STOCK TITAN

Jaguar Mining Reports Fourth Quarter and Full Year 2023 Production Results and Provides Outlook for 2024

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary
Jaguar Mining Inc. reports a 6.7% increase in fourth quarter production compared to the previous quarter, with 18,481 ounces of gold produced. However, the annual consolidated gold production for 2023 decreased to 70,702 ounces compared to 80,968 ounces in 2022. The Company's cash position as of December 31, 2023, was $22.3 million, showing an increase from the previous quarter. The reduction in diamond drilling year-over-year was due to reduced contracted diamond drill meters and prudent cash management. The Company expects production levels at Turmalina and Pilar to remain consistent in 2024, with Faina contributing to production in the second half of the year.
Positive
  • 6.7% increase in fourth quarter production compared to the previous quarter
  • Cash position as of December 31, 2023, was $22.3 million
  • Expectation of consistent production levels at Turmalina and Pilar in 2024
  • Faina expected to contribute to production in the second half of 2024
Negative
  • Annual consolidated gold production for 2023 decreased to 70,702 ounces compared to 80,968 ounces in 2022
  • Reduction in diamond drilling year-over-year due to reduced contracted diamond drill meters

TORONTO, ON / ACCESSWIRE / January 16, 2024 / Jaguar Mining Inc. ("Jaguar" or the "Company") (TSX:JAG)(OTCQX:JAGGF) today announced preliminary production results for the fourth quarter and full year 2023. Full financial results for the quarter and full year will be reported and filed on SEDAR+ on or before March 28, 2024. All figures are in US Dollars, unless otherwise expressed.

Fourth Quarter and Full Year 2023 Operating Highlights

  • Fourth quarter production increased 6.7% over the previous quarter continuing the positive trend of increasing production established in the third quarter, as modifications to mining methods and an emphasis on efficient operation continued to take effect.
  • Fourth quarter consolidated gold production was 18,481 ounces, compared to 17,316 ounces produced in the third quarter, and 21,116 ounces produced in the fourth quarter of 2022. Annual consolidated gold production for 2023 was 70,702 ounces compared to 2022 production of 80,968 ounces.
  • Fourth quarter consolidated tonnage processed was 195,595 tonnes at 3.35 grams per tonne (g/t) compared to 209,000 tonnes at 3.61 g/t in the fourth quarter of 2022. Annual consolidated tonnage processed was 812,954 tonnes at 3.09 g/t, compared to 837,000 tonnes at 3.43 grams g/t in 2022.
  • In the fourth quarter, the Company completed primary development of 1,123 metres, secondary development of 1,157 meters, and exploration development of 513 metres; totalling 2,793 metres compared to the fourth quarter of 2022 where development totalled 3,103 metres. For the full year 2023, development completed was 4,959 metres of primary, 5,219 metres of secondary, and 1,655 metres of exploration for a total of 11,833 metres, compared to the full year 2022 total development of 11,570 metres. These development rates provide sustainable progress on the ramp, ore development, as well as exploration drives.
  • Diamond drilling completed during the fourth quarter was 10,271 metres compared to the fourth quarter of 2022 drilling of 11,570 metres. Diamond drilling completed in 2023 was 44,843 metres compared to 88,150 metres drilled in 2022. The reduction in drilling year-over-year was the result of reduced contracted diamond drill meters, as several major drilling programs (including Faina surface drilling) were finished, and prudent cash management resulted in the Company minimizing then eliminating underground contractor diamond drilling.
  • The Company's cash position as at December 31, 2023 was $22.3 million compared to cash of $20.0 million as at September 30, 2023. During the fourth quarter, the Company benefitted from higher realized gold prices which was the main driver of the increase in cash.

