STOCK TITAN

Premium Resources High Impact Six Month Strategy Including Deep Drilling at Selebi

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

Premium Resources (PRMLF) has announced a comprehensive six-month strategic plan focused on expanding and developing its Selebi Mine deposits. The strategy includes aggressive exploration drilling programs at both Selebi North and Selebi Main deposits, targeting potential resource expansion.

Key initiatives include:

  • Surface drilling program at Selebi Main targeting a possible third mineralized horizon 150 meters below current resource
  • Hinge drilling program between Selebi deposits, covering 12,500 meters in 6 holes over 7 months
  • Underground resource expansion drilling at Selebi North
  • Development of dual-purpose exploration drift
  • Metallurgical testing and evaluation of XRT ore sorting technology

The company will also advance the Selkirk Mine through cost-effective initiatives, including a surface drilling program for resource expansion and metallurgical flowsheet development.

Premium Resources (PRMLF) ha annunciato un piano strategico completo di sei mesi focalizzato sull'espansione e lo sviluppo dei suoi depositi della Miniera di Selebi. La strategia include programmi di perforazione esplorativa aggressivi sia nei depositi di Selebi North che di Selebi Main, mirati all'espansione delle risorse potenziali.

Le principali iniziative includono:

  • Programma di perforazione superficiale a Selebi Main mirato a un possibile terzo orizzonte mineralizzato a 150 metri sotto l'attuale risorsa
  • Programma di perforazione Hinge tra i depositi di Selebi, coprendo 12.500 metri in 6 fori nell'arco di 7 mesi
  • Perforazione per l'espansione delle risorse sotterranee a Selebi North
  • Sviluppo di un drift esplorativo a doppio scopo
  • Test metallurgici e valutazione della tecnologia di selezione minerale XRT

L'azienda avanzerà anche la Miniera di Selkirk attraverso iniziative economiche, inclusi un programma di perforazione superficiale per l'espansione delle risorse e lo sviluppo di un flusso metallurgico.

Premium Resources (PRMLF) ha anunciado un plan estratégico integral de seis meses centrado en la expansión y el desarrollo de sus depósitos de Minería Selebi. La estrategia incluye programas de perforación exploratoria agresivos tanto en los depósitos de Selebi North como en Selebi Main, con el objetivo de expandir los recursos potenciales.

Las iniciativas clave incluyen:

  • Programa de perforación en superficie en Selebi Main dirigido a un posible tercer horizonte mineralizado a 150 metros por debajo del recurso actual
  • Programa de perforación Hinge entre los depósitos de Selebi, cubriendo 12,500 metros en 6 agujeros durante 7 meses
  • Perforación para la expansión de recursos subterráneos en Selebi North
  • Desarrollo de un drift de exploración de doble propósito
  • Pruebas metalúrgicas y evaluación de la tecnología de clasificación de mineral XRT

La empresa también avanzará la Mina Selkirk a través de iniciativas rentables, incluido un programa de perforación en superficie para la expansión de recursos y el desarrollo de un diagrama de flujo metalúrgico.

프리미엄 리소스 (PRMLF)셀레비 광산의 매장량 확장 및 개발에 중점을 둔 포괄적인 6개월 전략 계획을 발표했습니다. 이 전략은 셀레비 노스와 셀레비 메인 매장량 모두에서 공격적인 탐사 드릴링 프로그램을 포함하여 잠재적인 자원 확장을 목표로 합니다.

주요 이니셔티브는 다음과 같습니다:

  • 현재 자원보다 150미터 아래에 있는 세 번째 광물화 지평선을 목표로 하는 셀레비 메인에서의 표면 드릴링 프로그램
  • 셀레비 매장량 간의 힌지 드릴링 프로그램, 7개월 동안 6개의 구멍에서 12,500미터를 커버
  • 셀레비 노스에서의 지하 자원 확장 드릴링
  • 듀얼 목적 탐사 드리프트 개발
  • XRT 광물 분류 기술의 메탈루르기 테스트 및 평가

회사는 또한 자원 확장을 위한 표면 드릴링 프로그램과 메탈루르기 흐름도 개발을 포함한 비용 효율적인 이니셔티브를 통해 셀커크 광산을 발전시킬 것입니다.

