STOCK TITAN

Atico Reports Consolidated Financial Results for Second Quarter of 2024

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

Atico Mining reported its Q2 2024 financial results, posting income from mining operations of $2.6 million and a net loss of $0.4 million. Key highlights include:

  • Production at El Roble mine: 3.7 million lbs of copper and 2,850 oz of gold in concentrate
  • Cash cost: $1.48 per payable pound of copper
  • Sales decreased 11% to $10.9 million due to weather-related shipping delays
  • Cash margin increased 68% to $2.86 per pound of payable copper
  • All-in sustaining cash cost reduced to $2.32 per payable pound of copper

The company expects strong revenues in Q3 2024 to offset this quarter's results. Atico is focused on achieving production guidelines, advancing the La Plata project, and executing a near-mine drill program at El Roble.

Atico Mining ha riportato i risultati finanziari del secondo trimestre del 2024, registrando un reddito dalle operazioni minerarie di 2,6 milioni di dollari e una perdita netta di 0,4 milioni di dollari. I punti salienti includono:

  • Produzione presso la miniera di El Roble: 3,7 milioni di libbre di rame e 2.850 once d'oro in concentrato
  • Costo in contante: 1,48 dollari per libbra di rame pagabile
  • Le vendite sono diminuite dell'11% a 10,9 milioni di dollari a causa dei ritardi nella spedizione legati al maltempo
  • Il margine di cassa è aumentato del 68% a 2,86 dollari per libbra di rame pagabile
  • Il costo totale sostenibile in contante è stato ridotto a 2,32 dollari per libbra di rame pagabile

La società prevede ricavi solidi per il terzo trimestre del 2024 per compensare i risultati di questo trimestre. Atico è concentrata sul raggiungimento delle linee guida di produzione, sull'avanzamento del progetto La Plata e sull'esecuzione di un programma di perforazione vicino alla miniera di El Roble.

Atico Mining reportó sus resultados financieros del segundo trimestre de 2024, con ingresos por operaciones mineras de 2,6 millones de dólares y una pérdida neta de 0,4 millones de dólares. Los puntos destacados incluyen:

  • Producción en la mina El Roble: 3,7 millones de libras de cobre y 2,850 onzas de oro en concentrado
  • Costo en efectivo: 1,48 dólares por libra de cobre pagadero
  • Las ventas disminuyeron un 11% a 10,9 millones de dólares debido a retrasos en el envío por condiciones climáticas
  • El margen de efectivo aumentó un 68% a 2,86 dólares por libra de cobre pagadero
  • El costo total sostenible en efectivo se redujo a 2,32 dólares por libra de cobre pagadero

La empresa espera ingresos fuertes en el tercer trimestre de 2024 para compensar los resultados de este trimestre. Atico se enfoca en cumplir con las directrices de producción, avanzar en el proyecto La Plata y ejecutar un programa de perforación cercano a la mina El Roble.

Atico Mining은 2024년 2분기 재무 결과를 발표했으며, 광업에서 발생한 수익은 260만 달러이고 순손실은 40만 달러로 보고되었습니다. 주요 하이라이트는 다음과 같습니다:

  • 엘 로블 광산 생산량: 370만 파운드의 구리2,850온스의 금 농축물
  • 현금 비용: 지급되는 구리 1파운드당 1.48달러
  • 판매는 기상 관련 운송 지연으로 1,090만 달러로 11% 감소했습니다.
  • 현금 마진은 지급 구리 1파운드당 2.86달러로 68% 증가했습니다.
  • 모든 포괄적 현금 비용이 지급되는 구리 1파운드당 2.32달러로 감소했습니다.

회사는 이번 분기의 결과를 상쇄하기 위해 2024년 3분기 강력한 수익을 기대하고 있습니다. Atico는 생산 지침 달성, 라 플라타 프로젝트 진행 및 엘 로블에서 인근 탐사 프로그램 실행에 집중하고 있습니다.

