Platinum Group Metals Ltd. Reports Second Quarter 2025 Results
Platinum Group Metals (NYSE: PLG) has reported its financial results for the six-month period ended February 28, 2025. The company posted a net loss of $2.25 million, slightly improved from the $2.37 million loss in the same period last year.
Key financial highlights include:
- General and administrative expenses increased to $2.0 million
- Stock-based compensation decreased to $0.45 million
- Basic and diluted loss per share remained at $0.02
The company's main focus remains the advancement of the Waterberg Project, planned as a fully mechanized PGM mine. Recent developments include a Rand 42 million interim budget approval for continued work programs and the establishment of a new $50 million ATM equity program. The company is also exploring PGM smelting opportunities in Saudi Arabia through a partnership with Ajlan & Bros Company.
I Metalli del Gruppo Platino (NYSE: PLG) hanno riportato i risultati finanziari per il periodo di sei mesi conclusosi il 28 febbraio 2025. La società ha registrato una perdita netta di 2,25 milioni di dollari, leggermente migliorata rispetto alla perdita di 2,37 milioni di dollari nello stesso periodo dell'anno scorso.
I principali punti salienti finanziari includono:
- Le spese generali e amministrative sono aumentate a 2,0 milioni di dollari
- La compensazione basata su azioni è diminuita a 0,45 milioni di dollari
- La perdita per azione, sia base che diluita, è rimasta a 0,02 dollari
Il principale obiettivo della società rimane l'avanzamento del Progetto Waterberg, pianificato come una miniera di PGM completamente meccanizzata. Gli sviluppi recenti includono un approvazione di un budget intermedio di 42 milioni di Rand per programmi di lavoro continuativi e l'istituzione di un nuovo programma di equity ATM da 50 milioni di dollari. La società sta anche esplorando opportunità di fusione di PGM in Arabia Saudita attraverso una partnership con Ajlan & Bros Company.
Metales del Grupo Platino (NYSE: PLG) ha informado sus resultados financieros para el período de seis meses que terminó el 28 de febrero de 2025. La empresa reportó una pérdida neta de 2.25 millones de dólares, ligeramente mejor que la pérdida de 2.37 millones de dólares en el mismo período del año pasado.
Los aspectos financieros clave incluyen:
- Los gastos generales y administrativos aumentaron a 2.0 millones de dólares
- La compensación basada en acciones disminuyó a 0.45 millones de dólares
- La pérdida básica y diluida por acción se mantuvo en 0.02 dólares
El enfoque principal de la empresa sigue siendo el avance del Proyecto Waterberg, planeado como una mina de PGM completamente mecanizada. Los desarrollos recientes incluyen una aprobación de presupuesto interino de 42 millones de Rand para continuar con los programas de trabajo y el establecimiento de un nuevo programa de capital ATM de 50 millones de dólares. La empresa también está explorando oportunidades de fundición de PGM en Arabia Saudita a través de una asociación con Ajlan & Bros Company.
플래티넘 그룹 금속 (NYSE: PLG)은 2025년 2월 28일로 종료된 6개월 동안의 재무 결과를 보고했습니다. 회사는 225만 달러의 순손실을 기록했으며, 이는 작년 같은 기간의 237만 달러 손실보다 약간 개선된 수치입니다.
주요 재무 하이라이트는 다음과 같습니다:
- 일반 및 관리 비용이 200만 달러로 증가했습니다
- 주식 기반 보상이 45만 달러로 감소했습니다
- 기본 및 희석 주당 손실은 0.02달러로 유지되었습니다
회사의 주요 초점은 워터버그 프로젝트의 발전에 있으며, 이는 완전 기계화된 PGM 광산으로 계획되고 있습니다. 최근 개발 사항으로는 4200만 랜드의 중간 예산 승인이 포함되어 있으며, 지속적인 작업 프로그램을 위한 것이고, 5000만 달러의 ATM 자본 프로그램이 새롭게 설립되었습니다. 회사는 또한 Ajlan & Bros Company와의 파트너십을 통해 사우디 아라비아에서 PGM 제련 기회를 탐색하고 있습니다.
Métaux du Groupe Platine (NYSE: PLG) a publié ses résultats financiers pour la période de six mois se terminant le 28 février 2025. L'entreprise a enregistré une perte nette de 2,25 millions de dollars, légèrement améliorée par rapport à la perte de 2,37 millions de dollars au cours de la même période l'année dernière.
