Atlas Awarded Quality Inspection Contract for Department of Energy’s LBNF Project
Atlas Technical Consultants (Nasdaq: ATCX) has secured a $4.1 million contract for quality inspection services at the Lead, South Dakota Sanford Underground Research Facility’s Long-Baseline Neutrino Facility (LBNF). This project, part of the Kiewit-Alberici Joint Venture, spans 3.5 years and will support the Deep Underground Neutrino Experiment (DUNE). Atlas will deploy its mobile A2LA certified material testing lab, enhancing its commitment to safety and quality assurance in collaboration with the Department of Energy.
- Secured a $4.1 million contract for the Long-Baseline Neutrino Facility.
- Contract term of 3.5 years indicates long-term engagement.
- Deployment of a mobile A2LA certified material testing lab enhances service quality.
- None.
AUSTIN, Texas, July 01, 2021 (GLOBE NEWSWIRE) -- Atlas Technical Consultants, Inc. (Nasdaq: ATCX) (“Atlas” or the “Company”), a leading Infrastructure and Environmental services provider, announced today that it was awarded a
“We are honored to be a contributor to this one-of-a-kind innovative project that brings together funding and expertise from around the world. Our selection is a testament to Atlas’ laboratory accreditation and technical expertise that provides quality assurance for our clients working in various environments across the country,” said Atlas CEO, L. Joe Boyer.
Atlas has provided services including certified welding inspection, concrete and soil testing, storm water sampling, and Health and Safety plans over the past two years for this project. Atlas’s mobile A2LA certification material testing lab will be deployed for this project.
This project involves building a physics lab deep inside an old gold mine, approximately one mile below the surface of the earth. To achieve this, workers will blast and drill to remove 800,000 tons of rock to make a home for the gigantic detector and its support systems. During excavation, the conveyor system will run approximately 10 hours per day, transporting between 1,500 and 2,500 tons of rock daily for the next three years.
Atlas has worked safely with the Department of Energy for years, always keeping the safety and health of the crews and community as a steadfast priority. The company is committed to maintaining a strong safety culture and a healthy, hazard-free work environment for all who operate in, visit, or enter clients’ facilities and job sites.
About Atlas Technical Consultants
Headquartered in Austin, Texas, Atlas is a leading provider of Environmental (ENV), Testing, Inspection & Certification (TIC), Engineering & Design (E&D), and Program, Construction, and Quality Management (PCQM) services. Under the name Atlas Technical Consultants, we offer solutions to public and private sector clients in the transportation, commercial, water, government, education, and industrial markets. With approximately 3,500 employees and a nationwide footprint, Atlas provides a broad range of mission-critical technical services, helping clients test, inspect, certify, plan, design, and manage a wide variety of projects across diverse end markets. For more information, go to https://www.oneatlas.com.
Forward-Looking Statements
The statements contained in this press release that are not purely historical are forward-looking statements and involve a number of risks and uncertainties. Our forward-looking statements include, but are not limited to, statements regarding our or our management team’s expectations, hopes, beliefs, intentions or strategies regarding the future. In addition, any statements that refer to projections, forecasts or other characterizations of future events or circumstances, including any underlying assumptions and estimates, are forward-looking statements. The words “anticipate,” “believe,” “continue,” “could,” “estimate,” “expect,” “intend,” “may,” “might,” “plan,” “possible,” “potential,” “predict,” “project,” “should,” “would” and variations of such words and similar expressions may identify forward-looking statements, but the absence of these words does not mean that a statement is not forward-looking. The forward-looking statements contained in this press release are based on our expectations and beliefs as of the date of this filing concerning future developments and their potential effects on us. There can be no assurance that future developments affecting us will be those that we have anticipated.
Contacts:
Media
Karlene Barron
770-314-5270
karlene.barron@oneatlas.com
Investor Relations
512-851-1507
ir@oneatlas.com
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/32cbf540-f498-4f06-8b6e-3f19fac38438
FAQ
What is the significance of the $4.1 million contract awarded to ATCX?
How long will the contract for ATCX at the LBNF last?
What project is ATCX involved in with this contract?
Which joint venture is ATCX working with on this project?