Compañia de Minas Buenaventura S.A.A. (NYSE: BVN) announced its 4Q22 production results, showing a total gold output of 17,535 ounces from Orcopampa, Tambomayo, La Zanja, Coimolache, and El Brocal. For FY22, the annual gold production reached 74,478 ounces. Silver production totaled 877,768 ounces in 4Q22, contributing to an overall FY22 silver output of 3,556,829 ounces. The company provided guidance for 2023, projecting gold production to range between 72,000 to 80,000 ounces and silver output to be between 2.7 million to 3 million ounces, reflecting a robust outlook amid steady operational performance.
- Gold production guidance for 2023 is set at 72k - 80k ounces, indicating growth potential.
- Silver production guidance for 2023 is 2.7M - 3.0M ounces, suggesting strong silver output capabilities.
- 4Q22 gold production decreased compared to prior quarters, raising concerns about operational efficiency.
- No silver production reported from Uchucchacua and Yumpag, indicating potential operational challenges.
4Q22 and FY22 Production per Metal ( |
||||||||
1Q22 (Actual) |
2Q22 (Actual) |
3Q22 (Actual) |
4Q22 (Actual) |
FY22 (Actual) |
2023 Guidance (1)(2)(3) | |||
Gold (Oz.) | ||||||||
Orcopampa | 19,031 |
17,749 |
20,164 |
17,535 |
74,478 |
|
|
72k - 80k |
Tambomayo | 13,867 |
14,351 |
13,755 |
12,348 |
54,320 |
|
|
35k - 40k |
La Zanja | 5,900 |
4,767 |
8,786 |
10,163 |
29,616 |
|
|
- |
Coimolache | 19,512 |
19,930 |
21,899 |
21,067 |
82,408 |
|
|
60k - 65k |
El Brocal | 4,350 |
4,457 |
7,085 |
7,467 |
23,359 |
|
|
24k - 26k |
|
|
|
|
|
|
|
|
|
Silver (Oz.) |
|
|
|
|
|
|
|
|
Uchucchacua | 0 |
0 |
0 |
0 |
0 |
|
|
0.7M - 1.0M |
Yumpag | 0 |
0 |
0 |
0 |
0 |
|
|
1.6M - 1.8M |
El Brocal | 1,059,666 |
806,123 |
813,272 |
877,768 |
3,556,829 |
|
|
2.7M - 3.0M |
Tambomayo | 419,396 |
433,820 |
546,256 |
463,938 |
1,863,411 |
|
|
1.9M - 2.2M |
Julcani | 661,132 |
640,557 |
692,876 |
646,125 |
2,640,689 |
|
|
2.6M - 2.8M |
|
|
|
|
|
|
|
|
|
Lead (MT) |
|
|
|
|
|
|
|
|
El Brocal | 2,497 |
1,306 |
1,781 |
1,207 |
6,791 |
|
|
7.5k - 8.3k |
Uchucchacua | 0 |
0 |
0 |
0 |
0 |
|
|
1.4k - 1.5k |
Yumpag | 0 |
0 |
0 |
0 |
0 |
|
|
0.3k - 0.4k |
Tambomayo | 2,509 |
2,823 |
2,639 |
2,320 |
10,290 |
|
|
2.9k - 3.2k |
|
|
|
|
|
|
|
|
|
Zinc (MT) |
|
|
|
|
|
|
|
|
El Brocal | 8,772 |
4,146 |
6,403 |
4,037 |
23,359 |
|
|
23.0k - 25.0k |
Uchucchacua | 0 |
0 |
0 |
0 |
0 |
|
|
2.0k - 2.2k |
Yumpag | 0 |
0 |
0 |
0 |
0 |
|
|
- |
Tambomayo | 3,543 |
3,920 |
3,446 |
2,601 |
13,511 |
|
|
4.8k - 5.3k |
|
|
|
|
|
|
|
|
|
Copper (MT) |
|
|
|
|
|
|
|
|
El Brocal | 10,159 |
10,537 |
12,108 |
14,548 |
47,352 |
|
|
45.0k - 50.0k |
-
2023 outlook projections shown above are considered forward-looking statements and represent management’s good faith estimates or expectations of future production results as of
February 2023 . - 2023 Guidance for Uchucchacua and Yumpag is subject of permit approval to begin production.