Premium Resources (PRMLF) a annoncé un plan stratégique complet de six mois axé sur l'expansion et le développement de ses dépôts de mine de Selebi. La stratégie comprend des programmes de forage d'exploration agressifs tant dans les dépôts de Selebi North que de Selebi Main, visant à une expansion potentielle des ressources.

Les initiatives clés incluent :

  • Programme de forage en surface à Selebi Main visant un possible troisième horizon minéralisé à 150 mètres en dessous de la ressource actuelle
  • Programme de forage Hinge entre les dépôts de Selebi, couvrant 12 500 mètres en 6 trous sur 7 mois
  • Forage d'expansion des ressources souterraines à Selebi North
  • Développement d'un drift d'exploration à double usage
  • Tests métallurgiques et évaluation de la technologie de tri de minerai XRT

L'entreprise fera également progresser la mine de Selkirk grâce à des initiatives rentables, y compris un programme de forage en surface pour l'expansion des ressources et le développement d'un schéma métallurgique.

Premium Resources (PRMLF) hat einen umfassenden sechsmonatigen strategischen Plan angekündigt, der sich auf die Erweiterung und Entwicklung seiner Selebi-Mine-Vorkommen konzentriert. Die Strategie umfasst aggressive Explorationsbohrprogramme sowohl in den Vorkommen Selebi North als auch Selebi Main, die auf eine potenzielle Ressourcenerweiterung abzielen.

Wichtige Initiativen umfassen:

  • Oberflächenbohrprogramm in Selebi Main, das auf eine mögliche dritte mineralisierte Horizonte 150 Meter unterhalb der aktuellen Ressource abzielt
  • Hinge-Bohrprogramm zwischen den Selebi-Vorkommen, das über 7 Monate 12.500 Meter in 6 Löchern abdeckt
  • Unterirdische Ressourcenerweiterungsbohrungen in Selebi North
  • Entwicklung eines zweckmäßigen Erkundungsdrifts
  • Metallurgische Tests und Bewertung der XRT-Erzsortierungstechnologie

Das Unternehmen wird auch die Selkirk-Mine durch kosteneffiziente Initiativen vorantreiben, darunter ein Oberflächenbohrprogramm zur Ressourcenerweiterung und die Entwicklung eines metallurgischen Flussdiagramms.

Positive
  • Aggressive exploration program targeting resource expansion across multiple zones
  • Potential discovery of new mineralized horizon at Selebi Main
  • Implementation of advanced technologies (XRT sorting, Muon Tomography) to enhance operational efficiency
  • Dual-purpose exploration drift development to facilitate both in-fill and exploration drilling
Negative
  • Extended timeline for hinge drilling program (7 months) may delay results
  • Significant drilling costs associated with multiple concurrent programs
  • Supplementary infill drilling postponed to later work programs

Toronto, Ontario--(Newsfile Corp. - April 10, 2025) - Premium Resources Ltd. (TSXV: PREM) (OTC Pink: PRMLF) ("PREM" or the "Company") is pleased to announce an exciting new strategic direction aimed at rapidly demonstrating the size potential of the Selebi North and Selebi Main deposits (together the "Selebi Mine"). The Company will aggressively execute a carefully designed exploration drilling program at the Selebi Mine while concurrently finalizing metallurgical work to identify the optimal mineral processing method for future production. In addition, the Company will advance the Selkirk Mine through low-cost initiatives and evaluate strategic opportunities to enhance its value.

Over the next six months, we will focus on the following key strategies:

Exploration and Development

  • Selebi Main Surface Drilling Program to Target a Potential 3rd Horizon - The Company has commenced a surface exploration drill program, initially by extending historic drill holes, to target a large Borehole Electromagnetic ("BHEM") plate that could represent a new mineralized horizon 150 metres beneath the Selebi Main resource.

  • Hinge Drilling Between Selebi Mine Deposits - Surface drilling program targeting BHEM plates in the untested 2 kilometre long area between the Selebi North and Selebi Main deposits referred to as the hinge. These BHEM targets are situated down-dip and down-plunge of the Selebi Main resource and potentially represent additional mineralization between the two deposits.

