Northstar Commences EM Surveys Targeting Cam Copper VMS Extensions at Miller Copper-Gold Property
- None.
- None.
Vancouver, British Columbia--(Newsfile Corp. - March 26, 2024) - Northstar Gold Corp. (CSE: NSG) (OTC Pink: NSGCF) ("Northstar" or the "Company") is pleased to announce a borehole electromagnetic (BHEM) and surface electromagnetic (EM) survey have commenced at the Cam Copper Mine area on the Company's
A recent 4-hole, Northstar diamond drill program at Cam Copper Mine confirmed a Volcanogenic Massive Sulphide (VMS) nature to the high-grade copper mineralization, with each hole intersecting massive chalcopyrite, high-grade copper horizons grading up to
The Cam Copper Crone Pulse-EM surveys are being conducted by Mississauga, Ontario based Crone Geophysics and Exploration Ltd. A surface EM survey will define Cam Copper VMS horizon extensions and conductors over a 900-metre strike length towards the southeast, with a priority to identify areas with thicker accumulations of Cu-rich massive sulphides (Figure 3). A borehole BHEM survey will also be conducted on the 4 Cam Copper diamond drill holes completed in 2023. Similar Pulse-EM technology and surveys lead to several previous VMS discoveries across Canada, including Hudbay Minerals' 2003 Lalor VMS deposit discovery in Manitoba.
To further enhance copper-rich VMS drill target definition, Ronacher Mackenzie Geoscience (RMG) will compile and model historic geophysical survey data, including the digitization of historic near-surface VLEM conductors and strongly chargeable and conductive I.P. anomalies (3), 3D plate model airborne EM conductors (4) and complete 3D inversions of historic magnetic data (5).
(1) Ontario Ministry of Energy, Northern Development and Mines Mineral Deposit Inventory Record MDI31M13NW000154: Tretheway-Ossian- 1981, Ch.H. Cameron-1981.
(2) Ontario Ministry of Energy, Northern Development and Mines and Mines Assessment File #KL-0259, Tretheway-Ossian (Cam Copper Mine). 1961
(3) Ontario Ministry of Energy, Northern Development and Mines and Mines Assessment File #KL-0843, Prospectus of Fidelity Mining Investments Ltd. 1962
(4) Ontario Geological Survey 2000. Airborne Magnetic and Electromagnetic Surveys, Kirkland Lake Area; Ontario Geological Survey, Map 82 040, scale 1: 20 000
(5) Ontario Ministry of Energy, Northern Development and Mines and Mines Assessment File #20009478, Magnetometer Survey Assessment Report - Boston Creek Project., David Laronde, 2011
Figure 1. Rosegrove and Miller Copper-Gold Properties
Highlighting Cam Copper Mine and the Boston Creek Copper Trend
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6839/203034_944be21324f0f9dd_002full.jpg
Figure 2. Cam Copper Mine - 3D Model and 2023 Phase 1 Drill Results
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6839/203034_944be21324f0f9dd_003full.jpg
New Au-Cu-Pb-Zn Sulphide Discoveries Southeast of the Cam Copper Mine
In the late fall of 2023, Northstar conducted a limited prospecting and sampling program covering the southeast extension of the Cam Copper VMS/exhalite trend along the contact with the Round Lake Batholith (Figure 3). The program, while abbreviated due to snow cover, included the collection of 15 grab samples from older workings and gossanous areas. Several semi-massive to massive sulphide samples collected in proximity to magnetic anomalies, historic ground and airborne EM conductors and IP bedrock targets returned anomalous values in Au (0 - 2.02 g/t Au), Ag (0.15 - 26.9 g/t), Cu (41 ppm - 27,900 ppm), Pb (0.9 ppm - 3340 ppm) and Zn (12ppm - 2070 ppm). These samples could represent extensions of VMS Zones 1 and 2 up to 900 metres along strike to the southeast of the Cam Copper Mine site.
Northstar intends to follow up 2023 Cam Copper trend surface sample and 2024 EM survey targets in the spring of 2024, with prospecting, geological mapping, sampling and a Phase II diamond drill program.
