Atlantic Lithium Limited Announces High-Grade Drill Results - Highest Grade to Date
Atlantic Lithium reported promising assay results from its Ewoyaa Lithium Project in Ghana, highlighting ongoing resource extension and infill drilling. The results include high-grade intersections with the highest grade reaching 6.78% Li2O. A total of 37,000m results have been reported from the 47,000m drilling program, with significant expansions in mineralisation confirmed at various deposits. Their recent Pre-Feasibility Study projected LOM revenues exceeding US$4.84bn, with an impressive IRR of 224%. The company anticipates a resource upgrade in early 2023.
- High-grade drill intersections reported, including 6.78% Li2O.
- 37,000m of results from a 47,000m drilling program reported to date.
- LOM revenues projected to exceed US$4.84bn with an IRR of 224%.
- Positive Pre-Feasibility Study outcomes support mining licence application.
- None.
Mineralisation Extended - Multiple Intersections Highest Grade of
SYDNEY, AUSTRALIA / ACCESSWIRE / November 29, 2022 / Atlantic Lithium Limited (AIM:ALL)(OTCQX:ALLIF)(ASX:A11) "Atlantic Lithium" or the "Company"), the funded African-focussed lithium exploration and development company targeting to deliver Ghana's first lithium mine, is pleased to announce assay results from the resource and exploration drilling programme now completed at the Ewoyaa Lithium Project ("Ewoyaa" or the "Project") in Ghana, West Africa.
Figures and Tables referred to in this release can be viewed in the PDF version available via this link:
http://www.rns-pdf.londonstockexchange.com/rns/8509H_1-2022-11-28.pdf
HIGHLIGHTS:
- Assay results reported for a further 10,679m of exploration and infill diamond drilling ("DD") and reverse circulation ("RC") drilling completed at the Ewoyaa Main, Ewoyaa North-East, Kaampakrom and Grasscutter West deposits, part of the now completed resource evaluation and exploration RC and DD programme.
- Newly reported drilling results fall both within and outside the currently defined 30.1Mt @
1.26% Li2O Ewoyaa JORC (2012) Compliant Mineral Resource Estimate ("MRE" or the "Resource"); extending mineralisation at the Ewoyaa North-East and Ewoyaa Main deposits, defining new mineralisation from surface at the Kaampakrom North deposit and providing further confidence in Resource conversion at the Kaampakrom West deposit. - Multiple high-grade exploration drill intersections outside of the current MRE reported at the Ewoyaa North-East, Kaampakrom West and Ewoyaa Main deposits, including highlights of:
- GRC0785: 35m at
1.48% Li2O from 111m - GRC0760: 27m at
1.71% Li2O from 155m - GRC0769: 46m at
0.96% Li2O from 51m - GRC0775: 20m at
1.85% Li2O from 72m - GRC0777: 24m at
1.43% Li2O from 108m - GRC0763: 26m at
1.26% Li2O from 163m - GRC0759A: 17m at
1.69% Li2O from 114m - GRC0777: 14m at
1.89% Li2O from 140m - GRC0775: 13m at
1.91% Li2O from 117m - GRC0800: 23m at
1.01% Li2O from 263m - GRC0759A: 18m at
1.24% Li2O from 148m - GRC0779: 14m at
1.43% Li2O from 137m - GRC0776: 10m at
1.96% Li2O from 190m
- GRC0785: 35m at
- Broad and high-grade infill drill intersections within the current MRE, reported at the Ewoyaa Main and Ewoyaa North-East deposits, including highlights of:
- GDD0090: 63.6m at
1.86% Li2O from 14.3m - GDD0089: 68m at
1.37% Li2O from 15m - GRC0756: 60m at
1.36% Li2O from 29m - GDD0098: 24.4m at
1.72% Li2O from 38.6m - GDD0090: 17.9m at
1.37% Li2O from 79.5m - GDD0094: 21m at
0.96% Li2O from 46m
- GDD0090: 63.6m at
- Highest grade of
6.78% Li2O confirmed in previously reported hole GDD0071 from 31m to 32m (refer RNS of 20 October 2022), and additional high-grades of5.14% Li2O in hole GDD0090 from 30m to 31m and4.78% Li2O from 31m to 31.8m. - Approximately 37,000m of results from the 47,000m drilling programme reported to date.