Atico Mining a publié ses résultats financiers du deuxième trimestre 2024, avec des revenus des opérations minières de 2,6 millions de dollars et une perte nette de 0,4 million de dollars. Les points saillants comprennent :

  • Production à la mine El Roble : 3,7 millions de livres de cuivre et 2 850 onces d'or en concentré
  • Coût en cash : 1,48 dollar par livre de cuivre payable
  • Les ventes ont diminué de 11 % à 10,9 millions de dollars en raison de retards d'expédition liés à la météo
  • La marge de trésorerie a augmenté de 68 % à 2,86 dollars par livre de cuivre payable
  • Le coût total de soutien en espèces a été réduit à 2,32 dollars par livre de cuivre payable

La société s'attend à des revenus solides au troisième trimestre de 2024 pour compenser les résultats de ce trimestre. Atico se concentre sur l'atteinte des directives de production, l'avancement du projet La Plata et l'exécution d'un programme de forage près de la mine El Roble.

Atico Mining hat die Finanzergebnisse für das 2. Quartal 2024 veröffentlicht und einen Umsatz aus Bergbauaktivitäten von 2,6 Millionen Dollar sowie einen Nettoverlust von 0,4 Millionen Dollar verzeichnet. Zu den wichtigsten Punkten gehören:

  • Produktion in der El Roble Mine: 3,7 Millionen Pfund Kupfer und 2.850 Unzen Gold in Konzentraten
  • Bar-Kosten: 1,48 Dollar pro zahlbarem Pfund Kupfer
  • Umsätze gingen um 11% auf 10,9 Millionen Dollar zurück aufgrund wetterbedingter Versandverzögerungen
  • Die Bar-Marge stieg um 68% auf 2,86 Dollar pro zahlbarem Pfund Kupfer
  • Die gesamten nachhaltigen Bar-Kosten sanken auf 2,32 Dollar pro zahlbarem Pfund Kupfer

Das Unternehmen erwartet im 3. Quartal 2024 starke Einnahmen, um die Ergebnisse dieses Quartals auszugleichen. Atico konzentriert sich darauf, Produktionsvorgaben zu erreichen, das Projekt La Plata voranzutreiben und ein Bohrprogramm in der Nähe der Mine El Roble durchzuführen.

Positive
  • Production increased 32% for copper and 23% for gold compared to Q2 2023
  • Cash cost per pound of payable copper decreased 33% to $1.48
  • Cash margin increased 68% to $2.86 per pound of payable copper
  • All-in sustaining cash cost reduced to $2.32 per payable pound of copper
  • El Roble mine life extended until Q1 2027
  • La Plata Feasibility Study completed with positive economics
Negative
  • Net loss of $0.4 million for the quarter
  • Sales decreased 11% to $10.9 million due to weather-related shipping delays
  • Negative working capital of $4.3 million as of June 30, 2024
  • Ongoing arbitration for El Roble royalty dispute with National Mining Agency
  • Legal challenges to La Plata environmental consultation process

(All amounts expressed in US dollars, unless otherwise stated)

VANCOUVER, British Columbia, Aug. 20, 2024 (GLOBE NEWSWIRE) -- Atico Mining Corporation (the “Company” or “Atico”) (TSX.V: ATY | OTC: ATCMF) today announced its financial results for the three months ended June 30, 2024, posting income from mining operations of $2.6 million and a net loss of $0.4 million. Production for the period at Atico’s El Roble mine totaled 3.7 million pounds (“lbs”) of copper and 2,850 ounces (“oz”) of gold in concentrate at a cash cost(1) of $1.48 per payable pound of copper(2).

Fernando E. Ganoza, CEO and Director, commented, “this period we had improvements in almost all operational metrics when compared to the previous quarter and same period last year. However, these improvements are not reflected in this period’s revenue and income as a material portion of the concentrate shipped will be recognized as revenue in the third quarter due to shipping delays caused by poor weather conditions. We therefore anticipate strong revenues in the third quarter which will make up for this quarter’s results.” Mr. Ganoza continued, “for the second half of the year we will be focused on achieving production guidelines and cost efficiencies at El Roble, continue advancing the La Plata project engineering and permitting, and executing the near-mine drill program at El Roble aimed at replacing resources and further extending the life of mine.”