Les principaux points financiers incluent :
- Les frais généraux et administratifs ont augmenté à 2,0 millions de dollars
- La compensation en actions a diminué à 0,45 million de dollars
- La perte de base et diluée par action est restée à 0,02 dollar
Le principal objectif de l'entreprise reste l'avancement du Projet Waterberg, prévu comme une mine de PGM entièrement mécanisée. Les développements récents incluent une approbation d'un budget intérimaire de 42 millions de Rand pour les programmes de travail continus et l'établissement d'un nouveau programme de capital ATM de 50 millions de dollars. L'entreprise explore également des opportunités de fusion de PGM en Arabie Saoudite grâce à un partenariat avec Ajlan & Bros Company.
Platin-Gruppe Metalle (NYSE: PLG) hat seine finanziellen Ergebnisse für den sechsmonatigen Zeitraum zum 28. Februar 2025 bekannt gegeben. Das Unternehmen verzeichnete einen Nettoverlust von 2,25 Millionen Dollar, was eine leichte Verbesserung gegenüber dem Verlust von 2,37 Millionen Dollar im gleichen Zeitraum des Vorjahres darstellt.
Wichtige finanzielle Höhepunkte sind:
- Allgemeine und Verwaltungskosten stiegen auf 2,0 Millionen Dollar
- Aktienbasierte Vergütung sank auf 0,45 Millionen Dollar
- Der Verlust pro Aktie, sowohl grundlegend als auch verwässert, blieb bei 0,02 Dollar
Der Hauptfokus des Unternehmens bleibt die Weiterentwicklung des Waterberg-Projekts, das als vollständig mechanisierte PGM-Mine geplant ist. Zu den jüngsten Entwicklungen gehört die Genehmigung eines Zwischenbudgets von 42 Millionen Rand für fortlaufende Arbeitsprogramme sowie die Einrichtung eines neuen 50 Millionen Dollar ATM-Eigenkapitalprogramms. Das Unternehmen untersucht auch PGM-Schmelzmöglichkeiten in Saudi-Arabien durch eine Partnerschaft mit Ajlan & Bros Company.
- Improved net loss compared to previous year ($2.25M vs $2.37M)
- Secured new $50M ATM equity program for project funding
- Unanimous approval of R42M interim budget for Waterberg Project
- Strategic partnership with Ajlan for PGM smelting opportunities
- Increased general and administrative expenses to $2.0M
- Reduced finance income from $0.25M to $0.10M
- South African government preference for local beneficiation may impact export plans
- Continued net losses affecting financial position
Insights
Platinum Group Metals' Q2 2025 results reveal steady advancement of their flagship Waterberg Project, though still in pre-construction phase. The positive Definitive Feasibility Study Update confirms the potential for one of the largest and lowest-cost underground PGM mines globally. The company's
Financing activities demonstrate market confidence, with the successful implementation of a
The strategic partnership with Saudi Arabia's Ajlan & Bros represents a potentially transformative development. Initially focused on building a PGM smelter in Saudi Arabia, they're now also exploring a hybrid approach with a South African matte furnace due to government beneficiation preferences - a pragmatic compromise that could maintain project viability while satisfying regulatory concerns.
The unanimous board approval of the interim budget signals continued partner alignment. However, the critical path to development requires finalizing concentrate offtake arrangements and securing project financing - neither of which are finalized yet, representing the key near-term hurdles.
This quarterly report highlights PLG's continued positioning for the global energy transition through their Waterberg Project - a shallow, mechanized operation targeting platinum, palladium, rhodium and gold with nickel and copper byproducts. The project's significance comes from its potential scale and cost profile, particularly as the Northern Limb of the Bushveld Complex offers distinct advantages over traditional deep South African PGM mining operations.
The company's dual-track beneficiation strategy is particularly noteworthy. While the Saudi smelter partnership represents innovative thinking about global PGM processing, the adjusted approach considering a matte furnace in South Africa shows pragmatic adaptation to government priorities. Reducing shipping volumes from 130,000 tonnes of concentrate annually to just 8,000 tonnes of converter matte represents significant logistical and potentially environmental improvements.