- Recently announced Pre-Feasibility Study (refer RNS of 22 September 2022) delivers exceptional financial outcomes for a 2Mtpa operation, producing an average c. 255,000tpa of
6% Li2O spodumene concentrate ("SC6") over a 12.5-year operation:- LOM revenues exceeding US
$4.84b n, Post-tax NPV8 of US$1.33b n, IRR of224% over 12.5 years - US
$125m capital cost with industry-leading payback period of <5 months - C1 cash operating costs of US
$278 per tonne of6% lithium spodumene concentrate Free on Board ("FOB") Ghana Port, after by-product credits - Average Life of Mine ("LOM") EBITDA of US
$248m per annum - 18.9Mt at
1.24% Li2O Maiden Ore Reserve - Average annualised US
$1,359 /dry metric tonne SC6 pricing used
- LOM revenues exceeding US
Commenting on the Company's latest progress, Lennard Kolff, Interim Chief Executive Officer of Atlantic Lithium, said:
"Drilling continues to deliver high-grade drill intersections both within and outside the current MRE.
"This latest batch of results has delivered multiple drill intersections outside the resource footprint at the Ewoyaa North-East, Kaampakrom West and Ewoyaa Main deposits, including highlights of 35m at
"Drilling has returned high-grade results at the Kaampakrom West deposit, including highlights of 20m at
"We have reported approximately 37,000m of the 47,000m programme to date, with 10,000m of assays pending and a Resource upgrade expected early 2023. The increased Resource estimate will inform a Definitive Feasibility Study, targeted for completion in mid-2023.
"With the Pre-Feasibility Study now delivered, the Mining Licence application submitted, ongoing positive drilling results and with the support of our funding agreement with Piedmont Lithium, we feel the Company is ideally positioned to benefit from the unprecedented levels of lithium demand that are expected over the coming years."
New Drilling Results:
Further assay results have been received for an additional 10,679m of RC and DD drilling from the recently completed drill programme at the Ewoyaa Project. Multiple high-grade drill intersections are reported for exploration drilling results outside of the currently defined Resource at the Ewoyaa North-East, Kaampakrom West, Ewoyaa Main and Grasscutter West and deposits (refer Table 1, Appendix 1 and Appendix 2).
High-grade infill drill intersections are reported within the Ewoyaa Main and Ewoyaa North-East deposits, which fall within the currently defined 30.1Mt @
Table 1: High-grade exploration drill intersection highlights at greater than 10 Li x m, reported at a
Hole ID | Target | Deposit | From m | To m | Interval m | Hole depth m | assay Li2O % | Intersection | metal content Li x m |
GRC0785 | EXPL | NE | 111 | 146 | 35 | 190 | 1.48 | GRC0785: 35m at | 51.68 |
GRC0760 | EXPL | NE | 155 | 182 | 27 | 240 | 1.70 | GRC0760: 27m at | 45.94 |
GRC0769 | EXPL | KPKW | 51 | 97 | 46 | 119 | 0.96 | GRC0769: 46m at | 44.16 |
GRC0775 | EXPL | KPKW | 72 | 92 | 20 | 150 | 1.85 | GRC0775: 20m at | 37.00 |
GRC0777 | EXPL | KPKW | 108 | 132 | 24 | 180 | 1.42 | GRC0777: 24m at | 34.12 |
GRC0763 | EXPL | NE | 163 | 189 | 26 | 270 | 1.25 | GRC0763: 26m at | 32.56 |
GRC0759A | EXPL | NE | 114 | 131 | 17 | 230 | 1.69 | GRC0759A: 17m at | 28.73 |
GRC0777 | EXPL | KPKW | 140 | 154 | 14 | 180 | 1.89 | GRC0777: 14m at | 26.42 |
GRC0775 | EXPL | KPKW | 117 | 130 | 13 | 150 | 1.91 | GRC0775: 13m at | 24.80 |
GRC0800 | EXPL | Main | 263 | 286 | 23 | 347 | 1.00 | GRC0800: 23m at | 23.01 |
GRC0759A | EXPL | NE | 148 | 166 | 18 | 230 | 1.24 | GRC0759A: 18m at | 22.31 |
GRC0779 | EXPL | NE | 137 | 151 | 14 | 272 | 1.43 | GRC0779: 14m at | 19.98 |