Second Quarter Financial Highlights

  • Net loss for the quarter amounted to $0.4 million, compared with $0.1 million net income for the comparative quarter. The loss was primarily due to lower sales and a net realized loss on the settlements of its derivative instruments.
  • Sales for the quarter decreased 11% to $10.9 million when compared with $12.2 million in Q2-2023. The decrease was primarily due to weather conditions which caused delays at the Port of Loading. Copper (“Cu”) and gold (“Au”) accounted for 76% and 24% of the 5,603 (Q2-2023 – 6,597) dry metric tonnes (“DMT”) sold during Q2-2024.
  • The average realized price per metal was $4.34 (Q2-2023 - $3.92) per pound of copper and $2,303 (Q2-2023 - $1,938) per ounce of gold.
  • Ending working capital was negative $4.3 million (December 31, 2023 – $2.1 million), while the Company had $6.1 million (December 31, 2023 – $6.0 million) in long-term loans payable.
  • Cash costs(1) were $131.07 per tonne of processed ore and $1.48 per pound of payable copper produced, which were an increase of 5% and a decrease of 33% over Q2-2023, respectively. The decrease in cash cost per pound of payable copper produced compared to the comparative period is primarily due to higher amounts of payable copper from increased copper grade, as well as higher gold (by-product) credits from increased gold grade and gold price.
  • Cash margin was $2.86 per pound of payable copper produced(1), which was an increase of 68% over Q2-2023 due to the decrease in cash cost per pound (above) as well as the increase in realized copper price.
  • All-in sustaining cash cost per payable pound of copper produced(1), was $2.32 (Q2-2023 - $3.28), a reduction that is primarily due to the decrease in cash cost per pound (above).
  • On August 8, 2024, (subsequent to the reporting period) the Company announced in a press release that it has entered into an amendment and restatement agreement with Trafigura PTE. LTD. (the “Lender”) to amend the US$ 10 million credit agreement entered into with the Lender on February 2022, by extending the maturity date of the credit facility from August 8, 2024, to July 31, 2026.

Second Quarter Summary of Financial Results

   Q2
2024
  Q2
2023
 %
Change
 
Revenue
 $
10,860,467
 $
12,228,088
 (11%) 
Cost of sales
  (8,308,719)  (11,273,890) (26%) 
Income from mining operations
  2,551,748
  954,198
 167% 
As a % of revenue
  23%
   8%   
General and administrative expenses and share-based payments
  (1,585,615)
  (1,557,142)
 2%
 
Income (loss) from operations
  891,086  (602,944)
 (248%)
 
As a % of revenue
  8%
  (5%)
   
Loss before income taxes
  (730,559)
  (935,677)
 (22%)
 
Net (loss) income
  (424,612)
  55,040
 (871%) 
As a % of revenue
  (4%)
   1%
   
Operating cash flow before changes in non-cash operating working capital items(1)
 $
2,472,955
 $2,999,267 (18%) 
          

Second Quarter Consolidated Operational Details

In Q2-2024, the Company produced 3.7 million lbs of copper, 2,850 oz of gold, and 9,972 oz of silver. When compared to the same period in 2023, production increased by 32% for copper and 23% for gold, which was due to average copper head-grades increasing by 26% and gold head-grades increasing by 8%. Tonnes of processed ore also increased by 4% compared to Q2-2023.

  Q2
2024
 Q2
2023
 %
Change
 
Production (Contained metals)(3)      
Copper (000s lbs) 3,710 2,803 32% 
Gold (oz) 2,850 2,313 23% 
Silver (oz) 9,972 7,826 27% 
Mine      
Tonnes of material mined 70,826 72,340 (2%) 
Mill      
Tonnes processed 71,079 68,471 4% 
Tonnes processed per day 852 799 7% 
Copper grade (%) 2.57 2.04 26% 
Gold grade (g/t) 1.95 1.80 8% 
Silver grade (g/t) 9.30 9.98 (7%) 
Recoveries      
Copper (%) 92.0 90.6 2% 
Gold (%) 64.2 58.4 10% 
Silver (%) 47.3 36.6 29% 
Concentrates      
Copper Concentrates (DMT) 9,197 6,789 35% 
Copper (%) 18.3 18.7 (2%) 
Gold (g/t) 9.6 10.5 (8%) 
Silver (g/t) 33.7 34.9 (3%) 
       
Payable copper produced (000s lbs) 3,487 2,639 32% 
Cash cost per pound of payable copper ($/lbs)(1)(2) 1.48 2.22 (33%) 
        

The financial statements and MD&A are available on SEDAR+ and have also been posted on the company's website at http://www.aticomining.com/s/FinancialStatements.asp

El Roble Second Quarter Updates

On April 30, 2024, the Company announced an updated mineral resource and reserve estimate for the El Roble Mine located in Colombia, prepared under National Instrument 43-101 standards, with an effective date of March 12, 2024. Measured and Indicated Mineral Resources (inclusive of Mineral Reserves) are estimated at 881 thousand tonnes averaging 3.40% Cu, and 2.98 g/t Au. Proven and Probable Mineral Reserves are estimated at 828 thousand tonnes averaging 2.49% Cu, and 2.20 g/t Au. A conversion rate of 88% of Measured and Indicated resources to Proven and Probable reserve categories was applied over the current resource estimate. Life of Mine is extended until the first quarter of 2027. More information can be found on the Company’s press release dated April 30, 2024, available on SEDAR+ and on the Company’s website.

