STOCK TITAN
The best stock market news and trading tools all in one place—your must-have platform for investing success.
A must-have platform for stock market information, offering the best tools and updates to supercharge your trading.
Your trusted source for the best stock market news, trading tools, and expert advice. Everything traders need, in one place.

Silver Elephant Plans to Announce Minago Nickel Project Mineral Resource Estimate in June For Nickel Spinout

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

Silver Elephant Mining Corp. (OTCQX:SILEF) has announced the commissioning of an independent Mineral Resource Estimate for its Minago nickel project in Manitoba, Canada. The project will be assessed by Mercator Geological Services, AGP Mining, and Stantec, with completion expected in June 2021. The Minago project covers 197 km² within the Thompson Nickel Belt, which has produced over 5 billion pounds of nickel since 1958. Silver Elephant is actively studying existing permits and plans to update the Environmental Impact Statement.

Positive
  • Independent Mineral Resource Estimate commissioned for Minago project.
  • Completion expected by June 2021, supporting future spin-out.
  • Minago project is in the nickel-rich Thompson Nickel Belt.
Negative
  • Minago is considered a non-material asset to the Company.

VANCOUVER, BC / ACCESSWIRE / May 17, 2021 / Silver Elephant Mining Corp. ("Silver Elephant" or "the Company") (TSX:ELEF, OTCQX:SILEF, Frankfurt:1P2N) announces that the Company and its wholly owned Canadian subsidiary Flying Nickel Mining Corp. ("Flying Nickel") have commissioned an independent Mineral Resource Estimate ("MRE") in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") for the Minago nickel project ("Minago") located in Manitoba, Canada.

The MRE will be prepared in collaboration between Mercator Geological Services Limited ("Mercator"), AGP Mining Consultants ("AGP") and Stantec and is expected to be completed in June, 2021 to support the proposed Flying Nickel spin-out.

The Silver Elephant acquired Minago in February 2021 (refer to news release dated February 9th, 2021).

About the Minago Project

Minago spans over 197 km2. and is located in the Thompson Nickel Belt (TNB) in Manitoba, which is the fifth-largest nickel-bearing geological belt in the world. There has been over 5 billion pounds of nickel production at TNB since 1958. Manitoba Provincial Highway 6 and a high-voltage (230 kV) transmission line both transect the Minago project. Vale currently mines and produces nickel concentrates in Thompson at the heart of the TNB, 270 km northeast of the project. Their nickel concentrates are shipped by rail to its Sudbury smelter for further processing.

To date, past investments of over $35 million has been invested at Minago with over 74,000 meters of historic exploration drilling, with drill result highlights as follows:

Hole No
From (m)
To (m)
Int (m)
Ni%
V-10-11
161.5
353.2
191.7
0.51
V-10-16
176.0
320.3
144.3
0.85
V-08-06
537.7
676.7
139.0
0.73
V-08-06
132.2
265.3
133.1
0.62
V-10-15
109.5
228.0
118.5
0.82
V-08-04B
361.7
471.0
109.2
0.76
N-05-01
143.7
251.0
107.3
0.80
MXB-71-94
177.4
282.2
104.9
0.73
V-10-26
269.2
358.8
89.5
0.86
NM-06-02
293.3
364.2
70.9
1.21
Hole No
From (m)
To (m)
Int (m)
Ni%
N-05-01
325.3
391.2
65.9
1.08
V-10-18
351.0
409.1
58.1
1.67
B-12A-89
322.2
372.5
50.3
1.23
V-08-01
452.2
490.6
38.4
1.51

Reported widths are core-interval widths and not true widths. True widths have not determined. Drilling was conducted by previous operators from 2010 and earlier. Minago is considered as a non-material asset to the Company.

In 2011, an Environmental Impact Statement (EIS) submitted by the previous operator was approved by the Manitoba government for a 10,000-tonnes-per-day open-pit operation at Minago. The Company is studying which of these permits are still in good standing and is undertaking to update the EIS as necessary in 2021.

Qualified Person

The technical contents of this news release have been prepared under the supervision of Danniel Oosterman, VP Exploration. Mr. Oosterman is not independent of the Company in that he is employed by it. Mr. Oosterman is a qualified person ("QP") as defined by the guidelines in NI 43-101.

About Silver Elephant

Silver Elephant Mining Corp. is a premier silver mining and exploration company.

Further information on Silver Elephant can be found at www.silverelef.com.

SILVER ELEPHANT MINING CORP.

ON BEHALF OF THE BOARD

"John Lee"
Executive Chairman

For more information about Silver Elephant, please contact Investor Relations:
+1.604.569.3661 ext. 101
ir@silverelef.com www.silverelef.com

Neither the Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Toronto Stock Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

Certain statements contained in this news release, including statements which may contain words such as "expects", "anticipates", "intends", "plans", "believes", "estimates", or similar expressions, and statements related to matters which are not historical facts are forward-looking information within the meaning of applicable securities laws. Such forward-looking statements, which reflect management's expectations regarding Company's future growth, results of operations, performance, and business prospects and opportunities, are based on certain factors and assumptions and involve known and unknown risks and uncertainties which may cause the actual results, performance, or achievements to be materially different from future results, performance, or achievements expressed or implied by such forward-looking statements.

These factors should be considered carefully, and readers should not place undue reliance on the Company's forward-looking statements. The Company believes that the expectations reflected in the forward-looking statements contained in this news release and the documents incorporated by reference herein are reasonable, but no assurance can be given that these expectations will prove to be correct. In addition, although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events, or results not to be as anticipated, estimated, or intended. The Company undertakes no obligation to publicly release any future revisions to forward-looking statements to reflect events or circumstances after the date of this news or to reflect the occurrence of unanticipated events, except as expressly required by law.

SOURCE: Silver Elephant Mining Corp.



View source version on accesswire.com:
https://www.accesswire.com/647697/Silver-Elephant-Plans-to-Announce-Minago-Nickel-Project-Mineral-Resource-Estimate-in-June-For-Nickel-Spinout

FAQ

What is the Mineral Resource Estimate for the Minago project?

The Mineral Resource Estimate for the Minago nickel project is being conducted by Mercator Geological Services, AGP Mining, and Stantec, expected to be completed in June 2021.

When will the Mineral Resource Estimate for Minago be completed?

The Mineral Resource Estimate is expected to be completed in June 2021.

What is the significance of the Minago project to Silver Elephant Mining?

The Minago project is considered a non-material asset to Silver Elephant Mining, but it is part of their strategy for a potential spin-out.

What is the location of the Minago project?

The Minago project is located in Manitoba, Canada, within the Thompson Nickel Belt.

What is the stock symbol for Silver Elephant Mining Corp?

The stock symbol for Silver Elephant Mining Corp is OTCQX:SILEF.

SILVER ELEPHANT MNG CORP

OTC:SILEF

SILEF Rankings

SILEF Latest News

SILEF Stock Data

10.99M
29.52M
22.26%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Vancouver