  • Selebi North Underground Resource Expansion Drilling - Exploring along strike, down-dip and down-plunge of the Mineral Resource Estimate ("MRE") footprint. Targeting resource expansion and focus on areas with strong BHEM response from the N3, N2 and South Limbs.

  • Selebi Mine Underground Development - Development of a dual-purpose exploration drift from Selebi North is set to commence soon. This will permit both in-fill drilling and exploration drilling at Selebi North and Selebi Main.

  • Selkirk - Surface drilling program for resource expansion and metallurgical flowsheet development. The drill core from this program will also be used for preliminary XRT pre concentration testing. The Company will also continue a resampling program of historic drill core that will target both resource expansion and reclassification in an updated MRE.

Advancing Project Economics

  • Metallurgical sampling and testing - Selebi flotation studies ongoing.

  • Evaluating XRT ("X-ray Transmission") ore sorting - potential to have significant impact on waste rock removal which in turn positively impacts the head feed grade to the concentrate flowsheet, with potential application at both Selebi and Selkirk.

  • Evaluating IDEON Technologies Inc. - for applying Muon Tomography to create 3D density maps of subsurface mineralization at Selebi and Selkirk.

Morgan Lekstrom, CEO of Premium Resources commented: "We are embarking on an accelerated growth curve that will not only highlight the scale of Selebi and the significance of the hinge zone but also address key metallurgical questions. The Company is taking a very methodical approach to demonstrating resource potential while actively advancing on strategic initiatives that will position PREM as a significant player in the critical metals space. Each strategic initiative will be supported by dedicated updates to ensure stakeholders are consistently informed of our progress. The high-grade nature of Selebi, its substantial size, our upcoming drilling and the planned metallurgical work are all critical coinciding steps in the larger vision of potentially building a world class, generational critical metals project."

Exploration Drilling Selebi Mine

The Company has outlined a multi-faceted exploration strategy aimed at expanding the mineral resource potential at the Selebi Mine (see figure 1). One drill is active on surface at Selebi Main and one drill is active underground at Selebi North. Three additional drills will be mobilized to support the hinge drilling program.

The Selebi North Underground Resource Expansion Drilling will include one drill targeting the BHEM plates located down-dip, and down-plunge from the N3, N2, and South Limbs. The Company initially intends to drill approximately 2,525 metres in 4 holes over a period of 6 to 8 weeks and will continue drilling through the remainder of the year (see figure 2).

Additionally, the Company has implemented a surface drilling program at Selebi Main to investigate the potential of a third parallel mineralized horizon beneath the two known zones. This program will consist of 200 metre extensions of three previously drilled drill holes and will target a large BHEM plate identified approximately 150 metres below the current Selebi Main resource. If successful, this program could lead to the discovery of a new mineralized horizon, which could significantly enhance the project's resource base. The Company intends to drill approximately 765 metres in 3 hole extensions over a period of 6 weeks (see figure 3).

Lastly, the Hinge Drilling Between Selebi Mine Deposits offers a strategic opportunity for substantial resource expansion. Drilling will target large BHEM plates located off the Selebi Main mine horizon and toward the Selebi North deposit. The Company intends to pre-collar the holes to a depth of up to 1200 metres and bring in a more powerful drill to extend these holes to final target depths. These holes will target a series of previously untested BHEM plates located down-plunge and down-dip of the Selebi Main resource. Drilling will consist of approximately 12,500 metres in 6 holes over an estimated period of 7 months (see figure 4).

At Selebi North, the Company will continue to report on the remaining outstanding assays from the 2023-2024 in-fill drill program. Results from a total of 33,963 metres over 80 holes were not included in the MRE with an effective date of June 30, 2024. Supplementary infill drilling has been strategically moved into later work programs.

Underground Development

Our in-house development crew is supporting the underground drill program at Selebi North through the development of an exploration drift and drill bays.

Selkirk Exploration Plan

At Selkirk, the ongoing re-sampling program will support an updated MRE through systematic analyses of Platinum Group Elements ("PGE") to augment the patchwork of PGE analyses in the historic database. Drilling will also support an updated MRE through twinning of historic holes and in-filling of identified gaps. Drilling of HQ sized holes will facilitate the collection of metallurgical samples for flowsheet development and XRT ore sorting (see figure 5).

IDEON Technologies Inc.