Figure 3. Cam Copper VMS Trend Geology, Geophysical Targets and EM Survey Area
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6839/203034_944be21324f0f9dd_004full.jpg
Quality Control
Samples collected in the 2023 Miller surface exploration and drilling programs were delivered to ALS Global in Timmins, Ontario for preparation and assayed for gold and other elements by ALS Global in Vancouver, British Columbia.
Northstar has implemented a quality control program for its Cam Copper Project to ensure best practice in the sampling and analysis of surface samples, which includes the insertion of blanks, and certified standards into the sample stream.
Surface samples were submitted to ALS Global at their Timmins, Ontario facility for sample preparation where the entire sample was crushed to better than
Qualified Person
All scientific and technical information contained in this News Release has been prepared under the supervision of Brian P. Fowler, P.Geo. President, CEO and Director of Northstar Gold Corp., a Qualified Person within the meaning of National Instrument 43-101.
About Northstar Gold Corp.
Northstar's primary exploration focus is to advance and expand our near-surface, bulk-tonnage gold-telluride and more recently discovered VMS copper mineral deposits on the Company's flagship,
Allied Gold Zone
Since going public by IPO in late 2020, Northstar has spent over
In April, 2022, as a precursor to a Mineral Resource Estimate and for reporting purposes, the Company commissioned Ronacher Mackenzie Geoscience and SRK Consulting (Canada) to conduct an Exploration Target Study of the Miller Property Allied Gold Zone and No. 1 Vein. An upper range exceeding 500,000 ounces of gold averaging 2.04 g/t Au has been referenced in this study. Reported results (Northstar News Release dated July 26, 2022) verify the significance, size and gold grade potential of the Allied gold mineralizing system. Results provide the Company and investors a fact-based conceptual tonnage and gold grade range for the Allied Syenite Gold Zone, and basis for continued expansion drilling and mineral resource development.
Cam Copper Mine
On November 23rd, 2023 Northstar announced results from a 720 metre, 4-hole diamond drill program completed on the historic high-grade Cam Copper Mine, located 2.5 kilometres southwest of the Allied Gold Zone and also on Northstar's
Cam Copper is a road accessible shaft mine and small-scale, past producer of high-grade 'direct shipping' copper ore centred on the historic Boston Creek Copper Trend.
Cam Copper Mine is centred on a newly recognized high-grade "Besshi-type" volcanogenic massive sulphide (VMS) copper system situated at the northwest end of a 0.9 km long southeast trending belt of VMS horizons. Besshi-type VMS deposits are an important global source of base metals, simplistically characterized as vented, broad sheet-like layers of magnetite, iron-copper-lead-zinc-arsenic sulphides, cobalt, sulphosalts, silver and possibly gold deposited on an ancient sea floor, hosted in volcano-sedimentary rock packages.
Northstar has commenced down-hole and grid-scale EM geophysical surveys at Cam Copper Mine to define Phase II drill targets in Q2, 2024.
Northstar is seeking a senior partner to conduct Allied Gold Zone lateral and depth expansion diamond drilling on the Miller Property.
Northstar's 3 additional
On behalf of the Board of Directors,
Mr. Brian P. Fowler, P.Geo.
President, CEO and Director
(604) 617-8191
bfowler@northstargoldcorp.com
Connect with us on Twitter | LinkedIn | Instagram
Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Statements
This news release contains certain forward-looking statements which involve known and unknown risks, delays, and uncertainties not under the control of Northstar Gold Corp. which may cause actual results, performance or achievements of Northstar Gold Corp. to be materially different from the results, performance or expectation implied by these forward looking statements. By their nature, forward looking statements involve risk and uncertainties because they relate to events and depend on factors that will or may occur in the future. Actual results may vary depending upon exploration activities, industry production, commodity demand and pricing, currency exchange rates, and, but not limited to, general economic factors.
Forward-looking statements in this news release are made as of the date hereof and the Company assumes no obligation to update any forward-looking statements, except as required by applicable laws.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/203034
FAQ
What surveys have commenced at the Cam Copper Mine area on Northstar Gold Corp.'s Miller Copper-Gold Property?
What did the recent 4-hole diamond drill program confirm at Cam Copper Mine?
What are the key findings of the prospecting and sampling program conducted by Northstar in late fall of 2023?
Who is conducting the Cam Copper Crone Pulse-EM surveys?