STOCK TITAN

Grid Metals Provides New Drill Results From East Bull Lake and Strengthens Technical Team

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

Grid Metals Corp. has announced promising drilling results from its East Bull Lake palladium property in Ontario. The initial three holes from the winter 2021 program revealed significant palladium equivalent grades, with hole EBL21-01 yielding 54.0 metres at 1.05 g/t Pd Eq. Additionally, Dr. Reid Keays joins as a Senior Technical Advisor, enhancing the technical team. The company plans to conduct over 3,000 metres of drilling, focusing on a geophysical anomaly in the Central Parisien Lake area, with future exploration programs anticipated.

Positive
  • Drilling results show significant palladium equivalent grades: EBL21-01 averaged 1.05 g/t, EBL21-02 averaged 0.94 g/t, EBL21-03 averaged 1.15 g/t.
  • Dr. Reid Keays, an expert in PGE and nickel sulfide deposits, joins as Senior Technical Advisor, strengthening the technical team.
  • Planned completion of over 3,000 metres of drilling to explore potential additional discoveries.
Negative
  • None.

TORONTO, ON / ACCESSWIRE / March 11, 2021 / Grid Metals Corp. (the "Company") (TSX.V:GRDM)(OTCQB:MSMGF) is pleased to announce new drilling results for its first three holes from the Q1 2021 program at its 100% owned East Bull Lake ("EBL") palladium property (the "Property") in Ontario. The Company resumed drilling in January, following up on encouraging drilling results from its fall 2020 campaign. Grid is also pleased to announce Dr. Reid Keays, an internationally renowned expert on PGE and nickel sulfide deposits, has joined Grid Metals as a Senior Technical Advisor.

Highlights

Significant results from the first three holes from the ongoing winter drilling program are:

  • 54.0 metres averaging 1.05 g/t palladium equivalent grade (Pd Eq) in hole EBL21-01 including 3.0 metres of 3.04 g/t Pd Eq
  • 24.0 metres averaging 0.94 g/t Pd Eq in hole EBL21-02 including 2.0 metres of 2.34 g/t Pd Eq
  • 40.3 metres averaging 1.15 g/t Pd Eq in hole EBL21-03 including 2.30 metres of 3.23 g/t Pd Eq

These three holes represent short step outs from discovery hole EBL20-13 (119m of 1.1 g/t Pd Eq) reported last December.

Dr. Dave Peck, the Company's Vice-President of Exploration and Business Development stated "We continue to intersect good widths of palladium mineralization in the Central Parisien Lake target area. We will be assessing all of the new drilling results over the coming weeks and begin making plans for a summer field program and the next phase of exploration drilling on the Property. With over 20 km of prospective strike length to explore, the continued refinement of our exploration methodologies is a critical step toward meeting our ultimate objective of delivering one or more discoveries having the size and grade required for potential extraction."

Update on Drilling Activities

The Company resumed drilling on the Property on January 21 and expects to complete over 3,000 metres in approximately 15 holes before the end of the month. Drilling is focussed on the Central Parisien Lake target area. Results from the first three holes are reported in Table 1, below. Drilling is targeting a >1 km long geophysical anomaly (resistivity low) with favourable geology and historical outcropping palladium mineralization. This is the first area that the company has focussed on since resuming exploration at East Bull Lake in the spring of last year. Several other similar target areas existing on the Property remain to be drilled. Each of these has comparable size, prospective geology, outcropping mineralization styles and geophysical anomalies to those observed in the Central Parisien Lake area.

Table 1. Analytical results for drill holes EBL21-01, 02 and 03 from the Central Parisien Lake target area. See Figure 1 for drill hole locations and Table 2 for drill hole specifications.

Hole ID

From

(m)

To

(m)

Length (m)

Pd

(g/t)

Pt

(g/t)

Au

(g/t)

Cu

(%)

Ni

(%)

Pd Eq

(g/t)

EBL21-01

61.00

115.00

54.00

0.64

0.19

0.04

0.09

0.06

1.05

inc.

61.00

83.00

22.00

0.94

0.27

0.04

0.10

0.06

1.39

and inc.

65.00

68.00

3.00

2.07

0.52

0.11

0.22

0.13

3.04

EBL21-02

77.00

101.00

24.00

0.59

0.17

0.04

0.10

0.04

0.94

inc.

77.00

81.00

4.00

1.09

0.29

0.06

0.08

0.04

1.48

and

95.00

97.00

2.00

1.49

0.40

0.07

0.31

0.08

2.34

EBL21-03

27.70

68.05

40.35

0.59

0.21

0.06

0.18

0.07

1.15

inc.

27.70

30.00

2.30

2.45

0.54

0.12

0.18

0.07

3.23

Notes:

  • Based on current 3D geological interpretations, the true thickness is estimated to range between approximately 50-80% of the length of the reported mineralized intervals.
  • Pd Eq is the palladium equivalent grade expressed in grams per tonne that is calculated using the following long-term consensus price forecasts ($US) sourced from S&P Global Metals and Mining Research and dated October 30, 2020: Pd - $1,813.90/oz; Pt - $955.55/oz; Au - $1,832.01/oz; Cu - $2.96/lb; Ni - $6.87/lb.

Figure 1. Location of holes EBL21-01 to 03 in the Central Parisien Lake target area with respect to a large area of low resistivity, historical drill collars, and additional planned holes from the ongoing exploration drill program at the Company's East Bull Lake property.

Table 2. Drill hole specifications for drill holes EBL21-01 to 03 from the ongoing Q1 2021 drilling program at East Bull Lake. Easting and northing collar coordinates are based on a NAD83 UTM Zone 17 projection.

