LIFT Intersects 79 Metres at 1.13% Li2O and 39 Metres at 1.43% Li2O at the Fi Southwest Pegmatite, Yellowknife Lithium Project, NWT, Canada
Vancouver, British Columbia--(Newsfile Corp. - July 25, 2023) - Li-FT Power Ltd. (CSE: LIFT) (OTC Pink: LIFFF) (FSE: WS0) ("LIFT" or the "Company") is pleased to report that initial assays from the first five drill holes completed at the Fi Southwest pegmatite within the Yellowknife Lithium Project ("YLP") located outside the city of Yellowknife, Northwest Territories. Drill results have confirmed spodumene mineralization over 320m of strike length, to a depth of approximately 150m from surface at the Fi Southwest dyke which remains open in all directions. Drilling is ongoing on the remainder of the dyke, which is currently testing a total of 1,100 metres of strike-length to a depth of 250 metres.
Highlights:
Hole | From (m)1 | To (m) | Interval (m)2 | Li2O (%)3 |
YLP0001 | 73 | 108 | 35 | 1.30 |
inc. | 75 | 102 | 27 | 1.58 |
YLP0002 | 180 | 214 | 34 | 0.34 |
YLP0003 | 55 | 94 | 39 | 1.43 |
inc. | 57 | 92 | 35 | 1.57 |
YLP0004 | 55 | 88 | 33 | 1.39 |
inc. | 56 | 85 | 29 | 1.55 |
YLP00054 | 52 | 131 | 79 | 1.13 |
inc. | 73 | 129 | 56 | 1.42 |
1 From, to, and interval lengths in metres, as measured down core axis, not true width.
2 Individual sample lengths = 1 metre.
3 Lithium assays performed by ALS Global on saw cut half HQ core using method ME- ICP82b; results reported in Li%, converted to Li2O by multiplying by 2.154.
4 Drilled down-dip due to access restriction.
Francis MacDonald, CEO of LIFT comments, "We are very encouraged with these first drill results at the Yellowknife Lithium Project. The widths and grades of lithium and spodumene intersected in these holes are similar to what was historically reported in the 1950s to 1980s1. 8 different pegmatites will be drilled this summer with 45,000 metres of drilling that will utilize six drill rigs. We look forward to reporting additional results in the coming weeks and month. We believe that these initial drill results show that the YLP has excellent potential to become one of the next destinations in North America to define significant spodumene resources."
Figure 1 - Location of LIFT's Yellowknife Lithium Project. Drilling will focus on the Road Access Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway. The Fi Southwest pegmatite is located within the Fi mineral lease.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_001full.jpg
Discussion of Drill Results
Holes YLP0001 to YLP0005 were targeting the Fi Southwest dyke and have confirmed spodumene mineralization over 320 metres of strike length, to a depth of approximately 150 metres from surface. Drilling targeted extensions to depth below surface exposures of 5
Figure 2 - Plan view showing the surface expression of the Fi Southwest pegmatite with diamond drill holes reported in this press release.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_002full.jpg
Operations Update
LIFT is pleased to report that the Company has completed construction of a 49-person camp around the Hidden Lake area which is proximal to the Fi, Shorty, and Ki mineral leases. With increased camp capacity the Company is currently drilling with three diamond drill rigs out of the Hidden Lake camp and is drilling pegmatite targets on the Fi Southwest, Fi Main, Shorty, Ki, and Ki extension on to the Perlis lease. Two drills have been deployed to the Big East pegmatite and are currently drilling this target. One additional drill rig will start drilling in August at the Echo target bringing the total drill rig count to six. To date, 9,246 meters of drilling have been completed over 56 drill holes.
