STOCK TITAN

Premium Nickel Expands Selebi North Deposit with Discoveries of New Mineralization Beyond Initial Mineral Resource Estimate

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

Premium Nickel Resources (PNRL) announces expansion of its Selebi North underground mine in Botswana with high-grade nickel-copper-cobalt sulphide discoveries outside the initial Mineral Resource Estimate (MRE). Key drilling results include intersections of 12.90 metres of 4.12% CuEq and 24.50 metres of 2.17% CuEq in SNUG-24-096-W1, representing the deepest intersection to date. The ongoing drilling program has completed 58,999 metres across 150 drillholes, with additional 29,015 meters in 65 holes not included in the MRE. These results reinforce the open down plunge nature of the deposit and suggest significant exploration potential.

Premium Nickel Resources (PNRL) annuncia l'espansione della sua miniera sotterranea di Selebi North in Botswana con scoperte di sulfi di nichel-rame-cobalto ad alta legge al di fuori della stima iniziale delle risorse minerali (MRE). I risultati chiave di perforazione includono intersezioni di 12,90 metri di 4,12% CuEq e 24,50 metri di 2,17% CuEq in SNUG-24-096-W1, che rappresenta l'intersezione più profonda fino ad oggi. Il programma di perforazione in corso ha completato 58.999 metri su 150 perforazioni, con ulteriori 29.015 metri in 65 fori non inclusi nell'MRE. Questi risultati rafforzano la natura aperta del giacimento verso il basso e suggeriscono un significativo potenziale esplorativo.

Premium Nickel Resources (PNRL) anuncia la expansión de su mina subterránea Selebi North en Botswana con descubrimientos de sulfuros de níquel-cobre-cobalto de alta ley fuera de la estimación inicial de recursos minerales (MRE). Los resultados clave de perforación incluyen intersecciones de 12.90 metros de 4.12% CuEq y 24.50 metros de 2.17% CuEq en SNUG-24-096-W1, lo que representa la intersección más profunda hasta la fecha. El programa de perforación en curso ha completado 58,999 metros en 150 perforaciones, con 29,015 metros adicionales en 65 agujeros que no están incluidos en la MRE. Estos resultados refuerzan la naturaleza abierta del depósito hacia abajo y sugieren un potencial de exploración significativo.

프리미엄 니켈 리소스(PNRL)는 보츠와나의 Selebi North 지하 광산 확장을 발표하며 초기 광물 자원 추정치(MRE) 외부에서 고등급 니켈-구리-코발트 황화물 발견을 알렸습니다. 주요 드릴링 결과는 SNUG-24-096-W1에서 12.90미터의 4.12% CuEq24.50미터의 2.17% CuEq의 교차점을 포함하며, 현재까지 가장 깊은 교차점을 나타냅니다. 진행 중인 드릴링 프로그램은 150개의 드릴홀에 걸쳐 58,999미터를 완료했으며, MRE에 포함되지 않은 65개의 구멍에서 추가로 29,015미터를 기록했습니다. 이러한 결과는 매장량의 열린 하방 성격을 강화하고 상당한 탐사 잠재력을 시사합니다.

Premium Nickel Resources (PNRL) annonce l'expansion de sa mine souterraine de Selebi North au Botswana avec des découvertes de sulfures de nickel-cuivre-cobalt de haute teneur en dehors de l'estimation initiale des ressources minérales (MRE). Les résultats clés de forages incluent des intersections de 12,90 mètres à 4,12% CuEq et 24,50 mètres à 2,17% CuEq dans SNUG-24-096-W1, représentant l'intersection la plus profonde à ce jour. Le programme de forage en cours a complété 58 999 mètres à travers 150 trous de forage, avec 29 015 mètres supplémentaires dans 65 trous non inclus dans la MRE. Ces résultats renforcent la nature ouverte de la dépose vers le bas et suggèrent un potentiel d'exploration significatif.

Premium Nickel Resources (PNRL) kündigt die Erweiterung seiner Selebi North Untergrundmine in Botswana an, mit hochgradigen Nickel-Kupfer-Kobalt-Sulfid-Entdeckungen außerhalb der anfänglichen Mineralressourcenschätzung (MRE). Zu den wichtigen Bohrergebnissen zählen Schnittpunkte von 12,90 Metern mit 4,12% CuEq und 24,50 Metern mit 2,17% CuEq in SNUG-24-096-W1, was die bislang tiefste Schnittstelle darstellt. Das laufende Bohrprogramm hat 58.999 Meter über 150 Bohrlöcher abgeschlossen, mit zusätzlichen 29.015 Metern in 65 Löchern, die nicht in der MRE enthalten sind. Diese Ergebnisse stärken die offene Abwärtslage des Ablagerungstypus und deuten auf ein erhebliches Explorationspotenzial hin.