The Market Study completion confirming viability of combining Waterberg concentrate with recycled catalysts from the Gulf Region creates a compelling value proposition. This integration of primary and secondary PGM sources aligns perfectly with circular economy principles increasingly important in metals markets.
PLG's acknowledgment of EV transition risks to traditional PGM demand demonstrates appropriate forward thinking, with their Lion Battery Technologies initiative representing a strategic hedge. However, the project still faces challenges including final offtake agreements and the substantial capital requirements typical of mining developments. The current expenditure rate of approximately
Vancouver, British Columbia and Johannesburg, South Africa--(Newsfile Corp. - April 11, 2025) - Platinum Group Metals Ltd. (TSX: PTM) (NYSE American: PLG) ("Platinum Group", "PTM" or the "Company") reports the Company's financial results for the six-month period ended February 28, 2025, and provides an update and outlook. The Company is focused on advancing the Waterberg project located on the Northern Limb of the Bushveld Complex in South Africa (the "Waterberg Project"). The Waterberg Project is planned as a fully mechanised, shallow, decline access platinum, palladium, rhodium and gold ("PGM") mine, including by-product copper and nickel production, and is projected to be one of the largest and lowest cost underground platinum group metals ("PGM" or "PGMs") mines globally.
The Company's near-term objectives are to advance the Waterberg Project to a development and construction decision including the arrangement of construction financing and concentrate offtake agreements. The Company is also advancing an initiative through Lion Battery Technologies Inc. ("Lion") using platinum and palladium in lithium battery technologies in collaboration with Anglo American Platinum Limited ("Amplats") and Florida International University ("FIU").
For details of the condensed consolidated interim financial statements for the six months ended February 28, 2025 (the "Financial Statements") and Management's Discussion and Analysis ("MD&A") for the six months ended February 28, 2025, please see the Company's filings on SEDAR+ (www.sedarplus.ca) or on EDGAR (www.sec.gov). Shareholders are encouraged to visit the Company's website at www.platinumgroupmetals.net. Shareholders may receive a hard copy of the complete Financial Statements and MD&A from the Company free of charge upon request.
All amounts herein are reported in United States dollars unless otherwise specified. The Company holds cash in Canadian dollars, United States dollars and South African Rand. Changes in exchange rates may create variances in the cash holdings or results reported.
Project Ownership
As of February 28, 2025, the Waterberg Project is owned by Waterberg JV Resources (Pty) Ltd. ("Waterberg JV Co."), which is in turn owned by Platinum Group (
Recent Events
On February 18, 2025, the board of directors for Waterberg JV Co. unanimously approved a Rand 42 million interim budget (Approximately
On December 5, 2024, the Company entered into an Equity Distribution Agreement with BMO Nesbit Burns Inc. and Beacon Securities Limited (the "Canadian Agents") and BMO Capital Markets Corp. (the "U.S. Agent" and together with the Canadian Agents, the "Agents") for a new at-the-market equity program (the "2025 ATM") to distribute up to
During the three months ended February 28, 2025, the Company issued 842,561 Common Shares, through BMO Capital Markets on the NYSE American pursuant to the 2025 ATM, at an average price of
On November 26, 2024, the Company entered a memorandum of understanding ("MOU") with Ajlan & Bros Company for Mining, a subsidiary of Ajlan & Bros Holding ("Ajlan"), and the Ministry of Investment of Saudi Arabia ("MISA") as a part of the Global Supply Chain Resilience Initiative, for the setup of a proposed platinum group metals smelter ("PGM Smelter") and base metal refinery ("BMR") to be located in Saudi Arabia. Ajlan is one of the largest private sector diversified conglomerates in the Middle East. Earlier, in December 2023, Ajlan and the Company entered into a Cooperation Agreement (as defined below) to study the establishment of a stand-alone PGM Smelter and BMR in Saudi Arabia. According to the terms of the MOU, MISA will offer strategic guidance and study potential financial support to the proposed PGM Smelter and BMR and the Waterberg Project located in South Africa.
