Spod Lithium Corp. Samples 1.5% Li20 at Niemi Pegmatite Project
VANCOUVER, British Columbia, July 13, 2023 (GLOBE NEWSWIRE) -- SPOD LITHIUM CORP. (“SPOD” or the “Company”) (CSE: SPOD) (OTCQB:SPODF) has provided an update on the 2023 Phase I surface exploration program for its
The Phase I program is designed to target spodumene bearing pegmatite bodies on our expansive land package in the heart of the prolific Georgia Lake Pegmatite Field. The program covers the Niemi Block, North Nipigon Block A and North Nipigon Block C (Figure 1). The program will continue to evaluate the historically underexplored Block B, Block C and Block A east of Rock Tech Lithium’s Georgia Lake deposit. Detailed mapping and sampling of the Parole Lake area will also be prioritized to determine the source of the spodumene bearing boulders. A total of 107 surface grab samples have been collected to date and submitted to the Actlabs facility in Thunder Bay, ON.
Chris Cooper, Spod Lithium’s CEO commented: “The North Nipigon – Niemi Project is beginning to show its real potential with
The North Nipigon – Niemi Project is underlain by Archean metasediments and granites, along with Keweenawan age diabase. Pegmatites in the region occur close to and within the granitic plutons. The Project is contiguous with RockTech Lithium’s Georgia Lake Project and Imagine Lithium’s Jackpot Lithium Project. RockTech’s Project contains a NI43-101 compliant indicated resource of 10.6 Mt at
https://www.globenewswire.com/NewsRoom/AttachmentNg/4b668f1d-1247-4197-954d-914521bed305
Figure 1 shows the North Nipigon – Niemi Project with Rock Tech and Imagine Lithium’s developing deposits.
Assay results have been returned for the first series of 107 surface grab samples collected from the Project (Table 1). The Niemi Block continues to deliver lithium results on trend with Imagine Lithium’s Jackpot Zone that returned
Table 1 Summary of lithium results from the initial prospecting program on the property.
Sample | Easting | Northing | Area | Li (ppm) | Li2O (%) | Cs (ppm) | Ta (ppm) | Be (ppm) | Ba (ppm) |
475539 | 434345 | 5461301 | Niemi Pegmatite | 7000 | 1.507 | 22.9 | 8.1 | 760 | 20 |
475550 | 433272 | 5473382 | Parole Lake (AFRI 20000019444) | 4020 | 0.866 | 87.3 | 25.2 | 126 | 15 |
475551 | 433272 | 5473382 | Parole Lake (AFRI 20000019444) | 1920 | 0.413 | 49.1 | 49 | 315 | 20 |
475577 | 433184 | 5473319 | Parole Lake - New Boulder | 2500 | 0.538 | 97.2 | 23.4 | 13 | 141 |
https://www.globenewswire.com/NewsRoom/AttachmentNg/1c32fa90-32ba-4471-a4ba-7b6287f53829
Figure 2 shows the Niemi Project samples with Imagine Lithium’s Jackpot Project to the west.
The North Nipigon Block A prospecting program continues to develop a lithium target on the northern edge of Parole Lake where confirmation sampling of a spodumene rich boulder returned
https://www.globenewswire.com/NewsRoom/AttachmentNg/f46066cb-bafb-479c-91ce-670421ef610d
Figure 3 shows North Nipigon Block A boulders on the north shore of Parole Lake.
JAMES BAY QUEBEC
The Company is eager to begin its planned exploration program on its Megali and Lithium Grande 4 projects. The recent restrictions imposed by the Quebec government, because of the regional forest fire situation, is directly impacting exploration operations, and, therefore, the company is temporarily delayed in kicking off its surface exploration field activities until the situation improves. The company is actively monitoring the situation to ensure all company activities are compliant with respective governmental decrees and to ensure the safety of personnel associated with the property. The company will provide further updates as information becomes available.
Qualified person
Jason Arnold, P.Geo., President of DCX Geological Consulting and an independent Qualified Person as such term is defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and approved the geological information reported in this news release. The Qualified Person has not completed sufficient work to verify the historic information on the Property and in the vicinity, particularly regarding historical drill results, historical mine production and historical grab samples.
However, the Qualified Person believes that these results were completed to industry standard practices. The information provides an indication of the exploration potential of the Property but may not be representative of expected results. Also, mineralization hosted on adjacent and/or nearby properties, particularly with respect to neighbouring mineral resources, is not necessarily indicative of mineralization hosted on the Company’s property.
About Spod Lithium Corp.
Spod Lithium Corp. is a mineral exploration company focused on the acquisition and development of mineral properties containing battery, base, and precious metals. The Company’s flagship assets are its Lithium properties located in the James Bay region of Quebec and the Nipigon and Niemi region of Ontario, Canada. For further information, please refer to the Company’s disclosure record on SEDAR (www.sedar.com) or contact the Company through its website at www.spodlithiumcorp.com or by telephone at 604.721-3000.
On Behalf of the Board of Directors
Chris Cooper
Chief Executive Officer
Forward-Looking Information
Certain statements in this news release are forward-looking statements, including with respect to future plans, and other matters. Forward-looking statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations or intentions regarding the future. Such information can generally be identified by the use of forwarding-looking wording such as “may”, “expect”, “estimate”, “anticipate”, “intend”, “believe” and “continue” or the negative thereof or similar variations. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of which are beyond the control of the Company, including but not limited to, business, economic and capital market conditions, the ability to manage operating expenses, and dependence on key personnel. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, anticipated costs, and the ability to achieve goals. Factors that could cause the actual results to differ materially from those in forward-looking statements include, the continued availability of capital and financing, litigation, failure of counterparties to perform their contractual obligations, loss of key employees and consultants, and general economic, market or business conditions. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on any forward-looking information.
The forward-looking statements contained in this news release are made as of the date of this news release. Except as required by law, the Company disclaims any intention and assumes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.
The CSE has not reviewed, approved or disapproved the contents of this news release.