STOCK TITAN

Premium Resources Infill Drilling at Selebi Delivers Grades Significantly Higher than Mineral Resource Estimate 27.55 Metres of 4.97% CuEq

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

Premium Resources (PRMLF) has announced significant high-grade assay results from resource reclassification drilling at its Selebi North underground mine in Botswana. The drilling program, encompassing ~34,300 metres over 80 holes, revealed notable findings including:

Key highlight from SNUG-24-174: South Limb showed 27.55 metres of 4.97% CuEq (2.14% Cu, 1.38% Ni, 0.07% Co), while SNUG-24-146: South Limb demonstrated 13.15 metres of 4.59% CuEq (1.19% Cu, 1.65% Ni, 0.08% Co).

The company has completed its infill drill program and is now shifting focus to high-impact resource growth through an accelerated expansion drilling strategy, targeting areas with strong geophysical indicators of massive sulphides and high-grade mineralization.

Premium Resources (PRMLF) ha annunciato risultati significativi di analisi ad alto tenore derivanti da perforazioni di riclassificazione delle risorse nella sua miniera sotterranea di Selebi North in Botswana. Il programma di perforazione, che ha coperto circa 34.300 metri su 80 fori, ha rivelato risultati importanti tra cui:

Il punto saliente di SNUG-24-174: South Limb ha mostrato 27,55 metri con un contenuto equivalente di rame (CuEq) del 4,97% (2,14% Cu, 1,38% Ni, 0,07% Co), mentre SNUG-24-146: South Limb ha riportato 13,15 metri con un contenuto equivalente di rame del 4,59% (1,19% Cu, 1,65% Ni, 0,08% Co).

L’azienda ha completato il programma di perforazioni di infill e ora si concentra sulla crescita delle risorse ad alto impatto tramite una strategia accelerata di perforazioni di espansione, mirando a zone con forti indicatori geofisici di solfuri massivi e mineralizzazioni ad alto tenore.

Premium Resources (PRMLF) ha anunciado resultados significativos de ensayos de alta ley provenientes de perforaciones de reclasificación de recursos en su mina subterránea Selebi North en Botswana. El programa de perforación, que abarcó aproximadamente 34,300 metros en 80 perforaciones, reveló hallazgos destacados, entre ellos:

El punto clave de SNUG-24-174: South Limb mostró 27,55 metros con un 4,97% de CuEq (2,14% Cu, 1,38% Ni, 0,07% Co), mientras que SNUG-24-146: South Limb presentó 13,15 metros con un 4,59% de CuEq (1,19% Cu, 1,65% Ni, 0,08% Co).

La compañía ha finalizado su programa de perforación de relleno y ahora se enfoca en un crecimiento de recursos de alto impacto mediante una estrategia acelerada de perforación de expansión, apuntando a áreas con fuertes indicadores geofísicos de sulfuros masivos y mineralización de alta ley.

Premium Resources (PRMLF)는 보츠와나의 Selebi North 지하 광산에서 자원 재분류 시추를 통해 고등급 분석 결과를 발표했습니다. 약 34,300미터, 80개 구멍에 걸친 시추 프로그램에서 다음과 같은 주목할 만한 결과가 나왔습니다:

SNUG-24-174: South Limb에서 27.55미터 구간에 4.97% CuEq(구리 2.14%, 니켈 1.38%, 코발트 0.07%)가 확인되었으며, SNUG-24-146: South Limb에서는 13.15미터 구간에 4.59% CuEq(구리 1.19%, 니켈 1.65%, 코발트 0.08%)가 나타났습니다.

회사는 인필 시추 프로그램을 완료했으며, 현재는 대규모 황화광물 및 고등급 광화 작용의 강력한 지구물리학적 지표가 있는 지역을 대상으로 가속화된 확장 시추 전략을 통해 고효과 자원 증대에 집중하고 있습니다.

