Canadian Critical Minerals Provides Up-Date on Thierry Drill Program
Calgary, Alberta--(Newsfile Corp. - July 18, 2023) - Canadian Critical Minerals Inc. (TSXV: CCMI) (OTCQB: RIINF) ("Canadian Critical Minerals" or the "Company") is pleased to provide an update on the exploration drilling program which began at the Thierry Mine Project near Pickle Lake, Ontario on July 6, 2023. To-date the Company has completed four NQ diamond drill holes and 1,229 metres of drilling with all holes encountering visual mineralization including copper, nickel and zinc. The Company cautions readers that visual identification of mineralization does not guarantee, or replace, assay results. Assay results may not meet or exceed results from earlier drill programs. Drill core samples have been selected for assay and the results will be reported once available.
The 2023 summer program is designed for approximately 2,500 metres of diamond drilling and will focus on expanding upon the K1-1 deposit which is a large tonnage, near surface deposit located approximately 3 km east of the past producing Thierry Mine. The K1-1 deposit has a current Inferred Mineral Resource within an optimized Whittle pit shell consisting of the following: 53,614,000 tonnes grading
CCM-23-51 Complete
CCM-23-51 was collared approximately 60 metres south and 20 metres east of K-11-09 which was previously drilled by Cadillac Ventures in 2011. (See press release on SEDAR by Cadillac Ventures of August 9, 2011). K-11-09 yielded 105 metres at
CCM-23-52 Complete
CCM-23-52 was collared approximately 80 metres north of K-11-10 which was previously drilled by Cadillac Ventures in 2011. (See press release on SEDAR by Cadillac Ventures of August 16, 2011). K-11-10 yielded 157 metres at
CCM-23-53 Complete
CCM-23-53 was collared approximately 60 metres south of K-11-27 which was previously drilled by Cadillac Ventures in 2011. (See press release on SEDAR by Cadillac Ventures of January 25, 2012). K-11-27 yielded 178 metres at
CCM-23-54 Complete
CCM-23-54 was collared approximately 160 metres north of K-11-01 which was previously drilled by Cadillac Ventures in 2011. (See press release on SEDAR by Cadillac Ventures of May 5, 2011). K-11-01 yielded 27 metres at
Figure 1 - Plan map of historic and current/ongoing DDH at K1-1.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2187/173977_dc3b98b36423f97a_001full.jpg
Ian Berzins, President and CEO commented, "Our geological team, led by Brian Newton, is pleased with the visual observation of copper, nickel and zinc mineralization in all four holes of our 2023 drilling program at the Thierry Mine project that is focused on expanding the K1-1 deposit. All four holes have identified mineralized structures consistent with our current Resource model. We believe there is significant potential to expand upon the current Inferred Resource at K1-1."
Qualified person
CCMI's disclosure of a technical or scientific nature in this news release has been reviewed and approved by Brian H. Newton P.Geo., of Minroc Management Limited who serves as a Consultant to the Company and is a Qualified Person under the definition of National Instrument 43-101.
About Canadian Critical Minerals Inc.
Canadian Critical Minerals Inc. is a mining company primarily focused on two near-term copper production assets in Canada. CCMI's main asset is the
Contact Information
Canadian Critical Minerals Inc.
Ian Berzins
President & Chief Executive Officer
M: +1-403-512-8202
E: iberzins@canadiancriticalmineralsinc.com
Website: www.canadiancriticalmineralsinc.com
Caution Regarding Forward-Looking Information
This news release includes certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, future work programs and objectives and expected results from such work programs. Forward-looking information necessarily involve known and unknown risks, including, without limitation, risks associated with general economic conditions; inability to access sufficient capital from internal and external sources, and/or inability to access sufficient capital on favourable terms; and other risks.
Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information and the risks identified in the Company's continuous disclosure record. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this news release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this new release.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/173977