Positive
  • Discovery of new high-grade mineralization outside initial resource estimate
  • Successful deep drilling extending deposit 100 meters below current resource boundaries
  • Significant drilling progress with 58,999 metres completed across 150 holes
  • High-grade intersections including 12.90m @ 4.12% CuEq and 24.50m @ 2.17% CuEq
Negative
  • None.

Toronto, Ontario--(Newsfile Corp. - October 24, 2024) - Premium Nickel Resources Ltd. (TSXV: PNRL) ("PNRL" or the "Company") announces deposit expansion and high-grade assay results for a further three holes and assays pending for one hole all drilled outside of the initial Mineral Resource Estimate ("MRE") wireframe at its past-producing nickel-copper-cobalt sulphide ("Ni-Cu-Co") Selebi North underground ("SNUG") mine in Botswana. Drill core photos for all highlighted holes released to date, including the holes reported herein, are accessible by Clicking Here and can also be found on the Company's website at www.premiumnickel.com.

Assay highlights include:

  • SNUG-24-096-W1: South Limb - deepest intersection drilled to date and located 100 meters down plunge of SNUG-24-089 and outside the National Instrument 43-101 ("NI 43-101") Inferred Resource
      • 12.90 metres of 4.12% CuEq or 2.00% NiEq (1.54% Cu, 0.95% Ni, 0.05% Co)
    • and 24.50 metres of 2.17% CuEq or 1.05% NiEq (0.72% Cu, 0.67% Ni, 0.04% Co)

  • SNUG-24-102 extension: N2 outside the NI 43-101 Inferred Resource
      • 17.00 metres of 2.02% CuEq or 0.98% NiEq (0.67% Cu, 0.64% Ni, 0.03% Co)
    • incl. 8.10 metres of 2.42% CuEq or 1.17% NiEq (0.78% Cu, 0.82% Ni, 0.04% Co)

  • SNUG-24-114: South Limb infill drilling targeting re-classification of Inferred to Indicated Resources, and N2 outside the NI 43-101 Inferred Resource
      • 21.30 metres of 4.14% CuEq or 2.01% NiEq (1.36% Cu, 1.34% Ni, 0.07% Co)
    • incl. 13.80 metres of 2.42% CuEq or 4.40% NiEq (1.42% Cu, 1.48% Ni, 0.07% Co)

  • SNUG-24-144: Intersected N2 mineralization outside the NI 43-101 Inferred Resource. Assays pending.

Keith Morrison, CEO of PNRL, commented: "The ongoing drilling at Selebi North targets mineralization both inside and outside the deposit geometry defined in the NI 43-101 MRE technical report effective June 30, 2024. The results of these four holes are the first reporting of results that are significantly outside the MRE deposit boundaries. SNUG-24-096-W1 successfully intercepted massive sulphide mineralization 100 metres below the lower extents of the current MRE volume. This reinforces the open down plunge nature of the Selebi North deposit, and the effectiveness of borehole electromagnetics to image massive sulphide mineralization. Substantial exploration potential remains at Selebi, and we are optimistic these results will compliment a future updated economic technical report."

Assay results are provided below in Table 1 for SNUG-24-096-W1, SNUG-24-102 and SNUG-24-114, hole collar details are provided in Table 2. Assay results have been previously reported for the upper portion of SNUG-24-102 (see news release dated June 26, 2024). Upon the discovery of a second mineralized interval in drill hole SNUG-24-114 a decision was made to extend the previously drilled hole SNUG-24-102 and the assays reported herein are from the extension of that hole.

True thickness of mineralization was estimated using the wireframe as part of the MRE (see news release August 8, 2024). For intervals outside the MRE in the N2 Limb, true thickness is not yet determined, and more work is required to confirm the geometry of the new mineralization. Figures 1 and 2 show the location of the holes relative to the MRE and underground infrastructure.