- During the 1Q23 El Brocal will be stockpiling ore mined from the open pit. Lead and Zinc ore will be treated at the processing plant since 2Q23. The underground mine will operate continuously throughout 2023.
4Q22 and 2023 Guidance Comments
Tambomayo:
- 2022 gold, silver, lead and zinc production were in line with Buenaventura’s revised 2022 guidance announced in the third quarter 2022.
-
2023 Guidance: the Company expects a year on year decrease in gold production due to the planned mining sequence which entails mining narrower veins. This will result in a
20% decrease in annual throughput as well as lower gold, lead and zinc grades.
Orcopampa:
- 2022 gold production was in line with Buenaventura’s revised 2022 guidance.
- 2023 Guidance: gold production is expected to exceed 2022 production due to an anticipated increase in 2023 throughput.
Coimolache:
- 2022 gold production was in line with Buenaventura’s revised guidance.
- 2023 Guidance: the Company expects a decrease in 2023 gold production due to leach pad capacity limitations resulting from leach pad expansion permitting delays.
La Zanja:
- 2022 gold production was below revised guidance due to the re-assessment of economics for the Phase V-Pampa Verde open pit. Mining at Phase V-Pampa Verde was postponed due to inflation-related OpEx increases and to enable early access for exploring the sulfides potential below the pit.
- Mining activities at the Pampa Verde pit will be paused during 2023 to focus on exploration. However, leaching will continue at La Zanja’s San Pedro pad to the extent that this remains profitable.
Julcani:
- 2022 silver production was in line with revised 2022 guidance.
- 2023 Guidance: 2023 silver production is expected to be consistent with that of prior years.
Yumpag:
- Yumpag project construction and permitting will continue according to schedule.
- 2023 Guidance: Production is subject of permit approval, which is expected to be granted during 3Q23 and assumes initial production beginning in 4Q23.
Uchucchacua:
- Exploration and mine development at the Uchucchacua mine will continue as planned. The 2H23 target to resume ore beneficiation at Uchucchacua’s processing plant remains unchanged.
- 2023 Guidance: Production will resume ramp-up during 4Q23.
El Brocal:
- 2022 gold, silver and copper production exceeded Buenaventura’s revised 2022 guidance.
- 2022 lead and zinc production were in line with revised guidance.
-
Buenaventura has recorded a
US write-off within its 4Q 2022 results related to inventories associated with low grade polymetallic mineral stocks from its Tajo Norte open pit. This represents a one-time accounting effect and does not represent a cash outflow. This has been recorded within the company’s 4Q 2022 results as related metallurgical tests were completed from June to$16.4M November 2022 and concluded that the inventory’s sulfides ore has oxidized, adversely affecting its metallurgical performance and therefore its value. -
2023 Guidance: copper, gold, zinc and lead production is expected to be in line with that of 2022 production while silver production is expected to decrease by
20% :- The Marcapunta underground mine is progressing according to plan and is expected to reach 9,000 tpd by the end of 2023 with sustained stable copper and gold production and strong economic margins. A portion of the surplus underground mine production will be processed at El Brocal’s Plant #2 which is equipped to process copper ore but had previously focused primarily on processing polymetallic ore from the open pit.
- Silver production is expected to decrease due to reduced production from the Tajo Norte open pit as tailings dam capacity is prioritized for higher-margin ore derived from the Marcapunta underground mine. Permitting delays and a renewed mine strategy for the Tajo Norte open pit will also temporarily reduce 2023 throughput.