Figure 3 - Cross-section of YLP0004 which intersected 33 meters at
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_003full.jpg
Figure 4 - Cross-section of YLP0005 which intersected 79 metres at
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_004full.jpg
Figure 5 - Down-dip view of the current geological model of the Fi Southwest pegmatite.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_005full.jpg
Table 2 - Drill collars table of reported drill holes
Hole No. | Northing1 | Easting1 | Elevation (m) | Length (m) | Azimuth | Dip |
YLP0001 | 6,940,700 | 371,267 | 250 | 228 | 302 | 45 |
YLP0002 | 6,940,695 | 371,371 | 250 | 131 | 300 | 50 |
YLP0003 | 6,940,748 | 371,285 | 250 | 110 | 300 | 45 |
YLP0004 | 6,940,836 | 371,351 | 248 | 102 | 315 | 45 |
YLP0005 | 6,940,628 | 371,073 | 248 | 150 | 110 | 45 |
1UTM NAD83 zone 12
QA/QC and Core Sampling Protocols
All drill core samples were collected under the supervision of LIFT employees and contractors. Drill core was transported from the drill platform to the logging facility where it was logged, photographed, and split by diamond saw prior to being sampled. Samples were then bagged, and blanks and certified reference materials were inserted at regular intervals. Field duplicates consisting of quarter-cut core samples were also included in the sample runs. Groups of samples were placed in large bags, sealed with numbered tags in order to maintain a chain-of-custody, and transported from LIFT's core logging facility to ALS Labs ("ALS") laboratory in Yellowknife, Northwest Territories.
Sample preparation and analytical work for this drill program were carried out by ALS. Samples were prepared for analysis according to ALS method CRU31: individual samples were crushed to
References
1NI 43-101 Technical Report On the Yellowknife Lithium Project, Northwest Territories, Canada (December 30, 2022) - Thomas Hawkins, PhD, P.Geo. Filed on SEDAR on January 13, 2023
Qualified Person
The disclosure in this news release of scientific and technical information regarding LIFT's mineral properties has been reviewed and approved by Carl Verley, P.Geo., Vice-President, Exploration of Li-FT Power and a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101). No QA/QC review is available in relation to historical sampling and drilling on the Yellowknife project and results have not been verified by a qualified person as defined by NI 43-101. Past sampling and drilling results are not necessarily indicative of future results or performance from the Yellowknife property.
About LIFT
LIFT is a mineral exploration company engaged in the acquisition, exploration, and development of lithium pegmatite projects located in Canada. The Company's flagship project is the Yellowknife Lithium Project located in Northwest Territories, Canada. LIFT also holds three early-stage exploration properties in Quebec, Canada with excellent potential for the discovery of buried lithium pegmatites, as well as the Cali Project in Northwest Territories within the Little Nahanni Pegmatite Field.
For further information, please contact:
Francis MacDonald
Chief Executive Officer
Tel: + 1.604.609.6185
Email: info@li-ft.com
Website: www.li-ft.com
Cautionary Statement Regarding Forward-Looking Information
Certain statements included in this press release constitute forward-looking information or statements (collectively, "forward-looking statements"), including those identified by the expressions "anticipate", "believe", "plan", "estimate", "expect", "intend", "may", "should" and similar expressions to the extent they relate to the Company or its management. The forward-looking statements are not historical facts but reflect current expectations regarding future results or events. This press release contains forward-looking statements. These forward-looking statements are based on current expectations and various estimates, factors and assumptions and involve known and unknown risks, uncertainties and other factors.
Forward-looking statements are not a guarantee of future performance and involve risks, uncertainties and assumptions which are difficult to predict. Factors that could cause the actual results to differ materially from those in forward-looking statements include the continued availability of capital and financing, and general economic, market or business conditions, including the effects of COVID-19. Forward-looking statements contained in this press release are expressly qualified by this cautionary statement. These statements should not be read as guarantees of future performance or results. Such statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from those implied by such statements. Although such statements are based on management's reasonable assumptions, there can be no assurance that the statements will prove to be accurate or that management's expectations or estimates of future developments, circumstances or results will materialize. The Company assumes no responsibility to update or revise forward-looking information to reflect new events or circumstances unless required by law. Readers should not place undue reliance on the Company's forward-looking statements.
Neither the Canadian Securities Exchange (the "CSE") nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/174718