On November 13, 2024, the Company filed a final short form base shelf prospectus (the "Shelf Prospectus") with the securities regulatory authorities in each of the provinces and territories of Canada and a corresponding registration statement on Form F-10 (the "Registration Statement") with the U.S. Securities and Exchange Commission ("SEC"), under the Multijurisdictional Disclosure System established between Canada and the United States. Pursuant to the Shelf Prospectus and the Registration Statement, the Company may offer and sell Common Shares, debt securities, warrants, subscription receipts, or a combination thereof up to an aggregate initial offering amount of
On September 16, 2024, the Company reported positive results from an Independent Definitive Feasibility Study Update (the "Waterberg DFS Update") for the Waterberg Project. The associated technical report entitled "Waterberg Definitive Feasibility Study Update, Bushveld Igneous Complex, Republic of South Africa", with an effective date of August 31, 2024, was filed on SEDAR+ on October 9, 2024. The Waterberg DFS Update was prepared by independent qualified persons in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and Subpart 229.1300 and Item 601(b)(96) of the SEC's Regulation S-K (collectively, "S-K 1300"). The Waterberg DFS Update included revised mineral resource and mineral reserve estimates. For details of the Waterberg DFS Update see the Company's news release dated September 16, 2024, the MD&A, and the technical report referred to above.
Results For The Six Months Ended February 28, 2025
During the six months ended February 28, 2025, the Company incurred a net loss of
At February 28, 2025, finance income consisting of interest earned in the six month period amounted to
Accounts receivable at February 28, 2025, totalled
Total expenditures on the Waterberg Project, before partner reimbursements, for the six months ended February 28, 2025, were approximately
For more information on mineral properties, see Note 3 of the Financial Statements.
Smelting and Refining Update
On December 20, 2023, the Company announced a Cooperation Agreement (the "Cooperation Agreement") with Ajlan to study the establishment of a stand-alone PGM Smelter and BMR in Saudi Arabia. The Cooperation Agreement encompasses three phases: a global PGM concentrate market study (the "Market Study"), a Definitive Feasibility Study for the construction and operation of the PGM Smelter and BMR in Saudi Arabia (the "Smelter DFS"), and an option to form an incorporated 50:50 joint venture following the completion of the Smelter DFS.
An initial trade-off study was completed in mid 2023 to first determine the viability of exporting PGM concentrate from South Africa to Saudi Arabia. The Market Study was completed in late 2024 by a globally recognized consulting group specializing in PGMs and associated base metal by-products. Based on the analysis, the combination of concentrate from the Waterberg Project and end of life auto catalysts and petrochemical catalysts, sourced from the Gulf Region, could justify the scale required to construct a long term PGM smelting and refining complex in Saudi Arabia. Other sources of mined PGM concentrate from Southern Africa could be considered over the longer term. Sources beyond Southern Africa are considered too early stage, too low in PGM content and too far away to be transported economically.
The Smelter DFS was to assume the export of PGM concentrate from the Waterberg Project in South Africa to a port facility in Saudi Arabia and was to encompass options related to infrastructure, location, technical specifications, capital, and operating costs. All expenses related to the Smelter DFS, expected to cost approximately
A key requirement for the above proposal to establish a PGM Smelter and BMR in Saudi Arabia would be a long-term South African government approval for the export of unrefined precious metals in concentrate. Platinum Group has been working with the Government of South Africa to identify local beneficiation opportunities and to analyze the possible impact of exporting concentrate on the value chain. Through these discussions the government of South Africa has expressed their preference and support for beneficiation in South Africa. As a result, Ajlan and PTM are also now studying the possibility of establishing a matte furnace in South Africa capable of smelting Waterberg Project concentrate. Such a facility would ideally be located near the Waterberg Project with existing power, water and environmental authorizations. The converter matte produced would be shipped to Saudi Arabia for further processing through a BMR, at which time spent auto catalysts and other PGM bearing materials could be co-processed.
The Company and Ajlan are currently conducting a trade off study and developing a scope of work and cost estimate for the engineering studies required to assess the above scenario, should it be chosen as the primary plan. One noteworthy consideration would be the much lower volume of material to be shipped to Saudi Arabia. Rather than shipping up to 130,000 tonnes of concentrate a year, or approximately fourteen concentrate trucks a day, the volume of converter matte to be shipped would be reduced to approximately 8,000 tonnes a year, or approximately one truck a day.
Outlook
The Company's primary business objective is to advance the Waterberg Project to a development and construction decision. PTM is the operator of the Waterberg Project as directed by a technical committee comprised of representatives from joint venture partners Implats, Mnombo, and HJM.
