Noram Produces High Purity Lithium Carbonate from Zeus Lithium Project Samples
- Successful completion of the third phase of metallurgical testing confirms the process to produce battery-grade lithium carbonate for the electric vehicle industry in the United States. The purity of the lithium carbonate produced was 99.2%, with a high level of confidence that battery grade lithium carbonate (+99.5%) can be achieved at a commercial scale at Zeus.
- None.
VANCOUVER, BC / ACCESSWIRE / November 14, 2023 / Noram Lithium Corp. ("Noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is providing an update on its
The Company recently completed a third phase of metallurgical testing on Zeus drill core at Kemetco Research Inc. in Richmond, BC Canada and confirmed the metallurgical processing flow sheet for the Project (see news release dated September 13, 2023). During the final phases of the test work program, high purity lithium carbonate was produced from solution generated by large laboratory scale batch leach tests (Figure 1).
Figure 1 -
"The Phase III metallurgical test work program at Kemetco and associated modelling and design work has been a tremendous success" stated Greg McCunn, CEO of Noram. "The production of a high purity product from the solution generated during larger scale batch leach tests is the final confirmation that we have a process that can successfully be implemented to produce battery grade lithium carbonate for the electric vehicle industry in the United States."
The purity of the lithium carbonate produced was
For additional information:
Contacts:
In Europe: VP Corporate Development simon.studer@noramlithium.com
Elsewhere: Investor Relations at ir@noramlithiumcorp.com
Website: www.noramlithiumcorp.com
ON BEHALF OF THE BOARD OF DIRECTORS
Sandy MacDougall
Founder and Executive Chairman
About Noram Lithium Corp.
Noram Lithium Corp. (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is focusing on advancing its
Qualified Person
The technical information contained in this news release has been reviewed and approved by Greg McCunn, B.A.Sc., P.Eng., who is a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, and also Chief Executive Officer for Noram.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statement Regarding Forward Looking Information
This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements regarding, among other things, plans for ongoing development of the Zeus Lithium Project. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, regulatory approval processes, results of further exploration work, and availability of capital on terms acceptable to the Company. Although Noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable, including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities laws.
SOURCE: Noram Lithium Corp.
View source version on accesswire.com:
https://www.accesswire.com/802823/noram-produces-high-purity-lithium-carbonate-from-zeus-lithium-project-samples
FAQ
What is the purity of the lithium carbonate produced from the Zeus Lithium Project?
Where is the Zeus Lithium Project located?
Who confirmed the metallurgical processing flow sheet for the Project?
What impurities were found in the lithium carbonate produced?