GRC0776 | EXPL | NE | 190 | 200 | 10 | 260 | 1.95 | GRC0776: 10m at | 19.51 |
GRC0798 | EXPL | Main | 254 | 267 | 13 | 322 | 1.16 | GRC0798: 13m at | 15.09 |
GRC0796 | EXPL | Main | 237 | 248 | 11 | 300 | 1.32 | GRC0796: 11m at | 14.53 |
GRC0762 | EXPL | NE | 81 | 88 | 7 | 223 | 1.88 | GRC0762: 7m at | 13.16 |
GRC0799 | EXPL | NE | 182 | 194 | 12 | 210 | 0.99 | GRC0799: 12m at | 11.92 |
GRC0755 | EXPL | GrassW | 172 | 194 | 22 | 241 | 0.53 | GRC0755: 22m at | 11.66 |
Table 2: High-grade infill drill intersection highlights at greater than 10 Li x m, reported at a
Hole ID | Target | Deposit | From m | To m | Interval m | Hole depth m | assay Li2O % | Intersection | metal content Li x m |
GDD0090 | IND | NE | 14.3 | 77.9 | 63.6 | 114 | 1.86 | GDD0090: 63.6m at | 118.02 |
GDD0089 | MEA | Main | 15 | 83 | 68 | 90.8 | 1.37 | GDD0089: 68m at | 92.88 |
GRC0756 | MEA | Main | 29 | 89 | 60 | 90 | 1.35 | GRC0756: 60m at | 81.23 |
GDD0098 | IND | Main | 38.6 | 63 | 24.4 | 170.4 | 1.72 | GDD0098: 24.4m at | 41.94 |
GDD0090 | IND | NE | 79.5 | 97.4 | 17.9 | 114 | 1.36 | GDD0090: 17.9m at | 24.41 |
GDD0094 | IND | Main | 46 | 67 | 21 | 95.4 | 0.95 | GDD0094: 21m at | 19.97 |
GDD0096 | IND | Main | 45 | 62 | 17 | 83.4 | 0.95 | GDD0096: 17m at | 16.07 |
GRC0781 | IND | KPKW | 80 | 88 | 8 | 110 | 1.74 | GRC0781: 8m at | 13.95 |
Exploration drilling results outside the 30.1Mt at
Resource infill drilling results received to date at the Ewoyaa Main and Ewoyaa North-East deposits have confirmed good mineralisation continuity and increased resource confidence on a nominal 40m x 40m Indicated grid and 20m x 20m Measured grid. Measured drilling targeted the first 1.5 to 2 years of planned production at the Ewoyaa Main deposit. Additionally, infill drilling provided further material for test-work and customer acceptance samples within the planned starter pit.
High grades were reported within the Kaampakrom West deposit including highlights of 20m at
Sample preparation was completed by Intertek Ghana and assay by Intertek Perth with all reported results passing QA/QC protocols, providing confidence in reported results.
Figure 1: Location of reported assay results with highlight drill intersections.
Figure 2: Cross-section A-A' showing assay results received for GDD0089 at the Ewoyaa Starter Pit deposit.
Figure 3: Cross-section B-B' assay results received forGRC0775 and GRC0777 at the Kaampakrom West target.
Figure 4: Cross-section C-C' assay results received for GDD0090, GRC0776 and GRC0772 at the Ewoyaa North-East deposit.
Competent Persons
Information in this report relating to the exploration results is based on data reviewed by Mr Lennard Kolff (MEcon. Geol., BSc. Hons ARSM), Chief Geologist of the Company. Mr Kolff is a Member of the Australian Institute of Geoscientists who has in excess of 20 years' experience in mineral exploration and is a Qualified Person under the AIM Rules. Mr Kolff consents to the inclusion of the information in the form and context in which it appears.
Information in this report relating to Mineral Resources was compiled by Shaun Searle, a Member of the Australian Institute of Geoscientists. Mr Searle has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Searle is a director of Ashmore. Ashmore and the Competent Person are independent of the Company and other than being paid fees for services in compiling this report, neither has any financial interest (direct or contingent) in the Company. Mr Searle consents to the inclusion in the report of the matters based upon the information in the form and context in which it appears.