Table 1: Assay Results Selebi North Deposit

Hole-IDFrom
(m)
To
(m)
1Length
(m)
2Est. True Thickness
(m)
Cu
(%)
Ni
(%)
3Co
(%)
Limb4CuEq
(%)
5NiEq
(%)
SNUG-24-096-W1684.60697.5012.9011.51.540.950.05South 4.122.00
SNUG-24-096-W1737.00741.204.203.00.420.230.01South 1.100.53
SNUG-24-096-W1762.50787.0024.50Unknown 0.720.670.04N2 2.171.05
incl765.55780.7515.20Unknown0.630.870.05N2 2.171.05
SNUG-24-096-W1777.25780.753.50Unknown1.561.870.10N2 5.092.47
SNUG-24-102 extension510.10527.1017.00Unknown0.670.640.03N2 2.020.98
incl512.20515.002.80Unknown0.680.650.04N2 2.050.99
and519.00527.108.10Unknown0.780.820.04N2 2.421.17
SNUG-24-114283.60304.9021.3017.91.361.340.07South4.142.01
incl283.60297.4013.8011.11.421.480.07South4.402.14
SNUG-24-114316.15317.851.701.30.570.880.04South2.061.00
SNUG-24-114461.85468.756.90Unknown0.900.710.03N2 2.561.24
incl464.65468.754.10Unknown1.161.010.04N2 3.411.66
SNUG-24-114486.95499.3012.35Unknown1.020.870.04N2 2.961.44
incl486.95496.009.05Unknown1.220.950.04N2 3.461.68
SNUG-24-114513.50518.104.60Unknown0.530.410.02N2 1.510.73

 

1Length refers to drillhole length.
2True thickness is estimated using the MRE wireframe where available.
3Co is not included in the MRE as cobalt analyses are not consistently available throughout the deposit.
4 CuEq was calculated using the formula CuEq=Cu+2.06*Ni assuming long-term prices of US$10.50/lb Ni and US$4.75/lb Cu nickel and copper recoveries of 72.0% and 92.4% respectively, derived from metallurgical studies which consider a conceptual bulk concentrate scenario.
5 NiEq was calculated using the formula NiEq=Ni+0.485*Cu

Table 2: Drill Collar Information Selebi North Deposit

HOLE IDMine
East
Mine
North
ElevationDipMine
Azimuth
Hole
Length
Comment
SNUG-24-096-W135377.784423.181.35-60.8175.7851.2Rig #3 810mL
SNUG-24-10235322.684605.882.32-59.4236.0566.4Rig #1 810mL
SNUG-24-11435321.484606.182.36-56.1249.2602.4Rig #1 810mL
SNUG-24-14435322.984604.982.32-60.4217.2653.3Rig #1 810mL

 

Drilling and BHEM Continues

As of October 22, 2024, a total of 58,999 metres in one hundred and fifty (150) drillholes have been drilled from eight underground drill bays with three of those drillholes currently in-progress. Additional drilling, totaling 29,015 meters across 65 completed holes, with 3 more in progress, are not included in the MRE. This new drilling is a combination of infill and exploration drilling to follow the extension of the mineralization down dip and down plunge.

New assay results not captured in the MRE will be published as they are received and verified by the Company. Due to the extensive drilling that has intersected mineralization, the Company has released assay results only for the most significant intercepts. The results of these new drill holes will be included in a future mineral resource update, with the goal of both expansion and reclassification of the MRE. It is PNRL's ambition that these pending results combined with future drilling would support the progression towards a Pre-feasibility Study.

Quality Control

The underground drilling program is being carried out through an agreement with Forage Fusion Drilling Ltd. of Hawkesbury, Ontario, Canada, who have provided three Zinex U-5 drills for purchase and training of local operators. Drill core samples are BQTK (40.7 mm diameter). All samples are ½ core cut by a diamond saw on site. Half of the core is retained for reference purposes. Samples are generally 1.0 to 1.5 metre intervals or less at the discretion of the site geologists. Sample preparation and lab analysis was completed at ALS Chemex in Johannesburg, South Africa. Commercially prepared blank samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP-AES finish (ME-ICP81).

Holes are numbered as follows: SNUG (Selebi North Underground) + year + hole number starting at 013.

BHEM Surveys

The BHEM surveys at Selebi utilize the Crone PEM system operated by local Batswana staff. Survey data is collected using a 3-component fluxgate probe collecting full waveform data. Surveys have been collected using timebases between 50 and 1000ms (0.25 Hz to 5 Hz). The data has been processed to a calculated residual step response to better quantify the conductive sources. This added processing has proven to be invaluable because of the size of the highly conductive mineralized system.

Qualified Person

The scientific and technical content of this news release has been reviewed and approved by Sharon Taylor, Vice President Exploration of the Company, who is a "qualified person" for the purposes of National Instrument 43-101.

Technical Report

The MRE on the Selebi Mine is supported by the Technical Report. Reference should be made to the full text of the Technical Report for the assumptions, qualifications and limitations set forth therein, a copy of which is available on SEDAR+ (www.sedarplus.com) under PNRL's issuer profile.