Premium Resources (PRMLF) a annoncé des résultats significatifs d’analyses de haute teneur issus des forages de reclassification des ressources dans sa mine souterraine de Selebi North au Botswana. Le programme de forage, couvrant environ 34 300 mètres répartis sur 80 trous, a révélé des découvertes notables, notamment :

Le point fort de SNUG-24-174 : South Limb a montré 27,55 mètres à 4,97 % CuEq (2,14 % Cu, 1,38 % Ni, 0,07 % Co), tandis que SNUG-24-146 : South Limb a présenté 13,15 mètres à 4,59 % CuEq (1,19 % Cu, 1,65 % Ni, 0,08 % Co).

L’entreprise a terminé son programme de forage de comblement et se concentre désormais sur une croissance des ressources à fort impact grâce à une stratégie accélérée de forage d’expansion, ciblant des zones présentant de forts indicateurs géophysiques de sulfures massifs et de minéralisation à haute teneur.

Premium Resources (PRMLF) hat bedeutende hochgradige Probenergebnisse aus der Ressourcenumklassifizierungsbohrung in seiner unterirdischen Selebi North Mine in Botswana bekannt gegeben. Das Bohrprogramm umfasste rund 34.300 Meter in 80 Bohrlöchern und brachte bemerkenswerte Ergebnisse, darunter:

Ein Highlight von SNUG-24-174: South Limb zeigte 27,55 Meter mit 4,97% CuÄq (2,14% Cu, 1,38% Ni, 0,07% Co), während SNUG-24-146: South Limb 13,15 Meter mit 4,59% CuÄq (1,19% Cu, 1,65% Ni, 0,08% Co) lieferte.

Das Unternehmen hat sein Infill-Bohrprogramm abgeschlossen und richtet nun den Fokus auf ein wirkungsvolles Ressourcenwachstum durch eine beschleunigte Expansionsbohrstrategie, die Gebiete mit starken geophysikalischen Hinweisen auf massige Sulfide und hochgradige Mineralisierung anvisiert.

Positive
  • High-grade assay results significantly above resource estimates (27.55m @ 4.97% CuEq)
  • Mineralization remains open for expansion down-plunge and down-dip
  • Strong correlation with geophysical indicators suggesting additional high-grade potential
Negative
  • US$265,000 marketing expense for Native Ads services

Toronto, Ontario--(Newsfile Corp. - April 17, 2025) - Premium Resources Ltd. (TSXV: PREM) (OTC Pink: PRMLF) ("PREM" or the "Company") announces additional high-grade assay results from resource reclassification drilling at its past-producing nickel-copper-cobalt sulphide ("Ni-Cu-Co") Selebi North underground ("SNUG") mine in Botswana. Results from a total of ~34,300 metres over 80 holes, including the 17 holes reported herein, were not included in the mineral resource estimate ("MRE").

Final Drilling Assay Highlights for Resource Reclassification:

  • SNUG-24-174: South Limb
    27.55 metres of 4.97% CuEq (2.14% Cu, 1.38% Ni, 0.07% Co)
  • SNUG-24-146: South Limb
    13.15 metres of 4.59% CuEq (1.19% Cu, 1.65% Ni, 0.08% Co)

Morgan Lekstrom, CEO and Director of PREM, commented: "These results continue to highlight Selebi North's strong mineralization, which remains open down-plunge and down-dip beyond the known resource. This marks the completion of our infill drill program, and our focus now shifts to high-impact resource growth through an accelerated expansion drilling strategy. This next phase will prioritize areas showing strong correlations with geophysical borehole electromagnetic responses indicative of massive sulphides and high-grade mineralization."

Assay results for SNUG holes reported herein are provided below in Table 1 and drill hole collar details are provided in Table 2.

True thickness of mineralization was estimated using the wireframe as part of the MRE (see PREM news release dated August 8, 2024, and titled: "Premium Nickel Resources Ltd. Announces Its Initial Mineral Resource Estimate of 27.7 Mt for The Selebi Mines in Botswana").

Figure 1 shows the location of these seventeen drill holes relative to the MRE and underground infrastructure. Figure 2 is a plan showing the section locations in Figures 3 and 4 that display the comparison between the estimated net smelter return (NSR1) from the 2024 MRE block model and the results from highlight holes SNUG-24-174 and SNUG-24-146.