4Q22 and FY22 Payable Volume Sold
4Q22 and FY22 Volume Sold per Metal ( |
|||||
1Q22 (Actual) |
2Q22 (Actual) |
3Q22 (Actual) |
4Q22 (Actual) |
FY22 (Actual) |
|
Gold (Oz.) | |||||
Orcopampa | 19,307 |
17,719 |
19,814 |
17,514 |
74,354 |
Tambomayo | 12,181 |
12,917 |
12,150 |
10,999 |
48,247 |
La Zanja | 5,773 |
4,452 |
8,575 |
10,576 |
29,376 |
Coimolache | 20,586 |
20,551 |
21,431 |
23,442 |
86,010 |
El Brocal | 2,907 |
2,590 |
5,229 |
5,492 |
16,217 |
|
|
|
|
|
|
Silver (Oz.) |
|
|
|
|
|
Uchucchacua | 18,730 |
139,688 |
150,426 |
152,471 |
461,315 |
El Brocal | 852,933 |
650,260 |
642,558 |
712,041 |
2,857,792 |
Tambomayo | 351,077 |
376,313 |
468,076 |
402,538 |
1,598,004 |
Julcani | 636,303 |
605,634 |
651,077 |
605,128 |
2,498,142 |
|
|
|
|
|
|
Lead (MT) |
|
|
|
|
|
El Brocal | 2,239 |
1,071 |
1,568 |
1,036 |
5,914 |
Uchucchacua | 0 |
18 |
0 |
0 |
18 |
Tambomayo | 2,275 |
2,629 |
2,449 |
2,126 |
9,479 |
|
|
|
|
|
|
Zinc (MT) |
|
|
|
|
|
El Brocal | 7,256 |
3,370 |
5,229 |
3,311 |
19,166 |
Uchucchacua | 0 |
0 |
0 |
0 |
0 |
Tambomayo | 2,922 |
3,262 |
2,832 |
2,038 |
11,054 |
|
|
|
|
|
|
Copper (MT) |
|
|
|
|
|
El Brocal | 9,697 |
10,311 |
11,431 |
13,772 |
45,211 |
Realized Metal Prices* | |||||
1Q22 (Actual) |
2Q22 (Actual) |
3Q22 (Actual) |
4Q22 (Actual) |
FY22 (Actual) |
|
Gold (Oz) | 1,896 |
1,825 |
1,678 |
1,747 |
1,781 |
24.10 |
22.71 |
17.33 |
19.62 |
20.89 |
|
Lead (MT) | 2,363 |
2,180 |
1,713 |
2,037 |
2,082 |
Zinc (MT) | 4,105 |
4,489 |
3,412 |
1,575 |
3,557 |
Copper (MT) | 9,950 |
9,073 |
7,261 |
6,804 |
8,113 |
*Buenaventura consolidated figures. |
Appendix
1. 4Q22 and FY22 Production per Metal ( |
||||||
1Q22 (Actual) |
2Q22 (Actual) |
3Q22 (Actual) |
4Q22 (Actual) |
FY22 (Actual) |
||
Silver (Oz.) | ||||||
Orcopampa | 7,856 |
7,334 |
8,247 |
8,687 |
32,124 |
|
La Zanja | 23,363 |
30,318 |
31,665 |
20,088 |
105,435 |
|
Coimolache | 77,195 |
75,504 |
76,133 |
68,135 |
296,968 |
|
|
|
|
|
|
||
Lead (MT) |
|
|
|
|
|
|
Julcani | 99 |
124 |
140 |
167 |
530 |
|
|
|
|
|
|
||
2. 4Q22 and FY22 Volume Sold per Metal
|
||||||
|
|
|
|
|
||
1Q22
|
2Q22
|
3Q22
|
4Q22
|
FY22
|
||
|
|
|
|
|
||
Silver (Oz.) |
|
|
|
|
|
|
Orcopampa | 6,928 |
12,411 |
7,715 |
7,461 |
34,516 |
|
La Zanja | 21,818 |
29,273 |
34,147 |
24,707 |
109,944 |
|
Coimolache | 96,634 |
84,859 |
78,028 |
76,077 |
335,598 |
|
|
|
|
|
|
||
Lead (MT) |
|
|
|
|
|
|
Julcani | 76 |
93 |
112 |
138 |
418 |
Company Description
Compañía de
The Company owns
For a printed version of the Company’s 2021 Form 20-F, please contact the persons indicated above, or download a PDF format file from the Company’s web site.
(*) Operations wholly owned by Buenaventura
Note on Forward-Looking Statements
This press release may contain forward-looking information (as defined in the
View source version on businesswire.com: https://www.businesswire.com/news/home/20230216005854/en/
Contacts in
(511) 419 2540
(511) 419 2591 / Gabriel.salas@buenaventura.pe
Company Website: www.buenaventura.com.pe/ir
Contacts in NY:
(646) 452 2334
barbara@inspirgroup.com
Source: Compañía de
FAQ
What were Buenaventura's gold production figures for 4Q22?
What is the silver production outlook for Buenaventura in 2023?
How does Buenaventura's FY22 gold production compare to previous years?
What were the copper production numbers for Buenaventura in 4Q22?