About Premium Nickel Resources Ltd.

PNRL is a mineral exploration and development company that is focused on the redevelopment of the previously producing nickel, copper and cobalt resources mines owned by the Company in the Republic of Botswana.

PNRL is committed to governance through transparent accountability and open communication within our team and our stakeholders. Our skilled team has worked over 100 projects collectively, accumulating over 400 years of resource discoveries, mine development and mine re-engineering experience on projects like the Company's Selebi and Selkirk mines. PNRL's senior team members have on average more than 20 years of experience in every single aspect of mine discovery and development, from geology to operations.

ON BEHALF OF THE BOARD OF DIRECTORS

Keith Morrison
Director and Chief Executive Officer
Premium Nickel Resources Ltd.

For further information about Premium Nickel Resources Ltd., please contact:
Jaclyn Ruptash
Vice President, Communications and Government and Investor Relations
+1 (604) 770-4334

Cautionary Note Regarding Forward-Looking Statements:

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. For the purposes of this release, forward looking information includes, but is not limited to: the response to the MRE in Botswana; the support for the redevelopment of the Selebi Mine from the National Government and local stakeholders; drilling at Selebi North; the ability to upgrade the inferred mineral resources on Selebi North; possible expansion potential down-dip and down-plunge of the existing MRE; the publication by the Company of a potential updated MRE or future PFS; the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Selebi Mine as currently contemplated; the ability of exploration activities (including drill results) to accurately predict mineralization; management's belief that the Selebi and Selebi North deposits may be connected at depth; the timing and ability of the Company to publish a prefeasibility study (by H1 2025 or at all); any discrepancies between the MRE technical report and the scientific and technical information in this news release; the timing to release of the remaining assay results; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally; the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Selebi Mine as currently contemplated; the ability of the Company to define additional or upgrade existing mineral resource estimates on the Selebi Mine in accordance with NI 43-101; the productivity rates for underground drilling at Selebi North; drilling results confirming the legacy fold pattern continues at depth; the effective targeting activities proposed by the Company; the ability to identify additional mineralization down plunge of existing workings and the ability of such findings to be used to complete a MRE and/or to support further economic studies; the ability and timing of advancing the underground drilling program at Selebi North as contemplated (if at all); the ability to expand the resource potential at the Selebi Mine; the results of the drill program on Selebi North and the timing and disclosures of the Company regarding same; the relationships between, and continuity of, the various deposits (if any); the benefits of the Company's approach to exploration; management's belief that the Historic Resource could be indicative of the presence of mineralization on the deposits; and the anticipated benefits of the Company's approach to the resource development plan. These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; the ability of exploration results to predict mineralization, prefeasibility or the feasibility of mine production; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Company's public disclosure record on SEDAR+ (www.sedarplus.com) under PNRL's issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Follow Us
X (formally Twitter): https://twitter.com/PremiumNickel
Linked in: https://www.linkedin.com/company/premium-nickel-resources
Facebook: https://www.facebook.com/PremiumNickel

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/227648_d38bde4104284896_002.jpg

Figure 1: Selebi North Location of Reported Drill Holes with 2024 Mineral Resource Estimate

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/227648_d38bde4104284896_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/227648_d38bde4104284896_003.jpg

Figure 2: Detailed view showing location of drillholes reported and mentioned in this release with 2024 Mineral Resource Estimate, Underground Infrastructure and Modeled BHEM Plates.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/227648_d38bde4104284896_003full.jpg

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/227648

FAQ

What are the latest drilling results from Premium Nickel Resources (PNRLF) at Selebi North?

The latest drilling results include intersections of 12.90 metres of 4.12% CuEq and 24.50 metres of 2.17% CuEq in hole SNUG-24-096-W1, representing the deepest intersection drilled to date at Selebi North.

How many meters has Premium Nickel Resources (PNRLF) drilled at Selebi North as of October 2024?

As of October 22, 2024, PNRL has drilled 58,999 metres across 150 drillholes, plus an additional 29,015 meters in 65 holes not included in the Mineral Resource Estimate.

What is the significance of the new mineralization discovered at Selebi North by PNRLF?

The new mineralization discovered extends 100 meters beyond the current resource boundaries, demonstrating the deposit remains open down plunge and suggesting significant exploration potential for resource expansion.

PREMIUM RES LTD

OTC:PNRLF

PNRLF Rankings

PNRLF Latest News

PNRLF Stock Data

64.65M
157.98M
14.7%
13.66%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Toronto