Hole Number

Easting

(m)

Northing (m)

Elevation (m)

Azimuth

Dip

Length

(m)

EBL21-01

410065

5141920

375

165

65

200

EBL21-02

410094

5141929

380

165

65

200

EBL21-03

410040

5141929

360

350

60

220

Key Addition to Technical Team

The Company is pleased to announce that Dr. Reid Keays, a foremost expert on magmatic PGE and nickel sulfide deposits, has joined its technical team in the role of Senior Technical Advisor. Dr. Keays previously held the positions of Dean of Science and Engineering at Laurentian University and Chairman of the School of Earth Sciences at Melbourne University. He has amassed a truly impressive publication record on global magmatic PGE and Ni sulfide deposits over his illustrious career and remains a very active leader in research in this field. The Company is fortunate to have a person of Dr. Keays' knowledge and talent join its technical team. Dr. Keays will soon commence work on the East Bull Lake project, assessing key geological controls on palladium and base metal grades in this advancing exploration-stage project.

Dr. Keays stated "I am pleased to be joining the Grid Metals technical team and look forward to assisting them in their ongoing search for major magmatic PGE and nickel sulfide deposits in Canada. My previous work with Dave Peck and others on the East Bull Lake intrusive suite together with my four decades of global PGE and nickel deposit research provides me with a solid basis on which to make important technical contributions to the EBL project and to Grid's nickel portfolio."

Quality Assurance and Quality Control

Grid Metals applies best practice quality assurance and quality control ("QAQC") protocols on all of its exploration programs. For the current drilling program, core is logged and sampled at a core facility located in the town of Massey, Ontario - approximately 30 km south of the property. NQ-size drill core samples are cut into halves using a diamond saw. Standard sample intervals of 1.00 metre length are used unless a major geological, structural or mineralization boundary is encountered. Samples are bagged and tagged and transported by courier to, for this news release, the Actlabs Thunder Bay analytical facility. Actlabs analyzes each sample for Pd, Pt and Au using a lead collection fire assay on a 30 g pulp split and an ICP-OES finish. Copper, Ni and Co are analyzed using a ‘near total' fusion multi-acid digestion and an ICP-OES finish. The Company uses two PGE certified reference materials ("CRMs") and one analytical blank purchased from Canadian Resource Laboratories to monitor analytical accuracy and check for cross contamination between samples. One of the CRMs or the blank are inserted every tenth sample within a given batch. The analytical results for the two CRMs and the blank for the sample batches reported here did not show any significant bias compared to the certified values and the results fell within the acceptable limits of variability.

Dr. Dave Peck, P.Geo., has reviewed and approved the technical content of this release for purposes of National Instrument 43-101.

About Grid Metals Corp.
Grid Metals Corp. is an exploration and development Company that has a diversified portfolio of projects in the nickel-copper-platinum group metal sectors. These commodities are vital to the emerging battery metals, energy storage and automotive sectors. All of Grid's projects are located in secure North American mining jurisdictions. The Company is focused on timely advancement of its property portfolio through prudent exploration and development activities.

To find out more about Grid Metals Corp., please visit www.gridmetalscorp.com.

On Behalf of the Board of Grid Metals Corp.
Robin Dunbar
President, CEO & Director
Telephone: 416-955-4773
Email: rd@gridmetalscorp.com

David Black
Investor Relations
Email: info@gridmetalscorp.com

We seek safe harbour.
This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Securities Act (Ontario) (together, "forward-looking statements"). Such forward-looking statements may include the Company's plans for its properties, the overall economic potential of its properties, the availability of adequate financing and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or implied by such forward- looking statements to be materially different. Such factors include, among others, risks and uncertainties relating to potential political risk, uncertainty of production and capital costs estimates and the potential for unexpected costs and expenses, physical risks inherent in mining operations, metallurgical risk, currency fluctuations, fluctuations in the price of nickel, cobalt, copper and other metals, completion of economic evaluations, changes in project parameters as plans continue to be refined, the inability or failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those described in the Company's Management Discussion and Analysis for the most recent financial period and Material Change Reports filed with the Canadian Securities Administrators and available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

This news release does not constitute an offer of securities for sale in the United States. The securities being offered have not been, nor will they be, registered under the United States Securities Act of 1933, as amended, and such securities may not be offered or sold within the United States absent U.S. registration or an applicable exemption from U.S. registration requirements.

SOURCE: Grid Metals Corp.



View source version on accesswire.com:
https://www.accesswire.com/634874/Grid-Metals-Provides-New-Drill-Results-From-East-Bull-Lake-and-Strengthens-Technical-Team

FAQ

What are the recent drilling results for MSMGF from the East Bull Lake property?

The recent drilling results show significant palladium equivalent grades, with EBL21-01 recording 54.0 metres at 1.05 g/t Pd Eq, EBL21-02 at 24.0 metres at 0.94 g/t, and EBL21-03 at 40.3 metres at 1.15 g/t.

Who has joined Grid Metals as Senior Technical Advisor?

Dr. Reid Keays, an expert in PGE and nickel sulfide deposits, has joined Grid Metals as Senior Technical Advisor.

What drilling program is Grid Metals currently undertaking for MSMGF?

Grid Metals is conducting a winter drilling program targeting over 3,000 metres across approximately 15 holes at the Central Parisien Lake area.

What is the significance of the geophysical anomaly in MSMGF’s drilling targets?

The drilling is focused on a geophysical anomaly greater than 1 km long, which shows favorable geology and historical palladium mineralization.

GRID METALS CORP

OTC:MSMGF

MSMGF Rankings

MSMGF Latest News

MSMGF Stock Data

6.11M
173.31M
15.05%
22.03%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Toronto