") is the Consulting company retained to perform the actual drilling program, which includes core logging and sampling of the drill core.

All samples were submitted to and analyzed at Activation Laboratories Ltd ("Actlabs"), an independent commercial laboratory for both the sample preparation and assaying. Actlabs is a commercial laboratory independent of Power Metallic with no interest in the Project. Actlabs is an ISO 9001 and 17025 certified and accredited laboratories. Samples submitted through Actlabs are run through standard preparation methods and analysed using RX-1 (Dry, crush (< 7 kg) up to 80% passing 2 mm, riffle split (250 g) and pulverize (mild steel) to 95% passing 105 μm) preparation methods, and using 1F2 (ICP-OES) and 1C-OES - 4-Acid near total digestion + Gold-Platinum-Palladium analysis and 8-Peroxide ICP-OES, for regular and over detection limit analysis. Pegmatite samples are analyzed using UT7 - Li up to 5%, Rb up to 2% method. Actlabs also undertake their own internal coarse and pulp duplicate analysis to ensure proper sample preparation and equipment calibration.

GeoVector's QAQC program includes regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results. QAQC and data validation was performed, and no material errors were observed.

Cautionary Note Regarding Forward-Looking Statements

This message contains certain statements that may be deemed "forward-looking statements" concerning the Company within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential," "indicates," "opportunity," "possible" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, are subject to risks and uncertainties, and actual results or realities may differ materially from those in the forward-looking statements. Such material risks and uncertainties include, but are not limited to, among others; the timing for various drilling plans; the ability to raise sufficient capital to fund its obligations under its property agreements going forward and conduct drilling and exploration; to maintain its mineral tenures and concessions in good standing; to explore and develop its projects; changes in economic conditions or financial markets; the inherent hazards associates with mineral exploration and mining operations; future prices of nickel and other metals; changes in general economic conditions; accuracy of mineral resource and reserve estimates; the potential for new discoveries; the ability of the Company to obtain the necessary permits and consents required to explore, drill and develop the projects and if accepted, to obtain such licenses and approvals in a timely fashion relative to the Company's plans and business objectives for the applicable project; the general ability of the Company to monetize its mineral resources; and changes in environmental and other laws or regulations that could have an impact on the Company's operations, compliance with environmental laws and regulations, dependence on key management personnel and general competition in the mining industry.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/power-metallic-reports-high-grade-assays-and-provides-summer-update-302562998.html

SOURCE Power Metallic Mines Inc.

FAQ

What were the key drilling results from Power Metallic's (PNPNF) summer 2025 program?

The key results included 22.66 meters of 4.57% CuEq in Hole 020 and 28.0 meters of 4.28% CuEq in Hole 015 at the Lion Zone, demonstrating significant high-grade mineralization.

How many meters did Power Metallic drill in its summer 2025 program?

Power Metallic completed 34 holes totaling 17,250 meters across multiple areas, including Lion Extensional Drilling (3,929m), Lion In-fill drilling (5,845m), Tiger Area (2,067m), Nisk Deposit (3,575m), and Regional Exploration (1,833m).

What infrastructure improvements did Power Metallic make at the Lion Zone?

The company constructed a drill mat road with bridged stream crossings, enabling year-round access to the Lion area for more powerful skid-mounted drills.

What is the status of Power Metallic's mining rights expansion in Quebec?

On September 3rd, 2025, Power Metallic received expanded mining rights near the Lion Zone through Quebec's official gazette, with additional land bid results pending within 30-90 days.

When will Power Metallic resume drilling after the Moose Break?

The summer program was paused for the Cree moose hunt season ('Moose Break') on September 15th and is expected to resume in a couple of weeks.
Power Metallic Mines Inc

OTC:PNPNF

PNPNF Rankings

PNPNF Latest News

PNPNF Stock Data

230.38M
215.79M
6.51%
3.34%
Other Industrial Metals & Mining
Basic Materials
Link
Canada
Toronto