PREM is evaluating the application of Muon Tomography for subsurface mapping of density contrasts that could represent areas of additional mineralization at both Selebi and Selkirk Mines.

Qualified Person

The scientific and technical content of this news release has been reviewed and approved by Sharon Taylor, Vice President Exploration of the Company, who is a "qualified person" for the purposes of National Instrument 43-101.

About Premium Resources Ltd.

PREM is a mineral exploration and development company that is focused on the redevelopment of the previously producing nickel, copper and cobalt resources mines owned by the Company in the Republic of Botswana.

For further information about Premium Resources Ltd., please contact:

Morgan Lekstrom
CEO and Director
morganl@premiumresources.com

Jaclyn Ruptash
V.P., Communications and Investor Relations
+1 (604) 770-4334
jaclyn@premiumresources.com

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-Looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. For the purposes of this release, forward-looking information includes, but is not limited to: proposed drilling at the Selebi Mine and the Selkirk Mine (the "Mines"); the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Mines as currently contemplated; the ability of exploration activities (including drill results) to accurately predict and demonstrate the size of mineralization and identify new mineralized horizons; management's belief that the Selebi Main and Selebi North deposits may be connected at depth; the anticipated results of proposed metallurgical work, including the identification of optimal mineral processing methods; the proposed development of a dual-purpose exploration drift from Selebi North and the timing thereof; the potential of XRT ore sorting to have a significant impact on waste rock removal and the potential application of XRT at the Mines; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally; the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Mines as currently contemplated; the ability of the Company to define additional or upgrade the existing MREs on the Mines in accordance with National Instrument 43-101; the productivity rates for underground drilling at the Mines; the effective targeting activities proposed by the Company; the ability and timing of advancing the underground drilling program at the Mine as contemplated (if at all); the relationships between, and continuity of, the various deposits (if any); the benefits of the Company's approach to exploration; management's belief that historical drill results could be indicative of the presence of mineralization on the deposits; the anticipated benefits of the Company's approach to the resource development plan; and the Company's advancement on strategic initiatives.

These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; the ability of exploration results to predict mineralization, prefeasibility or the feasibility of mine production; operational delays in the completion of the proposed exploration and metallurgical programs described in this news release; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; the risk that the Company will not be able to advance on strategic initiatives; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Company's public disclosure record on SEDAR+ (www.sedarplus.ca) under the Company's issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Follow Us

X: https://x.com/prem_resources
LinkedIn: https://www.linkedin.com/company/Premium-Resources
Facebook: https://www.facebook.com/PremiumResourcesLtd

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_002.jpg

Figure One: Selebi Mine Comprehensive Planned Exploration Drilling

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_003.jpg

Figure Two: Selebi North Deposit Planned Exploration Drilling

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_003full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_004.jpg

Figure Three: Selebi Main Deposit Planned Exploration Drilling

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_004full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_005.jpg

Figure Four: Hinge Zone Planned Exploration Drilling

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_005full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_006.jpg

Figure Five: Selkirk Planned Program

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/248055_edeb7e7724d248ff_006full.jpg

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/248055

FAQ

What is Premium Resources' (PRMLF) new drilling program targeting at Selebi Main?

The program targets a potential third mineralized horizon 150 meters beneath the current Selebi Main resource, involving 765 meters of drilling across 3 hole extensions over 6 weeks.

How extensive is PRMLF's hinge drilling program between Selebi deposits?

The hinge drilling program covers 12,500 meters across 6 holes over 7 months, targeting BHEM plates between Selebi North and Selebi Main deposits.

What technological innovations is PRMLF evaluating for the Selebi project?

PRMLF is evaluating XRT ore sorting technology for waste rock removal and Muon Tomography by IDEON Technologies for creating 3D density maps of subsurface mineralization.

How many meters of drilling were not included in PRMLF's June 2024 Mineral Resource Estimate?

33,963 meters over 80 holes from the 2023-2024 in-fill drill program were not included in the June 30, 2024 Mineral Resource Estimate.
Premium Resources Ltd

OTC:PRMLF

PRMLF Rankings

PRMLF Latest News

PRMLF Stock Data

53.28M
398.85M
11.57%
51.07%
Other Industrial Metals & Mining
Basic Materials
Link
Canada
Toronto