1 Mineral Resources are estimated using long-term prices of US$10.50/lb Ni and US$4.75/lb Cu, using nickel and copper recoveries of 72.0% and 92.4% respectively, derived from metallurgical studies which consider a conceptual bulk concentrate scenario.

To view the 3D modeling, please visit the following link https://vrify.com/decks/18519.

Table 1: Assay Results Selebi North Deposit

Hole-IDFrom
(m)
To
(m)
1Length
(m)
2Est. True Thickness
(m)
Cu
(%)
Ni
(%)
3Co
(%)
Limb4CuEq
(%)
SNUG-24-146487.65500.8013.1512.951.191.650.08South Limb4.59
including487.65498.2010.5510.301.392.010.09South Limb5.54
SNUG-24-148299.35308.008.657.101.051.750.09N34.65
SNUG-24-150256.15266.6010.458.650.430.710.04South Limb/N21.89
including256.15262.756.605.350.500.820.04South Limb/N2 2.20
SNUG-24-150275.20277.202.001.651.380.530.02N22.47
SNUG-24-155248.85256.007.156.750.840.540.02South Limb1.94
SNUG-24-157258.95269.3510.409.550.760.830.03South Limb2.48
including263.40269.355.955.450.541.240.05South Limb3.10
SNUG-24-161516.45519.603.153.950.891.580.08N34.15
SNUG-24-162328.70334.355.655.450.550.240.01South Limb1.05
SNUG-24-164523.90529.655.754.200.460.420.02N31.33
SNUG-24-166210.45212.652.201.850.760.290.02South Limb1.35
SNUG-24-168365.00367.002.001.900.360.410.04South Limb1.21
SNUG-24-173265.20277.7012.5010.151.640.820.04South Limb3.32
including265.20274.008.807.151.501.030.05South Limb3.62
SNUG-24-173286.00289.353.353.101.031.920.10N24.97
SNUG-24-174301.45329.0027.5518.952.141.380.07South Limb4.97
including302.90322.4519.5513.452.291.750.09South Limb5.90
*including305.55319.6014.059.652.202.050.11South Limb6.42
SNUG-24-174333.65339.656.004.451.201.050.06N23.36
including336.50339.653.152.351.591.390.08N24.45
SNUG-24-176321.00335.4014.409.501.051.080.05South Limb HW3.28
including323.20332.209.005.951.001.550.08South Limb4.20
SNUG-24-176343.40349.406.004.051.250.980.05South Limb FW3.27
SNUG-24-176355.40359.404.002.701.851.500.08N2 Limb4.94
SNUG-24-178264.15266.101.951.700.642.010.10N34.78
including264.15265.601.451.250.552.640.12N35.98
SNUG-24-179402.95408.905.953.800.991.090.06South Limb/N23.23
SNUG-24-182249.00250.651.651.000.140.900.04South Limb FW1.99
SNUG-24-183516.45530.1513.7010.551.461.590.08South Limb4.73
including516.45528.9512.509.701.501.630.08South Limb4.86

 
1Length refers to drillhole length.
2True thickness is estimated using the MRE wireframe where available.
3Co is not included in the MRE as cobalt analyses are not consistently available throughout the deposit.
4 CuEq was calculated using the formula CuEq=Cu+2.06*Ni assuming long-term prices of US$10.50/lb Ni and US$4.75/lb Cu nickel and copper recoveries of 72.0% and 92.4% respectively, derived from metallurgical studies which consider a conceptual bulk concentrate scenario.
 

