Brenmiller Begins bGen™ ZERO Construction at Tempo’s Beverage Manufacturing Plant
Brenmiller Energy (Nasdaq: BNRG) has begun construction on a 32 MWh bGen™ Thermal Energy Storage (TES) system at Tempo Beverages' plant in Netanya, Israel, replacing fossil fuel boilers to deliver sustainable process heat. The project, expected to be assembled by the end of September 2024 and commissioned in May 2025, aims to mitigate over 6,200 tons of carbon emissions annually and save Tempo an estimated $7.5 million over 15 years. The TES system will use roof-top solar and off-peak grid power. This initiative is part of Brenmiller's $500 million project pipeline, with 15% focused on the food and beverage sector.
- Brenmiller Energy is replacing fossil fuel boilers with a sustainable 32 MWh bGen™ TES system.
- The project is expected to mitigate over 6,200 tons of carbon emissions annually.
- Tempo will potentially save $7.5 million over 15 years.
- Construction and assembly are on schedule, with commissioning planned for May 2025.
- 15% of Brenmiller's $500 million project pipeline is with food and beverage manufacturers.
- The Dimona gigafactory supports potential sales of up to $200 million.
- Project completion and commissioning have long timelines, with final commissioning in May 2025.
- Potential delays in component procurement could impact the project timeline.
Insights
The decision by Brenmiller Energy to replace Tempo’s fossil fuel boilers with their bGen™ TES system marks a significant step towards cost savings and environmental sustainability for Tempo. From a financial perspective, the projected savings of
The adoption of Brenmiller’s bGen™ TES system is a noteworthy advancement for sustainability in the beverage industry. The significant reduction in carbon emissions—more than 6,200 tons annually—demonstrates a strong commitment to environmental stewardship. This move could serve as a benchmark for other companies in the beverage sector, which is a major consumer of thermal energy. Additionally, using rooftop solar and off-peak grid power to charge the TES system showcases a dual approach to renewable energy utilization, further enhancing the environmental benefits. This project could position Brenmiller as a pioneering force in sustainable industrial practices, potentially attracting more clients from environmentally conscious sectors. Nonetheless, the long-term environmental impact will depend on the consistent performance and scalability of the bGen™ system.
From a market perspective, Brenmiller's focus on the food and beverage industry, which constitutes about 15% of its project pipeline, is a strategic move. The industry's reliance on thermal energy makes it a prime candidate for TES solutions. By securing a project with Tempo, which is partially owned by Heineken, Brenmiller can leverage this relationship to secure more contracts within the sector. The announcement highlights the potential revenue-generating capacity of Brenmiller’s Dimona gigafactory, capable of supporting sales up to
- Brenmiller expected to break ground on highly anticipated electrification project for Tempo, Heineken-backed beverage manufacturer
- Brenmiller will replace Tempo’s fossil fuel boilers with 32 MWh bGen™ TES system to deliver sustainable process heat
-
Brenmiller’s bGen™ TES system estimated to mitigate over 6,200 tons of carbon emissions annually and save Tempo an estimated
over 15 years by eliminating the use of approximately 2,000 tons of heavy fuel each year$7.5 million
ROSH HA’AYIN,
Brenmiller’s bGen™ TES system for Tempo will charge using a combination of roof-top solar and ultra-low-cost off-peak grid power. The system is being configured to meet the beverage manufacturer’s precise operational needs and the final system design is expected to be completed by the end of July 2024. Brenmiller has started procuring the necessary components to manufacture Tempo’s bGen™ system and all system manufacturing will be completed at Brenmiller’s TES gigafactory in Dimona,
“We are pleased to report that our project to replace Tempo’s polluting heavy oil boilers with our bGen™ thermal battery is progressing according to schedule and is on-track to be commissioned less than a year from now,” stated Brenmiller’s Chairman and CEO, Avi Brenmiller. “The food and beverage industry is one of the top global consumers of thermal energy. Our project with Tempo serves as a great model for how our bGen™ TES system can benefit other food and beverage producers, a sector from which we are seeing strong demand.”
Approximately
About bGen™
bGen™, Brenmiller’s TES system, converts electricity into heat to power sustainable industrial processes at a price that is competitive with natural gas. The bGen™ charges by capturing low-cost electricity from renewables or the grid and stores it in crushed rocks. It then discharges steam, hot water or hot air on demand according to customer requirements. The bGen™ also supports the development of utility-scale renewables by providing critical flexibility and grid-balancing capabilities. bGen™ was named among TIME’s Best Inventions of 2023 in the Green Energy category.
About Brenmiller Energy Ltd.
Brenmiller Energy helps energy-intensive industries and power producers end their reliance on fossil fuel boilers. Brenmiller’s patented bGen™ thermal battery is a modular and scalable energy storage system that turns renewable electricity into zero-emission heat. It charges using low-cost renewable electricity and discharges a continuous supply of heat on demand and according to its customers’ needs. The most experienced thermal battery developer on the market, Brenmiller operates the world’s only gigafactory for thermal battery production and is trusted by leading multinational energy companies. For more information visit the Company’s website at https://bren-energy.com/ and follow the company on X (formerly Twitter) and LinkedIn. Information on, or accessible through, the websites mentioned above does not form part of this press release.
Forward-Looking Statements
This press release contains “forward-looking statements” within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 and other federal securities laws. Statements that are not statements of historical fact may be deemed to be forward-looking statements. For example, the Company is using forward-looking statements in this press release when it discusses: the installation of bGen™ ZERO at the Tempo plant and the timeline for the various installation phases, including that the final system design is expected to be completed by the end of July 2024, that the Company will commence on site assembly of the bGen™ system by the end of September 2024, that assembly is expected to be completed by the end of the 2024 and commissioned in May 2025, the Company’s
View source version on businesswire.com: https://www.businesswire.com/news/home/20240610881538/en/
Tori Bentkover
brenmillerenergy@antennagroup.com
Source: Brenmiller Energy Ltd.
FAQ
What is Brenmiller Energy's new project at Tempo Beverages?
How much carbon emissions will Brenmiller's project reduce annually?
How much will Tempo save with Brenmiller's new TES system?
When will Brenmiller's bGen™ TES system at Tempo be commissioned?
What energy sources will the bGen™ TES system use?