Quarterly Summary

Q4 2023

Q4 2022

Turmalina

Pilar

Total

Turmalina

Pilar

Total

Tonnes milled (t)

99,293

96,302

195,595

101,000

108,000

209,000

Average head grade (g/t)

3.02

3.68

3.34

3.50

3.71

3.61

Recovery (%)

88

88

88

86

88

87

Gold ounces
Produced (oz)

8,457

10,025

18,482

9,803

11,313

21,116

Sold (oz)

8,455

9,643

18,098

9,269

11,671

20,940

Development
Primary (m)

697

426

1,123

642

341

983

Secondary (m)

558

599

1,157

833

705

1,538

Exploration Development (m)

513

-

513

374

208

582

Definition, infill and exploration drilling (m)

6,063

4,208

10,271

6,061

5,509

11,570

Annual Summary

2023

2022

Turmalina

Pilar

Total

Turmalina

Pilar

Total

Tonnes milled (t)

408,378

404,576

812,954

383,000

444,000

827,000

Average head grade (g/t)

2.92

3.27

3.09

3.28

3.57

3.44

Recovery (%)

86

88

87

87

88

88

Gold ounces
Produced (oz)

33,117

37,585

70,702

36,166

44,802

80,968

Sold (oz)

33,449

37,017

70,466

35,852

44,197

80,049

Development
Primary (m)

3,122

1,837

4,959

2,309

1,350

3,659

Secondary (m)

2,615

2,604

5,219

3,009

2,254

5,263

Exploration Development (m)

1,655

-

1,655

1,510

1,138

2,648

Definition, infill and exploration drilling (m)

22,963

21,880

44,843

53,971

34,179

88,150

Vern Baker, President and CEO of Jaguar, stated: "I am pleased to report our fourth quarter and full year production results for 2023. With almost 18,500 ounces produced in the quarter, we are seeing the benefits from adjustments and work that started earlier in the year. Increases in production over the last two quarters and a higher realized gold price in the fourth quarter resulted in a strong year end cash position of over $22 million.

In 2023, we funded the continued development to access the Faina Resource. That focus on the development of Faina will continue in 2024 as both infrastructure and ore development will continue throughout the year. Our first stoping at Faina is expected to occur in the second half of the year and ounce production will begin increasing at that point. We are confident in our ability to continue current production levels and to generate cash while we develop Faina and expect to see production increases beginning in the second half of the year."

2024 Outlook

In 2024, the Company expects production levels at Turmalina and Pilar to be consistent with the fourth quarter of 2023. It is expected that Faina will contribute to production in the second half of the year, resulting in an increase in overall production from 2023 levels. All-in costs are expected to improve throughout 2024, with higher production in the second half pushing unit costs per ounce down. The Company expects to provide more formal guidance once it has further visibility on the timing and ramp-up of production at Faina.

Qualified Person

Scientific and technical information contained in this press release has been reviewed and approved by Jonathan Victor Hill, BSc (Hons) (Economic Geology - UCT), FAUSIMM, Vice President Geology and Exploration, who is also an employee of Jaguar Mining Inc., and is a "qualified person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

The Iron Quadrangle

The Iron Quadrangle has been an area of mineral exploration dating back to the 16th century. The discovery in 1699-1701 of gold contaminated with iron and platinum-group metals in the southeastern corner of the Iron Quadrangle gave rise to the name of the town Ouro Preto (Black Gold). The Iron Quadrangle contains world-class multi-million-ounce gold deposits such as Morro Velho, Cuiabá, and São Bento. Jaguar holds the third largest gold land position in the Iron Quadrangle with over 50,000 hectares.

About Jaguar Mining Inc.

Jaguar Mining Inc. is a Canadian-listed junior gold mining, development, and exploration company operating in Brazil with three gold mining complexes and a large land package with significant upside exploration potential from mineral claims. The Company's principal operating assets are located in the Iron Quadrangle, a prolific greenstone belt in the state of Minas Gerais and include the Turmalina Gold Mine Complex and Caeté Mining Complex (Pilar and Roça Grande Mines, and Caeté Plant). The Company also owns the Paciência Gold Mine Complex, which has been on care and maintenance since 2012. The Roça Grande Mine has been on temporary care and maintenance since April 2019. Additional information is available on the Company's website at www.jaguarmining.com.