Table 2: Drill Collar Information Selebi North Deposit

HOLE IDMine EastMine NorthElevationDipMine
Azimuth
Hole LengthComment
SNUG-24-14635378.584423.481.1-71.8200.5530.58Rig #3 810mL P4
SNUG-24-14835089.484548.6-42.4-42.5276.0502.92Rig #2 925mL P8
SNUG-24-15035320.884605.982.9-36.6248.2311.66Rig #1 810mL P6
SNUG-24-15535321.684606.682.4-68.7261.8302.35Rig #1 810mL P6
SNUG-24-15735321.484606.782.4-56.7265.5449.05Rig #1 810mL P6
SNUG-24-16135089.684548.4-42.3-49.2280.5566.05Rig #2 925mL P8
SNUG-24-16235376.584427.980.7-65.5305.3358.90Rig #3 810mL P4
SNUG-24-16435091.184551.4-41.5-23.3304.9565.65Rig #2 925mL P8
SNUG-24-16635321.584608.583.3-33.7304.8275.65Rig #1 810mL P6
SNUG-24-16835377.084427.281.0-78.2266.2416.45Rig #3 810mL P4
SNUG-24-17335320.784606.282.6-39.6242.4344.30Rig #1 810mL P6
SNUG-24-17435323.184605.182.6-47.0227.2377.25Rig #1 810mL P6
SNUG-24-17635322.984605.182.3-48.2214.9395.15Rig #1 810mL P6
SNUG-24-17835089.984550.4-41.6-27.3296.0536.10Rig #2 925mL P8
SNUG-24-17935323.084605.282.3-51.6206.5440.40Rig #1 810mL P6
SNUG-24-18235321.984607.082.5-61.8269.0293.20Rig #1 810mL P6
SNUG-24-18335378.484424.281.2-68.5187.7584.35Rig #3 810mL P4

 

PREM Engages Native Ads Inc. for Digital Marketing Services

The Company has entered into a services agreement with Native Ads, Inc. ("Native Ads") to provide strategic digital media services to the Company. Under the terms of the agreement, Native Ads will provide a range of services including marketing strategy, data analytics services, content development, media buying and distribution, as well as campaign reporting and optimization. The Company has agreed to pay Native Ads a total initial cost of US$265,000 with a term of up to twelve months.

Native Ads is a full-service advertising agency based out of New York and Vancouver, BC. Native Ads and its principal Jon Malach are arms length to the Company and hold no interest, directly or indirectly, in the securities of the Company or any right to acquire such an interest. The appointment of Native Ads is subject to approval by the TSX Venture Exchange.

Quality Control

The underground drilling program is being carried out through an agreement with Forage Fusion Drilling Ltd. of Hawkesbury, Ontario, Canada, who have provided three Zinex U-5 drills for purchase and training of local operators. Drill core samples are BQTK (40.7 mm diameter). All samples are ½ core cut by a diamond saw on site. Half of the core is retained for reference purposes. Samples are generally 1.0 to 1.5 metre intervals or less at the discretion of the site geologists. Sample preparation and lab analysis was completed at ALS Chemex in Johannesburg, South Africa. Commercially prepared blank samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP-AES finish (ME-ICP81).

Holes are numbered as follows: SNUG (Selebi North Underground) + year + hole number starting at 013.

Qualified Person

The scientific and technical content of this news release has been reviewed and approved by Sharon Taylor, Vice President Exploration of the Company, who is a "qualified person" for the purposes of National Instrument 43-101.

Technical Report

The MRE on the Selebi Mine is supported by the Technical Report. Reference should be made to the full text of the Technical Report for the assumptions, qualifications and limitations set forth therein, a copy of which is available on SEDAR+ (www.sedarplus.com) under PREM's issuer profile.

About Premium Resources Ltd.

PREM is a mineral exploration and development company that is focused on the redevelopment of the previously producing nickel, copper and cobalt resources mines owned by the Company in the Republic of Botswana.

PREM is committed to governance through transparent accountability and open communication within our team and our stakeholders. Our skilled team has worked over 100 projects collectively, accumulating over 400 years of resource discoveries, mine development and mine re-engineering experience on projects like the Company's Selebi and Selkirk mines. PREM's senior team members have on average more than 20 years of experience in every single aspect of mine discovery and development, from geology to operations.