The ongoing Arbitration at the Center for Arbitration and Conciliation of the Bogota Chamber of Commerce to resolve the El Roble royalty dispute with the National Mining Agency is progressing with the first procedural hearing concluded on July 2, 2024, confirming the tribunal's competence and scheduling evidentiary hearings and witness testimonies. The first evidentiary hearing occurred on July 12, 2024, with witness testimonies well underway and expected to conclude by September 2024. The tribunal’s final decision is due by January 15, 2025, with an allowable six-month extension as per the arbitration rules. If the Tribunal’s final decision favors the Company, the Payment Plan will cease, and any amounts paid under the Payment Plan with the National Mining Agency will need to be reimbursed to the Company or offset against future royalty obligations.

The Payment Plan is payable in biannual instalments for a total principal amount of COP$101,217,832,270 (approximately $24.4 million) plus interest at a 6% annual rate. As at June 30, 2024, the Company has paid to the National Mining Agency a total principal amount of COP$30,598,648,182 (approximately $7.4 million) plus interest. As of June 30, 2024, 6,520 of the 10,627 dry metric tonnes of metals concentrate in inventories were pledged as security for the principal amount of the Payment Plan that remains outstanding.

La Plata Second Quarter Updates

In May 2022 the Company received the technical approval of its Environmental and Social Impact Assessment (“ESIA”) study for the La Plata project and the Ministry of Environment, Waters and Ecological Transition (MAATE) initiated the socialization of the ESIA, through an environmental public consultation process, as an important step for the issuance of the environmental license for the La Plata project. However, on July 31, 2023, the Constitutional Court in Ecuador, admitted for processing a claim of the Confederation of Indigenous Nationalities of Ecuador (CONAIE) and other complainants, provisionally suspending Executive Decree No 754 signed on May 31, 2023, that regulates environmental consultations for all public and private industries and sectors in Ecuador – not limited to extractive industries.

The La Plata environmental consultation process was, as result put on pause until a ruling was made from the Constitutional Court in Ecuador. On November 17, 2023, the Ecuadorian Constitutional Court ruled the Executive Decree 754 was unconstitutional, but decided to maintain the decree in force until the Ecuadorian National Assembly enacts this procedure into Organic Law. Until the Assembly passes the necessary organic law, the temporary suspension of the Decree was revoked by the Constitutional Court and the Decree remains in effect. This allows many projects across all industries and sectors, including La Plata, to resume their respective consultation process, which MAATE reinitiated for La Plata during Q1-2024.

On March 22, 2024, the mayor of the Canton of Sigchos, CONAIE and other complainants (the “Claimants”) filed a constitutional protective action against MAATE and other governmental entities, challenging the environmental consultation process that was being conducted by MAATE which is an important step for the issuance of the La Plata environmental license. The protective action was accepted by the Court on March 25, 2024, and the Court proceeding was carried out in the Judicial Unit of the Canton of Sigchos, in the province of Cotopaxi, Ecuador, between May 20, 2024, and July 9, 2024. On August 2, 2024, the Court issued a binding oral ruling, rejecting the Protective Action filed by the Claimants. The Court concluded that the consultation process conducted by MAATE complied with applicable legal requirements, did not constitute rights violations, and removed the cautionary measures previously applied. The court issued the ruling in writing on August 5, 2024. After the Court’s ruling, the Claimants advised the Court of their intention to appeal the Court’s decision. The appeal will be heard by the Provincial Court of Justice of Cotopaxi in due course. No date for the appeal has been set.

On July 2, 2024 (subsequent to the reporting period), the Company reported results of the La Plata Feasibility Study prepared in accordance with National Instrument 43-101 and the Technical Report was filed on SEDAR+ on August 14, 2024.