For further information please contact:

Vernon Baker
Chief Executive Officer
Jaguar Mining Inc.
vernon.baker@jaguarmining.com
416-847-1854

Alfred Colas
Chief Financial Officer
Jaguar Mining Inc.
alfred.colas@jaguarmining.com
416-847-1854

Forward-Looking Statements

Certain statements in this news release constitute "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking statements and information are provided for the purpose of providing information about management's expectations and plans relating to the future. All of the forward-looking information made in this news release is qualified by the cautionary statements below and those made in our other filings with the securities regulators in Canada. Forward-looking information contained in forward-looking statements can be identified by the use of words such as "are expected," "is forecast," "is targeted," "approximately," "plans," "anticipates," "projects," "anticipates," "continue," "estimate," "believe" or variations of such words and phrases or statements that certain actions, events or results "may," "could," "would," "might," or "will" be taken, occur or be achieved. All statements, other than statements of historical fact, may be considered to be or include forward-looking information. This news release contains forward-looking information regarding, among other things, the anticipated impact of planned changes in mining systems and cost cutting initiatives on the Company's future performance and production results, information related to expected sales, production statistics, ore grades, tonnes milled, recovery rates, cash operating costs, definition/delineation drilling, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of projects and new deposits, success of exploration, development and mining activities, currency fluctuations, capital requirements, project studies, mine life extensions, restarting suspended or disrupted operations, continuous improvement initiatives, and resolution of pending litigation. The Company has made numerous assumptions with respect to forward-looking information contained herein, including, among other things, assumptions about the estimated timeline for the development of its mineral properties; the supply and demand for, and the level and volatility of the price of, gold; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted communities; political and legal developments in any jurisdiction in which the Company operates being consistent with its current expectations including, without limitation, the impact of any potential power rationing, tailings facility regulation, exploration and mine operating licenses and permits being obtained and renewed and/or there being adverse amendments to mining or other laws in Brazil and any changes to general business and economic conditions. Forward-looking information involves a number of known and unknown risks and uncertainties, including among others: the risk of Jaguar not meeting the forecast plans regarding its operations and financial performance; uncertainties with respect to the price of gold, labour disruptions, mechanical failures, increase in costs, environmental compliance and change in environmental legislation and regulation, weather delays and increased costs or production delays due to natural disasters, power disruptions, procurement and delivery of parts and supplies to the operations; uncertainties inherent to capital markets in general (including the sometimes volatile valuation of securities and an uncertain ability to raise new capital) and other risks inherent to the gold exploration, development and production industry, which, if incorrect, may cause actual results to differ materially from those anticipated by the Company and described herein. In addition, there are risks and hazards associated with the business of gold exploration, development, mining and production, including environmental hazards, tailings dam failures, industrial accidents and workplace safety problems, unusual or unexpected geological formations, pressures, cave-ins, flooding, chemical spills, procurement fraud and gold bullion thefts and losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Accordingly, readers should not place undue reliance on forward-looking information.

For additional information with respect to these and other factors and assumptions underlying the forward-looking information made in this news release, see the Company's most recent Annual Information Form and Management's Discussion and Analysis, as well as other public disclosure documents that can be accessed under the issuer profile of "Jaguar Mining Inc." on SEDAR+ at www.sedarplus.com. The forward-looking information set forth herein reflects the Company's reasonable expectations as at the date of this news release and is subject to change after such date. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law. The forward-looking information contained in this news release is expressly qualified by this cautionary statement.

SOURCE: Jaguar Mining Inc.



View the original press release on accesswire.com

FAQ

What was Jaguar Mining Inc.'s fourth quarter production increase compared to the previous quarter?

Jaguar Mining Inc. reported a 6.7% increase in fourth quarter production compared to the previous quarter.

What was the annual consolidated gold production for 2023?

The annual consolidated gold production for 2023 decreased to 70,702 ounces compared to 80,968 ounces in 2022.

What was the Company's cash position as of December 31, 2023?

The Company's cash position as of December 31, 2023, was $22.3 million.

What is the outlook for production levels at Turmalina and Pilar in 2024?

The Company expects production levels at Turmalina and Pilar to remain consistent in 2024.

What is the expectation for Faina's contribution to production in 2024?

Faina is expected to contribute to production in the second half of 2024.

JAGUAR MINING INC

OTC:JAGGF

JAGGF Rankings

JAGGF Latest News

JAGGF Stock Data

206.43M
36.74M
55%
9.58%
8.43%
Gold
Basic Materials
Link
United States of America
Toronto