For further information about Premium Resources Ltd., please contact:

Morgan Lekstrom
CEO and Director
morganl@premiumresources.com

Jaclyn Ruptash
Vice President, Communications and Investor Relations
+1 (604) 770-4334

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. For the purposes of this release, forward-looking information includes, but is not limited to: the response to the mineral resource estimate in Botswana; the support for the redevelopment of the Selebi Mine from the National Government and local stakeholders; drilling at Selebi North; the ability to upgrade the inferred mineral resources on Selebi North; possible expansion potential down-dip and down-plunge of the existing mineral resource estimate; the publication by the Company of a potential updated mineral resource estimate or future prefeasibility study; the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Selebi Mine as currently contemplated; the ability of exploration activities (including drill results) to accurately predict mineralization; management's belief that the Selebi and Selebi North deposits may be connected at depth; the timing and ability of the Company to publish a prefeasibility study (by H1 2025 or at all); any discrepancies between the mineral resource estimate technical report and the scientific and technical information in this news release; the timing to release of the remaining assay results; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally; the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Selebi Mine as currently contemplated; the ability of the Company to define additional or upgrade existing mineral resource estimates on the Selebi Mine in accordance with NI 43-101; the productivity rates for underground drilling at Selebi North; drilling results confirming the legacy fold pattern continues at depth; the effective targeting activities proposed by the Company; the ability to identify additional mineralization down plunge of existing workings and the ability of such findings to be used to complete a mineral resource estimate and/or to support further economic studies; the ability and timing of advancing the underground drilling program at Selebi North as contemplated (if at all); the ability to expand the resource potential at the Selebi Mine; the results of the drill program on Selebi North and the timing and disclosures of the Company regarding same; the relationships between, and continuity of, the various deposits (if any); the benefits of the Company's approach to exploration; management's belief that the Historic Resource could be indicative of the presence of mineralization on the deposits; and the anticipated benefits of the Company's approach to the resource development plan. These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; the ability of exploration results to predict mineralization, prefeasibility or the feasibility of mine production; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Company's public disclosure record on SEDAR+ (www.sedarplus.com) under PREM's issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Follow Us
X: https://x.com/prem_resources
Linked in: https://www.linkedin.com/company/Premium-Resources
Facebook: https://www.facebook.com/PremiumResourcesLtd

 

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/248879_0ebc5c72b49d3989_002.jpgFigure 1: Location of Reported Drill Holes with 2024 Mineral Resource Estimate and BHEM

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/248879_0ebc5c72b49d3989_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/248879_0ebc5c72b49d3989_003.jpg

Figure 2: Plan view of Selebi North 2024 Mineral Resource Estimate with section line locations for Figures 3 and 4.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/248879_0ebc5c72b49d3989_003full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/248879_0ebc5c72b49d3989_004.jpg

Figure 3. Drillhole Results for SNUG-24-174 comparing the resource conversion drill hole results to the estimated NSR value in the 2024 block model.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/248879_0ebc5c72b49d3989_004full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/248879_0ebc5c72b49d3989_005.jpg

Figure 4. Drillhole Results for SNUG-24-146 comparing the resource conversion drillhole results to the estimated NSR value in the 2024 block model.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/248879_0ebc5c72b49d3989_005full.jpg

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/248879

FAQ

What are the latest drilling results from Premium Resources (PRMLF) at Selebi North?

The latest results show 27.55 metres of 4.97% CuEq from SNUG-24-174 and 13.15 metres of 4.59% CuEq from SNUG-24-146 in the South Limb area.

How many drill holes were completed in PRMLF's latest Selebi North program?

The program completed approximately 34,300 metres over 80 holes, with 17 holes reported in this latest announcement.

What is Premium Resources (PRMLF) next strategy for Selebi North mine?

PRMLF is shifting from infill drilling to high-impact resource growth through accelerated expansion drilling, focusing on areas with strong geophysical indicators of massive sulphides.

What metals is PRMLF mining at Selebi North?

PRMLF is mining nickel-copper-cobalt (Ni-Cu-Co) sulphides at the Selebi North underground mine.
Premium Resources Ltd

OTC:PRMLF

PRMLF Rankings

PRMLF Latest News

PRMLF Stock Data

53.28M
401.98M
11.57%
51.07%
Other Industrial Metals & Mining
Basic Materials
Link
Canada
Toronto