Lithium South Expands Production Goals with Updated PEA and Strategic Team Addition
- Lithium South Development Corporation has selected Knight Piésold Consulting and JDS Energy & Mining to prepare an updated National Instrument 43-101 Preliminary Economic Assessment (PEA) on its Hombre Muerto North Lithium Project in Argentina. The report will consider the upgraded resource of 1.58 million tonnes Lithium Carbonate Equivalent (LCE) and current market conditions. The Company aims to optimize lithium recovery from 50% to approximately 70%.
- None.
The Company has selected low risk, industry proven conventional evaporation as the means of lithium recovery. To optimize this process, the Company is pleased to announce it has retained Mr. Peter Ehren, MSc. of Raw Materials Technology as the primary engineer for Process Optimization and as a Qualified Person (QP) for the PEA and NI 43-101 Technical Report. Mr. Ehren has extensive experience with lithium projects across world, especially in
KP will provide the engineering design, cost estimation, infrastructure, and logistics for the PEA. KP is a global consulting firm that provides specialized services to the mining, power, water resources, infrastructure industries. The company focuses on creating value at every stage of a project through quality driven, sustainable, and cost-effective solutions. Established in
JDS is providing the study management and economic analysis for the project. JDS is an engineering, project, and construction management firm composed of a diverse set of skilled and highly experienced mining and construction professionals. With a proven record of providing clients with fit-for-purpose solutions and value delivery, JDS has acquired a reputation for delivering and executing project plans on budget, on time, and most importantly, safely. The JDS team prides itself on delivering project concepts from inception to full operations, providing clients with technical engineering support, onsite operations services and EPCM.
About Lithium South
Lithium South (LIS) owns
Mr. William Feyerabend, CPG, a Consulting Geologist and Qualified Person under NI 43-101 contributed to the production of this press release and approves of the technical and scientific information contained herein.
On behalf of the Board of Directors
Adrian F. C. Hobkirk
President and Chief Executive Officer
Investors / Shareholders call 1-855-415-8100 / website: www.lithiumsouth.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange has not reviewed the content of this news release and therefore does not accept responsibility or liability for the adequacy or accuracy of the contents of this news release.
This news release contains certain "forward-looking statements" within the meaning of Section 21E of the United States Securities and Exchange Act of 1934, as amended. Except for statements of historical fact relating to the Company, certain information contained herein constitute forward-looking statements. Forward-looking statements are based upon opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors which could cause actual results to differ materially from those projected in the forward-looking statements. The reader is cautioned not to place undue reliance on forward- looking statements. We seek safe harbor.
Logo - https://mma.prnewswire.com/media/1815015/Lithium_South_Development_Corporation_Logo_Logo.jpg
View original content:https://www.prnewswire.com/news-releases/lithium-south-expands-production-goals-with-updated-pea-and-strategic-team-addition-301960261.html
SOURCE Lithium South Development Corporation
FAQ
Who will prepare the updated National Instrument 43-101 Preliminary Economic Assessment?
Where is the Hombre Muerto North Lithium Project located?