Talisker Intercepts High Grade Gold on the 52 Vein Across 660 Metres of Strike Length
Talisker Resources Ltd. (TSKFF) has reported high-grade gold drill results from its Bralorne Gold Project, with significant findings including 55.25 g/t Au over 1.3 metres in hole SB-2021-090 and 23.58 g/t Au over 1.80 metres in hole SB-2021-087. These results confirm extensive mineralization along a 660-metre strike length of the 52 vein. The ongoing drilling efforts have totaled 104,162 metres across 197 holes since February 2020. Talisker is optimistic about the potential of the 52 vein as a major ore body for future resource estimates.
- High-grade gold intercepts reported, including 55.25 g/t Au and 23.58 g/t Au.
- Extensive mineralization confirmed along a 660-metre strike length.
- Total drilling since February 2020 reaches 104,162 metres, enhancing resource potential.
- None.
TORONTO, ON / ACCESSWIRE / January 25, 2022 / Talisker Resources Ltd. ("Talisker" or the "Company") (TSX:TSK)(OTCQX:TSKFF) is pleased to announce high-grade results from multiple drill holes highlighted by 55.25 g/t Au over 1.3 metres (SB-2021-090) and 23.58 g/t Au over 1.80 metres within 5.26 g/t Au over 8.90 metres (SB-2021-087) on the 52 Vein at its
Key Points:
- The drill holes in this release are located within the Bralorne East Complex.
- All three drill holes in this release intersected the 52 vein over a 660-metre strike length.
- Hole SB-2021-090 intersected the 52 vein highlighted by 55.25 g/t Au over 1.30 metres and the J vein which intersected 10.10 g/t Au over 0.55 metres.
- SB-2021-087 intersected the 52 vein highlighted by 23.85 g/t Au over 1.80 metres within 5.26 g/t Au over 8.90 metres.
- Hole SB-2021-085 intersected the 52 vein highlighted by 14.13 g/t Au over 2.50 metres and a New vein highlighted by 7.59 g/t Au over 1.45 metres.
- The previous drilling on the 52 vein returned high-grade assays highlighted by hole SB-2021-069 which returned 10.09 g/t Au over 4.35 metres and SB-2021-030 which returned 19.95g/t Au over 1.00 metres.
Terry Harbort, CEO of Talisker, commented, "These three holes confirm high grade mineralization over a significant strike length, highlighting the extensive vein continunity known as one of the defining characteristics of the Bralorne deposit. We are very pleased with the consistency of the gold mineralization intercepted in this structure and see the 52 vein building to one of the important ore bodies of our upcoming resource."
Six diamond drills and 1 RC drill are currently operating at Bralorne. A total of 104,162 metres (197 holes) has been completed since Talisker initiated drilling at the Project in February 2020. 26,365 samples are currently at the assay laboratory and are expected to be received by the Company shortly.
Hole Descriptions:
SB-2021-085
- Located in the Bralorne East Block and hosted in dioritic intrusive
- New vein intersected from 296.25 to 299.00 m
- 52 vein intersected from 387.00 to 389.50 m hosting visible gold
SB-2021-087
- Located in the Bralorne East Block and hosted in granitic intrusive
- 51 BFW vein intersected from 298.50 to 300 m
- 52 vein intersected from 495.20 to 497.00 m
- New vein intersected from 659.55 to 660.80 m
SB-2021-090
- Located in the Pioneer Block and hosted in volcanics
- 52 vein intersected from 190.00 to 191.30 m hosting visible gold
- J vein intersected from 598.65 to 599.75 m
Complete results have been received for all reported holes as outlined in Table 1 below. All major vein structures intersected and reported in this release are considered to be classic Bralorne crack-seal quartz-carbonate veins. The veins display densely banded sulphide septae, hosting fine-grained arsenopyrite and pyrite mineralization with strong silica-sericite alteration halos. All reported drill assay results are available on the Company's website at the following link: https://taliskerresources.com/bralorne-gold-project-released-drill-results/.