The reported Ore Reserves have been compiled by Mr Harry Warries. Mr Warries is a Fellow of the Australasian Institute of Mining and Metallurgy and an employee of Mining Focus Consultants Pty Ltd. He has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking, to qualify as a Competent Person as defined in the 'Australasian Code for Reporting of Mineral Resources and Ore Reserves' of December 2012 ("JORC Code") as prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, the Australian Institute of Geoscientists and the Minerals Council of Australia. Mr Warries gives Atlantic Lithium Limited consent to use this reserve estimate in reports.
This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.
For any further information, please contact:
Atlantic Lithium Limited Lennard Kolff (Interim CEO) Amanda Harsas (Finance Director and Company Secretary) | Tel: +61 2 8072 0640 |
SP Angel Corporate Finance LLP Nominated Adviser Jeff Keating Charlie Bouverat | Tel: +44 (0)20 3470 0470 |
Canaccord Genuity Limited Joint Company Broker Raj Khatri James Asensio Harry Rees | Tel: +44 (0) 20 7523 4500 |
Liberum Capital Limited Joint Company Broker Scott Mathieson Edward Thomas Kane Collings | Tel: +44 (0) 20 3100 2000 |
Yellow Jersey PR Limited Henry Wilkinson Dominic Barretto James Lingfield | Tel: +44 (0)20 3004 9512 |
Notes to Editors:
About Atlantic Lithium
Atlantic Lithium is an AIM and ASX-listed lithium company advancing a portfolio of lithium projects in Ghana and Côte d'Ivoire through to production.
The Company's flagship project, the Ewoyaa Project in Ghana, is a significant lithium spodumene pegmatite discovery on track to become Ghana's first lithium-producing mine. The Company signed a funding agreement with Piedmont Lithium Inc. for US
Atlantic Lithium holds 560km2 & 774km2 of tenure across Ghana and Côte d'Ivoire respectively, comprising significantly under-explored, highly prospective licenses.
Appendix 1 - New drill intersections reported in hole ID order, reported at a
Hole ID | Hole target | Deposit | From m | To m | Interval m | Hole depth m | Assay Li2O % | Intersection | Comment | metal content Li x m |
GDD0089 | MEA | Main | 1.2 | 6 | 4.8 | 90.8 | 0.41 | GDD0089: 4.8m at | 1.96 | |
GDD0089 | MEA | Main | 15 | 83 | 68 | 90.8 | 1.37 | GDD0089: 68m at | 92.88 | |
GDD0089 | MEA | Main | 84.9 | 85.9 | 1 | 90.8 | 1.49 | GDD0089: 1m at | 1.49 | |
GDD0090 | IND | NE | 14.3 | 77.9 | 63.6 | 114 | 1.86 | GDD0090: 63.6m at | 118.02 | |
GDD0090 | IND | NE | 79.5 | 97.4 | 17.9 | 114 | 1.36 | GDD0090: 17.9m at | 24.41 | |
GDD0090 | IND | NE | 98.4 | 99.3 | 0.9 | 114 | 1.37 | GDD0090: 0.9m at | 1.23 | |
GDD0091 | IND | NE | 3 | 4 | 1 | 90.8 | 0.70 | GDD0091: 1m at | 0.70 | |
GDD0094 | IND | Main | 12 | 14 | 2 | 95.4 | 0.44 | GDD0094: 2m at | 0.88 | |