  • Initial Probable Mineral Reserves for the La Plata project 2.51 Mt with an average grade of 1.59% Cu, 2.28 g/t Au, 30.41 g/t Ag, and 2.18% Zn.
  • Updated Indicated Resources of 2.345 Mt with an average grade of 2.13% Cu, 2.98 g/t Au, 40 g/t Ag, 3.05% Zn and Inferred Resources of 380 Kt at average grade of 0.96% Cu, 1.75 g/t Au, 38 g/t Ag, 2.29% Zn.
  • Average annual production of 9.71 Mlbs Cu, 15,929 oz Au, 226,299 oz Ag, and 13.25 Mlbs Zn in concentrates over 8.1 years Life of Mine (“LOM”)
  • Initial Capex of US$91 Million, including a 9.8% contingency
  • Average AIC(1) of US$2.70 per payable lb of Cu equivalent produced over LOM 
  • After Tax NPV of US$93M at a 5% discount rate and an IRR of 25.1%

The Company continues to work on obtaining the necessary permits and the environmental license to begin construction of the La Plata project.

Qualified Person

Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.

About Atico Mining Corporation

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America.
The Company generates significant cash flow through the operation of the El Roble mine and is developing it’s high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities. For more information, please visit www.aticomining.com.

ON BEHALF OF THE BOARD

Fernando E. Ganoza
CEO
Atico Mining Corporation

Trading symbols: TSX.V: ATY | OTC: ATCMF

Investor Relations
Igor Dutina
Tel: +1.604.633.9022

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

No securities regulatory authority has either approved or disapproved of the contents of this news release. The securities being offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the ‘‘U.S. Securities Act’’), or any state securities laws, and may not be offered or sold in the United States, or to, or for the account or benefit of, a "U.S. person" (as defined in Regulation S of the U.S. Securities Act) unless pursuant to an exemption therefrom. This press release is for information purposes only and does not constitute an offer to sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction.

Cautionary Note Regarding Forward Looking Statements
This announcement includes certain “forward-looking statements” within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein, without limitation the use of net proceeds, are forward-looking statements. Forward- looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s expectations include uncertainties as to the timing and process for renewal of title to the El Roble claims; uncertainties as to the outcome of the Arbitration process with the National Mining Agency in Colombia for the royalties’ dispute, as to the timing of the Tribunal’s decision, and if a favorable Tribunal Decision, as to the timing for the reimbursement of the payments made under the Payment Plan to the National Mining Agency; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs of the Company’s projects; the need to obtain additional financing to maintain its interest in and/or explore and develop the Company’s mineral projects; uncertainty of meeting anticipated program milestones for the Company’s mineral projects; and other risks and uncertainties disclosed under the heading “Risk Factors” in the Company's Management's Discussion and Analysis for the year ended December 31, 2023 as filed on SEDAR+ and as available on the Company's website for further details, and in the prospectus of the Company dated March 2, 2012 filed with the Canadian securities regulatory authorities on the SEDAR+ website at www.sedarplus.ca

Non-GAAP Financial Measures

The items marked with a "(1)" are alternative performance measures and readers should refer to Non-GAAP Financial Measures in the Company's Management's Discussion and Analysis for the year ended December 31, 2023, as filed on SEDAR+ and as available on the Company's website for further details.


FAQ

What were Atico Mining's (ATCMF) production figures for Q2 2024?

Atico Mining produced 3.7 million lbs of copper and 2,850 oz of gold at its El Roble mine in Q2 2024.

How did Atico Mining's (ATCMF) Q2 2024 financial results compare to Q2 2023?

Atico Mining reported a net loss of $0.4 million in Q2 2024, compared to a net income of $0.1 million in Q2 2023. Sales decreased 11% to $10.9 million.

What is the current cash cost per pound of payable copper for Atico Mining (ATCMF)?

Atico Mining's cash cost was $1.48 per payable pound of copper produced in Q2 2024, a 33% decrease from Q2 2023.

What is the status of Atico Mining's (ATCMF) La Plata project as of Q2 2024?

Atico Mining completed a Feasibility Study for La Plata, showing positive economics. The company is working on obtaining permits and the environmental license to begin construction.

Has Atico Mining (ATCMF) extended the life of its El Roble mine?

Yes, Atico Mining has extended the life of the El Roble mine until the first quarter of 2027, based on updated mineral resource and reserve estimates.

ATICO MINING CORP

OTC:ATCMF

ATCMF Rankings

ATCMF Latest News

ATCMF Stock Data

12.74M
106.20M
12.29%
3.34%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Vancouver