STOCK TITAN

GSE Solutions to Upgrade Olkiluoto Nuclear Power Plant Simulators

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

GSE Solutions (Nasdaq: GVP) has been awarded a contract to upgrade the OL1 and OL2 training simulators at the Olkiluoto Nuclear Power Plant in Finland. This project, set to be completed by August 2025, includes replacing the existing reactor thermohydraulic model with GSE's latest RELAP 5-HD solution and upgrading the plant containment building model. GSE's simulators are recognized for enhancing training scenarios, promoting safety, and optimizing operations in nuclear power. With over 50 years of expertise, GSE Solutions aims to support the clean-energy initiatives crucial for the power industry.

Positive
  • Contract awarded to upgrade OL1 and OL2 simulators at Olkiluoto Nuclear Power Plant, enhancing training capabilities.
  • Upgrade includes advanced simulation technology, improving operator training and plant safety.
Negative
  • None.

COLUMBIA, Md., March 15, 2023 /PRNewswire/ -- GSE Solutions ("GSE Systems, Inc." or "GSE") (Nasdaq: GVP), a leader in advanced engineering and workforce solutions that supports the future of clean-energy production and decarbonization initiatives of the power industry, announced today that they were selected to upgrade the OL1 and OL2 training simulators at Olkiluoto Nuclear Power Plant, located in Eurajoki, Finland.

The Olkiluoto Nuclear Power Plant is owned by Finnish nuclear power company Teollisuuden Voima Oyj [TVO]. It is widely recognized for its record of safe operations, high availability, and decades of environmentally friendly electricity generation. GSE built the original OL1 and OL2 simulators in the 1980's. Since then, GSE has continued to service and upgrade the simulators at various delivery points. This contract will be fulfilled in two stages between now and August 2025 and will include the following:

  • An upgrade to the plant containment building model with a new JTopmeretTM based model for the OL1 and OL2 training simulators
  • A replacement of the existing Theatre-based reactor thermohydraulic model with GSE's latest RELAP 5-HD solution

These upgrades will enhance the operator's experience, taking advantage of the latest advances in simulation technology to provide even more realism to the training sessions and see phenomena not previously available with the legacy systems.

"GSE simulators are used in power generation plants worldwide to create training scenarios around real events and unique operating conditions. It's a privilege to continue to work with customers year-after-year to help improve training development," said Kyle Loudermilk, President, and CEO, GSE Solutions. "These latest updates will continue to help TVO achieve their goal of safe, reliable, and optimal operations well into the future."  

ABOUT GSE SOLUTIONS
Proven by more than 50 years of experience in the nuclear power industry, GSE knows what it takes to help customers deliver carbon-free electricity safely and reliably. Today, GSE Solutions leverages top talent, expertise, and technology to help energy facilities achieve next-level power plant performance. GSE's advanced Engineering and Workforce Solutions divisions offer highly specialized training, engineering design, program compliance, simulation, and technical staffing that reduce risk and optimize plant operations. With more than 1,100 installations and hundreds of customers in over 50 countries, GSE delivers operational excellence. www.gses.com

Media Contact
Sunny DeMattio
GSE Solutions
Director of Marketing & Communications
sunny.demattio@gses.com
Direct: +1 410.970.7931

Investor Contact
Adam Lowensteiner
Vice President
Lytham Partners
gvp@lythampartners.com
Direct: +1 646.829.9702

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/gse-solutions-to-upgrade-olkiluoto-nuclear-power-plant-simulators-301772513.html

SOURCE GSE Systems, Inc.

FAQ

What is the significance of GSE Solutions' contract with Olkiluoto Nuclear Power Plant?

The contract involves upgrading training simulators, enhancing operator training and safety at the plant.

When will GSE Solutions complete the upgrades at Olkiluoto Nuclear Power Plant?

The upgrades are scheduled to be completed by August 2025.

What technology is GSE Solutions implementing in the simulator upgrades?

GSE is replacing the existing thermohydraulic model with the RELAP 5-HD solution and upgrading the containment building model.

What is the stock symbol for GSE Solutions?

The stock symbol for GSE Solutions is GVP.

GSE Systems, Inc.

NASDAQ:GVP

GVP Rankings

GVP Latest News

GVP Stock Data

16.04M
2.77M
19.58%
12.81%
1.05%
Software - Application
Services-prepackaged Software
Link
United States of America
COLUMBIA