GDD0094 | IND | Main | 46 | 67 | 21 | 95.4 | 0.95 | GDD0094: 21m at | 19.97 | |
GDD0094 | IND | Main | 68.6 | 73.5 | 4.9 | 95.4 | 0.41 | GDD0094: 4.9m at | 2.01 | |
GDD0096 | IND | Main | 19 | 21 | 2 | 83.4 | 0.70 | GDD0096: 2m at | 1.39 | |
GDD0096 | IND | Main | 45 | 62 | 17 | 83.4 | 0.95 | GDD0096: 17m at | 16.07 | |
GDD0098 | IND | Main | 38.6 | 63 | 24.4 | 170.4 | 1.72 | GDD0098: 24.4m at | 41.94 | |
GDD0098 | IND | Main | 99.9 | 111.3 | 11.4 | 170.4 | 0.79 | GDD0098: 11.4m at | 9.00 | |
GDD0098 | IND | Main | 111.7 | 119.9 | 8.2 | 170.4 | 0.57 | GDD0098: 8.2m at | 4.70 | |
GDD0098 | IND | Main | 120.4 | 127.5 | 7.1 | 170.4 | 0.48 | GDD0098: 7.1m at | 3.44 | |
GDD0098 | IND | Main | 128.1 | 137.3 | 9.2 | 170.4 | 0.93 | GDD0098: 9.2m at | 8.55 | |
GDD0098 | IND | Main | 141.8 | 143.8 | 2 | 170.4 | 0.45 | GDD0098: 2m at | 0.89 | |
GDD0098 | IND | Main | 147.5 | 148.3 | 0.8 | 170.4 | 0.83 | GDD0098: 0.8m at | 0.66 | |
GRC0755 | EXPL | GrassW | 82 | 89 | 7 | 241 | 1.18 | GRC0755: 7m at | 8.28 | |
GRC0755 | EXPL | GrassW | 172 | 194 | 22 | 241 | 0.53 | GRC0755: 22m at | 11.66 | |
GRC0756 | MEA | Main | 17 | 18 | 1 | 90 | 0.41 | GRC0756: 1m at | 0.41 | |
GRC0756 | MEA | Main | 29 | 89 | 60 | 90 | 1.35 | GRC0756: 60m at | 81.23 | |
GRC0757 | EXPL | NE | 117 | 122 | 5 | 230 | 1.32 | GRC0757: 5m at | 6.59 | |
GRC0757 | EXPL | NE | 127 | 135 | 8 | 230 | 0.82 | GRC0757: 8m at | 6.52 | |
GRC0758 | EXPL | GrassW | 66 | 74 | 8 | 250 | 1.15 | GRC0758: 8m at | 9.23 | |
GRC0758 | EXPL | GrassW | 81 | 83 | 2 | 250 | 0.91 | GRC0758: 2m at | 1.82 | |
GRC0758 | EXPL | GrassW | 173 | 175 | 2 | 250 | 0.85 | GRC0758: 2m at | 1.70 | |
GRC0759A | EXPL | NE | 114 | 131 | 17 | 230 | 1.69 | GRC0759A: 17m at | 28.73 | |
GRC0759A | EXPL | NE | 148 | 166 | 18 | 230 | 1.24 | GRC0759A: 18m at | 22.31 | |
GRC0760 | EXPL | NE | 155 | 182 | 27 | 240 | 1.70 | GRC0760: 27m at | 45.94 | |
GRC0761 | EXPL | NE | 142 | 145 | 3 | 300 | 0.90 | GRC0761: 3m at | 2.69 | |
GRC0761 | EXPL | NE | 233 | 239 | 6 | 300 | 1.30 | GRC0761: 6m at | 7.82 | |
GRC0762 | EXPL | NE | 81 | 88 | 7 | 223 | 1.88 | GRC0762: 7m at | 13.16 | |
GRC0762 | EXPL | NE | 177 | 182 | 5 | 223 | 1.58 | GRC0762: 5m at | 7.89 | |
GRC0762 | EXPL | NE | 185 | 188 | 3 | 223 | 1.67 | GRC0762: 3m at | 5.01 | |
GRC0763 | EXPL | NE | 163 | 189 | 26 | 270 | 1.25 | GRC0763: 26m at | 32.56 | |
GRC0763 | EXPL | NE | 192 | 193 | 1 | 270 | 1.65 | GRC0763: 1m at | 1.65 | |
GRC0764 | EXPL | KPKW | 29 | 31 | 2 | 70 | no significant intersections | weathered pegmatite | ||
GRC0765 | EXPL | KPKW | 38 | 42 | 4 | 60 | no significant intersections | weathered pegmatite | ||
GRC0766 | EXPL | NE | 146 | 148 | 2 | 205 | 1.41 | GRC0766: 2m at | 2.82 | |
