Black Tusk Resources Inc. Permitting to Drill Up to 2,500 Metres Mogold and PG Highway Projects, Quebec
Black Tusk Resources Inc. announced the process of obtaining drilling permits for its PG Highway and MoGold projects in Quebec. The PG Highway site will involve 2,000 meters of diamond drilling targeting potential VMS mineralization at depths of 50 to 300 meters. The MoGold project will allow 500 meters of drilling to investigate six localized anomalies near a mineral occurrence. Both projects are based on promising geophysical survey results indicating significant mineral presence.
- Permits being sought for 2,500 meters of drilling across two projects.
- Strong geological indicators for mineralization at PG Highway project.
- Identified anomalies in MoGold project showing presence of silver, copper, and zinc.
- Forward-looking statements carry inherent uncertainties.
- Risks associated with exploration and compliance with regulations.
VANCOUVER, BC / ACCESSWIRE / August 22, 2022 / Black Tusk Resources Inc. ("Black Tusk" or the "Company) (C:TUSK)(OTC Pink:BTKRF)(FRA:0NB) is pleased to announce that the company is in the process of obtaining permits to drill on their PG Highway and MoGold projects located north of Val d'Or, Quebec.
On the PG Highway property TMC Geophysique recently completed deep-penetrating Pulse-EM -Time Domain Electromagnetic (TDEM) surveying to cover zones targeted through geologic assessment and rock sampling. The TMC Geophysical report concludes that the newly acquired surface TDEM data identified of a group of strong conductive anomalies in places coincident with areas of rock exposures that contained significant percentages of pyrite and pyrrhotite. The geology along the trend is interpreted to have potential for Volcanogenic Massive Sulphide (VMS) mineralization (see News Release dated 2022-08-07). The zone of interest also displays magnetic features derived from Black Tusk 2021 surveys. The geophysical survey results combined with the geology and rock sampling provide compelling targets for further exploration.
The permit application for the PG Highway project, as submitted by Black Tusk, includes 6 drill pads with associated access roads. Black Tusk plans up to 2,000 metres of diamond drilling from the permitted drill pads, with VMS targets at proposed depths ranging from 50 to 300 metres below surface (as modelled by the EM survey).
On the MoGold project, the TMC report of findings from the TDEM survey identified six localized anomalies that are roughly grouped around the Boily-Bérubé mineral occurrence (see News Release dated July 12, 2022). This is also the area where Black Tusk exploration obtained rock samples that returned elevated values for silver, copper and zinc. The TDEM features are modelled as relatively shallow-seated bodies/targets. The permit application for the MoGold area includes 4 drill pads to allow up to 500 metres of diamond drilling for testing the relatively shallow targets.
Black Tusk exploration programs undertaken in Quebec are supervised by Dr. Mathieu Piché, OGQ, with office located north of Val d'Or. He is also a Black Tusk company director.
Cautionary Statement
This press release contains forward-looking statements based on assumptions as of that date. These statements reflect management's current estimates, beliefs, intentions and expectations; they are not guarantees of future performance. The Company cautions that all forward-looking statements are inherently uncertain and that actual performance may be affected by a number of material factors, many of which are beyond the Company's control. Such factors include, among other things: risks and uncertainties relating to exploration and development; the ability of the Company to obtain additional financing; the Company's limited operating history; the need to comply with environmental and governmental regulations; fluctuations in the prices of commodities; operating hazards and risks; competition and other risks and uncertainties, including those described in the Company's Prospectus dated September 8, 2017 available on www.sedar.com. Accordingly, actual and future events, conditions, and results may differ materially from the estimates, beliefs, intentions, and expectations expressed or implied in the forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information.
On behalf of the Board of Directors
Richard Penn
CEO
(778) 384-8923
SOURCE: Black Tusk Resources Inc
View source version on accesswire.com:
https://www.accesswire.com/712965/Black-Tusk-Resources-Inc-Permitting-to-Drill-Up-to-2500-Metres-Mogold-and-PG-Highway-Projects-Quebec
FAQ
What is Black Tusk Resources Inc.'s recent news regarding drilling permits?
What findings did the TMC Geophysique survey reveal for the PG Highway project?
How much drilling is planned for the MoGold project?
What are the potential risks mentioned in the press release for Black Tusk Resources?