Since October 18, 2022, Waterberg JV Co. has been advancing exploration and engineering work related to the Waterberg DFS Update, initial road access, water supply, infrastructure and essential site facilities, a first phase accommodation lodge, a site construction power supply from state utility Eskom and advancement of the Waterberg Social & Labour Plan. Engagement with local communities has been ongoing and together the parties have agreed upon the location of project facilities and infrastructure.
Before a construction decision can be undertaken, arrangements will be required for Waterberg Project concentrate offtake or processing. The Company and Waterberg JV Co. are assessing commercial alternatives for mine development financing and concentrate offtake. In addition to the Company's investigation of smelting and base metal refining options in Saudi Arabia (as described above), the Company is also in discussion with several South African smelter operators, including Implats, with a view to negotiating formal concentrate offtake arrangements for the Waterberg Project.
The Company continues to work closely with regional and local communities and their leadership on mine development plans to achieve optimal outcomes and best value to all stakeholders.
As the world seeks to decarbonize and look for solutions to climate change, the adoption of battery electric vehicles is forecast to reduce the future demand for PGMs used in autocatalysis. The unique properties of PGMs as powerful catalysts are being applied to various technologies as possible solutions for more efficient energy generation and storage, which may create new demand for PGMs. The Company's battery technology initiative through Lion with partner Amplats represents one such new opportunity in the high-profile lithium battery research and innovation field. The investment in Lion creates a potential vertical integration with a broader industrial market development strategy to bring new technologies to market which use palladium and platinum. Research and development efforts by FIU on behalf of Lion continue. Technical results from Lion's research may have application to most lithium-ion and lithium-sulfur battery chemistries.
Although platinum and palladium are exempt, as they are considered critical minerals, the new global tariffs recently announced by the United States administration in Washington, DC, layered on top of previously announced tariffs on automobiles, steel, aluminum, etc., have raised uncertainty regarding markets in general and specifically to the production and sale of automobiles and light duty vehicles. A period of uncertainty is likely as investors and consumers consider the impact of these tariffs, and as the level of retaliation and market diversification by other nations becomes apparent.
For more detail, please see the Company's MD&A and Annual Information Form ("AIF").
Environmental, Social and Governance
Platinum Group recently received its fourth annual Environmental, Social and Governance ("ESG") disclosure report from Digbee Ltd. ("Digbee"), a United Kingdom based company that has developed an industry standard ESG disclosure framework for the mining sector providing a right-sized, future looking set of frameworks against which they can credibly disclose, track, compare and improve their ESG performance. For 2024, Platinum Group achieved an overall score of BBB with a range of CC to AAA based on the information provided. Digbee ESG has been developed in consultation with mining companies, ESG specialists and capital providers and is endorsed by leading financial institutions, producing mining companies and other industry stakeholders. Digbee's reporting framework is aligned with global standards, including the Equator Principles. For more details about the Company's 2024 Digbee ESG Report please refer to the Company's MD&A, AIF and Annual Report on Form 40-F ("Form 40-F").
Regulatory
The Company advises that its consolidated Financial Statements for the fiscal year ended August 31, 2024, included in the Company's Form 40-F, contain an audit report from its independent registered public accounting firm that includes a going concern emphasis of matter. The foregoing statement is required by Section 610(b) of the NYSE American Company Guide.
As well as the discussions within this news release, the reader is encouraged to also see the Company's disclosure made under the heading "Risk Factors" in the Company's current AIF and Form 40-F.
Qualified Person
Rob van Egmond, P.Geo., a consultant geologist to the Company and a former employee, is an independent qualified person as defined in NI 43-101. Mr. van Egmond has reviewed, validated and approved the scientific and technical information contained in this news release and has previously visited the Waterberg Project site.
About Platinum Group Metals Ltd. and the Waterberg Project
Platinum Group Metals Ltd. is the operator of the Waterberg Project, a bulk underground palladium and platinum deposit located in South Africa. The Waterberg Project was discovered by Platinum Group and is being jointly developed with Implats, Mnombo, and HJM.
On behalf of the Board of
Platinum Group Metals Ltd.
Frank R. Hallam
President, CEO and Director
For further information contact:
Kris Begic, VP, Corporate Development
Platinum Group Metals Ltd., Vancouver
Tel: (604) 899-5450 / Toll Free: (866) 899-5450
www.platinumgroupmetals.net
Disclosure
The TSX and the NYSE American have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.