GRC0767 | EXPL | KPKW | 80 | 82 | 2 | 100 | no significant intersections | weathered pegmatite | ||
GRC0768 | IND | KPKW | 29 | 39 | 10 | 100 | no significant intersections | weathered pegmatite | ||
GRC0768 | IND | KPKW | 59 | 60 | 1 | 100 | no significant intersections | weathered pegmatite | ||
GRC0769 | EXPL | KPKW | 51 | 97 | 46 | 119 | 0.96 | GRC0769: 46m at | 44.16 | |
GRC0770 | EXPL | KPKW | 58 | 61 | 3 | 180 | no significant intersections | weathered pegmatite | ||
GRC0770 | EXPL | KPKW | 149 | 150 | 1 | 180 | no significant intersections | |||
GRC0771 | EXPL | KPKW | 78 | 82 | 4 | 170 | no significant intersections | weathered pegmatite | ||
GRC0772 | EXPL | NE | 181 | 183 | 2 | 220 | 0.95 | GRC0772: 2m at | 1.90 | |
GRC0773 | IND | KPKW | 41 | 43 | 2 | 60 | 0.45 | GRC0773: 2m at | weathered pegmatite | 0.89 |
GRC0774 | IND | KPKW | 56 | 73 | 17 | 100 | no significant intersections | weathered pegmatite | ||
GRC0775 | EXPL | KPKW | 72 | 92 | 20 | 150 | 1.85 | GRC0775: 20m at | 37.00 | |
GRC0775 | EXPL | KPKW | 117 | 130 | 13 | 150 | 1.91 | GRC0775: 13m at | 24.80 | |
GRC0776 | EXPL | NE | 190 | 200 | 10 | 260 | 1.95 | GRC0776: 10m at | 19.51 | |
GRC0777 | EXPL | KPKW | 108 | 132 | 24 | 180 | 1.42 | GRC0777: 24m at | 34.12 | |
GRC0777 | EXPL | KPKW | 140 | 154 | 14 | 180 | 1.89 | GRC0777: 14m at | 26.42 | |
GRC0778 | EXPL | KPKW | 35 | 40 | 5 | 60 | no significant intersections | weathered pegmatite | ||
GRC0779 | EXPL | NE | 137 | 151 | 14 | 272 | 1.43 | GRC0779: 14m at | 19.98 | |
GRC0780 | IND | KPKW | 55 | 57 | 2 | 85 | 2.04 | GRC0780: 2m at | 4.08 | |
GRC0781 | IND | KPKW | 80 | 88 | 8 | 110 | 1.74 | GRC0781: 8m at | 13.95 | |
GRC0782 | EXPL | KPKW | 54 | 59 | 5 | 102 | no significant intersections | weathered pegmatite | ||
GRC0782 | EXPL | KPKW | 72 | 74 | 2 | 102 | no significant intersections | |||
GRC0782 | EXPL | KPKW | 79 | 80 | 1 | 102 | no significant intersections | |||
GRC0782 | EXPL | KPKW | 83 | 85 | 2 | 102 | no significant intersections | |||
GRC0783 | EXPL | KPKW | 70 | 71 | 1 | 100 | 0.66 | GRC0783: 1m at | 0.66 | |
GRC0784 | EXPL | KPKW | 51 | 53 | 2 | 76 | 0.64 | GRC0784: 2m at | 1.27 | |
GRC0785 | EXPL | NE | 111 | 146 | 35 | 190 | 1.48 | GRC0785: 35m at | 51.68 | |
GRC0786 | EXPL | KPKW | 70 | 72 | 2 | 100 | 1.18 | GRC0786: 2m at | 2.36 | |
GRC0787 | EXPL | KPKW | 90 | 94 | 4 | 114 | no significant intersections | |||
GRC0788 | EXPL | KPKN | 80 | no pegmatite intercepted | ||||||
GRC0789 | EXPL | KPKN | 120 | no pegmatite intercepted | ||||||
GRC0790 | EXPL | NE | 31 | 32 | 1 | 190 | no significant intersections | |||
GRC0790 | EXPL | NE | 130 | 134 | 4 | 190 | no significant intersections | |||
GRC0790 | EXPL | NE | 144 | 154 | 10 | 190 | no significant intersections | |||
GRC0791 | EXPL | KPKN | 108 | 109 | 1 | 132 | 1.75 | GRC0791: 1m at | 1.75 | |