Table 1: Bralorne Gold Project - Drill Holes SB-2021-085, 087, 090 | ||||||
---|---|---|---|---|---|---|
Diamond Drill | From | To | Interval | Au | Zone | Method Reported |
SB-2021-085 | 296.25 | 297.7 | 1.45 | 7.59 | New vein | Au-SCR24 |
SB-2021-085 | 297.7 | 298.5 | 0.8 | 0.32 | Au-AA26 | |
SB-2021-085 | 298.5 | 299 | 0.5 | 3.72 | Au-SCR24 | |
SB-2021-085 | 387 | 387.5 | 0.5 | 7.75 | 52 Vein | Au-SCR24 |
SB-2021-085 | 387.5 | 388 | 0.5 | 29.60 | Au-SCR24 | |
SB-2021-085 | 388 | 388.5 | 0.5 | 5.84 | Au-SCR24 | |
SB-2021-085 | 388.5 | 389 | 0.5 | 2.35 | Au-SCR24 | |
SB-2021-085 | 389 | 389.5 | 0.5 | 25.10 | Au-SCR24 | |
SB-2021-087 | 294.65 | 295.15 | 0.5 | 0.35 | 51BFW Vein | Au-AA26 |
SB-2021-087 | 295.15 | 295.65 | 0.5 | 1.06 | Au-SCR24 | |
SB-2021-087 | 295.65 | 296.15 | 0.5 | 1.09 | Au-SCR24 | |
SB-2021-087 | 296.15 | 296.98 | 0.83 | 0.79 | Au-SCR24 | |
SB-2021-087 | 296.98 | 297.5 | 0.52 | 0.49 | Au-SCR24 | |
SB-2021-087 | 297.5 | 298 | 0.5 | 1.45 | Au-SCR24 | |
SB-2021-087 | 298 | 298.5 | 0.5 | 0.59 | Au-SCR24 | |
SB-2021-087 | 298.5 | 299.1 | 0.6 | 7.69 | Au-SCR24 | |
SB-2021-087 | 299.1 | 300 | 0.9 | 0.90 | Au-SCR24 | |
SB-2021-087 | 300 | 301 | 1 | 0.25 | Au-SCR24 | |
SB-2021-087 | 301 | 302 | 1 | 0.10 | Au-SCR24 | |
SB-2021-087 | 302 | 303 | 1 | 0.20 | Au-SCR24 | |
SB-2021-087 | 303 | 303.5 | 0.5 | 0.21 | Au-SCR24 | |
SB-2021-087 | 303.5 | 304 | 0.5 | 0.10 | Au-SCR24 | |
SB-2021-087 | 495.2 | 495.72 | 0.52 | 80.90 | 52 Vein | Au-AA26 |
SB-2021-087 | 495.72 | 497 | 1.28 | 0.30 | Au-AA26 | |
SB-2021-087 | 497 | 498 | 1 | 0.26 | Au-AA26 | |
SB-2021-087 | 498 | 499 | 1 | 0.09 | Au-AA26 | |
SB-2021-087 | 499 | 500 | 1 | 0.41 | Au-AA26 | |
SB-2021-087 | 500 | 501.1 | 1.1 | 1.07 | Au-AA26 | |
SB-2021-087 | 501.1 | 502 | 0.9 | 0.26 | Au-AA26 | |
SB-2021-087 | 502 | 503 | 1 | 0.33 | Au-AA26 | |
SB-2021-087 | 503 | 503.6 | 0.6 | 2.28 | Au-AA26 | |
SB-2021-087 | 659.55 | 660.25 | 0.7 | 8.21 | New Vein | Au-SCR24 |
SB-2021-087 | 660.25 | 660.8 | 0.55 | 0.16 | Au-AA26 | |
SB-2021-090 | 190 | 190.75 | 0.75 | 0.07 | 52 Vein | Au-AA26 |
SB-2021-090 | 190.75 | 191.3 | 0.55 | 130.50 | Au-SCR24 | |
SB-2021-090 | 598.65 | 599.2 | 0.55 | 0.41 | J Vein | Au-AA26 |
SB-2021-090 | 599.2 | 599.75 | 0.55 | 10.10 | Au-SCR24 | |
| ||||||
Notes: Diamond drill hole SB-2021-085 has collar orientation of Azimuth 177; Dip -45. Diamond drill hole SB-2021-087 has a collar orientation of Azimuth 177; Dip -47. Diamond drill hole SB-2021-090 has a collar orientation of Azimuth 176; Dip -63. True widths are estimated at 40 - |
Talisker is providing an opportunity for shareholders and other interested parties to participate in a Webinar to be held at 4:15 pm ET on Tuesday, January 25th. To register, please click on the following link - https://bit.ly/33IKH9w.
Qualified Person
The technical information contained in this news release relating to the drill results at the Bralorne Gold Project has been approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker's Vice President, Exploration and Resource Development, who is a "qualified person" within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.
About Talisker Resources Ltd.
Talisker (taliskerresources.com) is a junior resource company involved in the exploration of gold projects in British Columbia, Canada. Talisker's projects include two advanced stage projects, the Bralorne Gold Complex and the Ladner Gold Project, both advanced stage projects with significant exploration potential from historical high-grade producing gold mines, as well as its Spences Bridge Project where the Company holds ~
For further information, please contact:
Terry Harbort
President and CEO
Terry.harbort@taliskerresources.com
+1 416 361 2808
Sample Preparation and QAQC
Drill core at the Bralorne project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm respectively). Drill core samples are minimum 50 cm and maximum 160 cm long along the core axis. Samples are focused on an interval of interest such as a vein or zone of mineralization. Shoulder samples bracket the interval of interest such that a total sampled core length of not less than 3m both above and below the interval of interest must be assigned. Sample QAQC measures of unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and make up
Caution Regarding Forward-Looking Information
Certain statements contained in this press release constitute forward-looking information. These statements relate to future events or future performance. The use of any of the words "could", "intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker's current belief or assumptions as to the outcome and timing of such future events. Actual future results may differ materially. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker's management, there can be no assurance that any conclusions or forecasts will prove to be accurate.
While Talisker considers these statements to be reasonable based on information currently available, they may prove to be incorrect. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include market risks and the demand for securities of the Company, risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and supply of minerals, risks related to increased competition and current global financial conditions and the COVID-19 pandemic, access and supply risks, reliance on key personnel, operational risks, and regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks.
The forward-looking information contained in this news release is made as of the date hereof, and Talisker is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.
Figure 1: SB-2021-085 hole location within the Bralorne East Block.
Figure 2: SB-2021-087 hole location within the Bralorne East Block.
Figure 3: SB-2021-090 hole location within the Pioneer Block.
Figure 4: SB-2021-085, 087 and 090 cross section with vein intersections and grade.
SOURCE: Talisker Resources Ltd.
View source version on accesswire.com:
https://www.accesswire.com/685295/Talisker-Intercepts-High-Grade-Gold-on-the-52-Vein-Across-660-Metres-of-Strike-Length
FAQ
What were the gold grades reported by Talisker Resources on January 25, 2022?
How many drill holes were reported in the January 25, 2022 press release from Talisker Resources?
What is the significance of the 52 vein at Bralorne Gold Project?
When did Talisker Resources start drilling at the Bralorne Gold Project?