This news release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of U.S. securities laws (collectively "forward-looking statements"). Forward-looking statements are typically identified by words such as: "believe", "expect", "anticipate", "intend", "estimate", "may", "plans", "would", "will", "could", "can", "postulate" and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. Forward-looking statements in this news release include, but are not limited to, statements regarding the success of the Company's objective to advance the Waterberg Project to a development and construction decision, the findings of the Waterberg DFS Update, the plan for and development of the Waterberg Project and the potential benefits and results thereof including that it is projected to become one of the largest and lowest cost underground PGM mines globally, financing and mine development of the Waterberg Project, potential commercial alternatives for mine development, obtaining concentrate offtake or processing, the size and cost of the Waterberg Project, the 2025 ATM and the use of proceeds under the 2025 ATM, the economic feasibility of establishing a new PGM smelter and BMR in Saudi Arabia, the effect of recent tariffs and other trade policy announcements by the United States Government and other countries including capital market volatility, work with local communities, the ability of the Company to obtain all required permitting, surface access, and infrastructure servitudes, the effect of battery electric vehicles on the market for PGMs, the use of PGMs in solutions to climate change, and the Company's other future plans and expectations. Although the Company believes any forward-looking statements in this news release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct.
The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance and that actual results may differ materially from those in forward-looking statements as a result of various factors, including rising global inflation and increased potential supply chain disruptions; international conflict and other geopolitical tensions and events; the Company's inability to generate sufficient cash flow or raise additional capital, and to comply with the terms of any new indebtedness; additional financing requirements; and any new indebtedness may be secured, which potentially could result in the loss of any assets pledged by the Company; the Company's history of losses and negative cash flow; the Company's ability to continue as a going concern; the Company's properties may not be brought into a state of commercial production; uncertainty of estimated production, development plans and cost estimates for the Waterberg Project as reported in the Waterberg DFS Update; discrepancies between actual and estimated mineral reserves and mineral resources, between actual and estimated development and operating costs, between actual and estimated metallurgical recoveries and between estimated and actual production; fluctuations in the relative values of the U.S. Dollar, the South African Rand and the Canadian Dollar; volatility in metals prices; the uncertainty of alternative funding sources for Waterberg JV Co.; the Company may become subject to the U.S. Investment Company Act; the failure of the Company or the other shareholders to fund their pro rata share of funding obligations for the Waterberg Project; any disputes or disagreements with the other shareholders of Waterberg JV Co. or Mnombo; the ability of the Company to retain its key management employees and skilled and experienced personnel; conflicts of interest; litigation or other administrative proceedings brought against the Company; actual or alleged breaches of governance processes or instances of fraud, bribery or corruption; exploration, development and mining risks and the inherently dangerous nature of the mining industry, and the risk of inadequate insurance or inability to obtain insurance to cover these risks and other risks and uncertainties; property and mineral title risks including defective title to mineral claims or property; changes in national and local government legislation, taxation, controls, regulations and political or economic developments in Canada and South Africa; equipment shortages and the ability of the Company to acquire necessary access rights and infrastructure for its mineral properties; environmental regulations and the ability to obtain and maintain necessary permits, including environmental authorizations and water use licences; extreme competition in the mineral exploration industry; delays in obtaining, or a failure to obtain, permits necessary for current or future operations or failures to comply with the terms of such permits; risks of doing business in South Africa, including but not limited to, labour, economic and political instability and potential changes to and failures to comply with legislation; pandemics and other public health crises; the Company's common shares may be delisted from the NYSE American or the TSX if it cannot maintain compliance with the applicable listing requirements; and other risk factors described in the Company's most recent AIF and Form 40-F, other filings with the SEC and Canadian securities regulators, which may be viewed at www.sec.gov and www.sedarplus.ca, respectively. Proposed changes in the mineral law in South Africa, if implemented as proposed, may have a material adverse effect on the Company's business and potential interest in projects. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether because of new information, future events or results or otherwise.
The Waterberg DFS Update has been prepared in accordance with NI 43-101 and S-K 1300. The technical and scientific information contained in this news release has been prepared in accordance with NI 43-101, which differs from the standards adopted by the SEC. Accordingly, the technical and scientific information contained in this news release, including any estimates of mineral reserves and mineral resources, may not be comparable to similar information disclosed by U.S. companies subject to the disclosure requirements of the SEC.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/248239