GRC0792 | EXPL | KPKN | 170 | no pegmatite intercepted | ||||||
GRC0793 | EXPL | NE | 200 | 205 | 5 | 280 | 1.29 | GRC0793: 5m at | 6.43 | |
GRC0794 | EXPL | KPKN | 108 | no pegmatite intercepted | ||||||
GRC0795 | EXPL | KPKN | 90 | no pegmatite intercepted | ||||||
GRC0796 | EXPL | Main | 237 | 248 | 11 | 300 | 1.32 | GRC0796: 11m at | 14.53 | |
GRC0797 | EXPL | NE | 350 | no pegmatite intercepted | ||||||
GRC0798 | EXPL | Main | 243 | 248 | 5 | 322 | 1.13 | GRC0798: 5m at | 5.64 | |
GRC0798 | EXPL | Main | 254 | 267 | 13 | 322 | 1.16 | GRC0798: 13m at | 15.09 | |
GRC0799 | EXPL | NE | 182 | 194 | 12 | 210 | 0.99 | GRC0799: 12m at | 11.92 | |
GRC0800 | EXPL | Main | 263 | 286 | 23 | 347 | 1.00 | GRC0800: 23m at | 23.01 | |
GRC0800 | EXPL | Main | 294 | 296 | 2 | 347 | 1.21 | GRC0800: 2m at | 2.41 | |
GRC0801 | EXPL | Main | 246 | 255 | 9 | 363 | no significant intersections | |||
GRC0801 | EXPL | Main | 341 | 349 | 8 | 363 | no significant intersections | |||
GRC0802 | EXPL | Main | 212 | 219 | 7 | 350 | 0.90 | GRC0802: 7m at | 6.28 | |
GRC0803 | EXPL | KPKN | 34 | 37 | 3 | 100 | 0.95 | GRC0803: 3m at | 2.84 | |
GRC0803 | EXPL | KPKN | 40 | 45 | 5 | 100 | 0.92 | GRC0803: 5m at | 4.58 | |
GRC0804 | EXPL | Main | 2 | 12 | 10 | 386 | no significant intersections | weathered pegmatite | ||
GRC0804 | EXPL | Main | 351 | 368 | 17 | 386 | no significant intersections | |||
GRC0804 | EXPL | Main | 379 | 380 | 1 | 386 | no significant intersections | |||
GRC0804 | EXPL | Main | 385 | 386 | 1 | 386 | no significant intersections | |||
GRC0805 | EXPL | KPKN | 72 | 79 | 7 | 119 | 1.26 | GRC0805: 7m at | 8.80 | |
GRC0806 | EXPL | KPKN | 27 | 34 | 7 | 120 | no significant intersections | weathered pegmatite | ||
GRC0806 | EXPL | KPKN | 52 | 54 | 2 | 120 | no significant intersections | |||
GRC0807 | EXPL | KPKN | 51 | 56 | 5 | 110 | 0.83 | GRC0807: 5m at | 4.13 | |
GRC0807 | EXPL | KPKN | 60 | 61 | 1 | 110 | 0.40 | GRC0807: 1m at | 0.40 | |
GRC0808 | EXPL | KPKN | 36 | 42 | 6 | 80 | no significant intersections | weathered pegmatite | ||
GRC0809 | EXPL | Main | 256 | 266 | 10 | 340 | 0.91 | GRC0809: 10m at | 9.14 | |
GRC0810 | EXPL | KPKN | 67 | 68 | 1 | 110 | 1.01 | GRC0810: 1m at | 1.01 |
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
SOURCE: Atlantic Lithium Limited
View source version on accesswire.com:
https://www.accesswire.com/729159/Atlantic-Lithium-Limited-Announces-High-Grade-Drill-Results--Highest-Grade-to-Date
FAQ
What are the recent assay results from Atlantic Lithium's Ewoyaa Lithium Project?
What is the projected financial performance for Atlantic Lithium's Ewoyaa Project?
When will Atlantic Lithium update its resource estimate?
How much drilling has Atlantic Lithium completed at the Ewoyaa Project?