New Pacific Intersects 505 Metres Grading 1.22 Grams Per Tonne Gold at the Carangas Project, Bolivia
New Pacific Metals Corp. (NYSE: NEWP) announced assay results from four deep drill holes at its Carangas Silver-Gold Project in Bolivia. A total of 50,368 m was drilled in 2022, with results from 43 holes released. Notable intercepts include hole DCAr0094, with a 504.62 m gold interval grading 1.22 g/t Au and 13 g/t Ag. The company plans to drill an additional 15,000 m in Q1 2023 to expand gold mineralization and will conduct a resource estimate in Q2 2023. New Pacific's rigorous quality control measures ensure the reliability of the results, as verified by its qualified personnel.
- Hole DCAr0094 reported a significant gold interval of 504.62 m grading 1.22 g/t Au.
- Carangas Project plans to drill 15,000 m in Q1 2023 to test new gold mineralization areas.
- Inaugural resource estimate planned for Q2 2023, indicating potential for project development.
- Assay results from 72 drill holes are still pending, indicating uncertainty in overall mineralization assessment.
A total of 50,368 m was drilled in 115 holes at the
Hole DCAr0094 intersected, from 228.5 m to 733.12 m, a 504.62 m gold interval grading 1.22 grams per tonne ("g/t") gold ("Au") and 13 g/t silver ("Ag"), including a 124.69 m higher grade interval (from 479.46 m to 604.15 m) grading 2.77 g/t Au, 14 g/t Ag and
Hole DCAr0067 intersected, from 24.27 m to 166.0 m, a 141.73 m silver interval grading 119 g/t AgEq, comprising 67 g/t Ag,
Hole DCAr0078 intersected, from 24.2 m to 174.4 m, a 150.20 m silver interval grading 45 g/t AgEq, comprising 12 g/t Ag,
Hole DCAr0081 intersected, from 4.93 m to 136.72 m, a 131.79 m silver interval grading 93 g/t AgEq, comprising 42 g/t Ag,
The Company plans to drill 15,000 m during the first quarter of 2023 at Carangas to test the eastern extension of gold mineralization beneath the East Dome and expand parts of the shallow silver horizon. Following this drill program, an inaugural resource estimate is planned in the second quarter of 2023.
Table 1 Summary of Drill Intercepts | ||||||||||
Hole_ID | Depth_from | Depth_to | Interval_m | Ag_g/t | Au_g/t | Pb_% | Zn_% | Cu_% | AgEq_g/t | |
DCAr0067 | 24.27 | 166.00 | 141.73 | 67 | 0.03 | 0.43 | 1.03 | 0.03 | 119 | |
incl. | 62.15 | 86.53 | 24.38 | 251 | 0.02 | 0.69 | 1.66 | 0.03 | 331 | |
171.34 | 685.00 | 513.66 | 7 | 0.72 | 0.07 | 0.07 | 0.05 | 68 | ||
incl. | 450.42 | 562.53 | 112.11 | 9 | 1.82 | 0.04 | 0.03 | 0.07 | 148 | |
DCAr0078 | 24.20 | 174.40 | 150.20 | 12 | 0.02 | 0.22 | 0.69 | 0.02 | 45 | |
179.30 | 848.00 | 668.70 | 5 | 0.48 | 0.09 | 0.22 | 0.05 | 54 | ||
DCAr0081 | 4.93 | 136.72 | 131.79 | 42 | 0.02 | 0.51 | 0.95 | 0.02 | 93 | |
141.50 | 545.75 | 404.25 | 7 | 0.42 | 0.18 | 0.45 | 0.03 | 60 | ||
579.20 | 664.74 | 85.54 | 6 | 0.65 | 0.01 | 0.05 | 0.10 | 64 | ||
DCAr0094 | 47.65 | 149.23 | 101.58 | 18 | 0.07 | 0.20 | 0.85 | 0.06 | 64 | |
228.50 | 733.12 | 504.62 | 13 | 1.22 | 0.08 | 0.07 | 0.06 | 110 | ||
incl. | 479.46 | 604.15 | 124.69 | 14 | 2.77 | 0.05 | 0.01 | 0.11 | 224 | |
incl. | 559.42 | 604.15 | 44.73 | 19 | 5.03 | 0.03 | 0.01 | 0.16 | 395 |
Notes: | |
Figure 1 Simplified Geology and Drill Plan Map of Carangas
Table 2 Summary of Drill Holes of | ||||||||
Hole_ID | Easting | Northing | Altitude | Depth_m | Azimuth (°) | Dip (°) | Date_completion | Target |
DCAr0067 | 539013.65 | 7905184.23 | 3905.17 | 688.00 | 20 | -70 | CV | |
DCAr0078 | 539093.76 | 7905104.69 | 3905.74 | 848.00 | 20 | -70 | CV | |
DCAr0081 | 538950.83 | 7905156.27 | 3904.67 | 1004.00 | 20 | -70 | CV | |
DCAr0094 | 538957.18 | 7905202.16 | 3905.03 | 800.00 | 49 | -55 | CV | |
Note: | 1. Drill collar coordinate system is | |||||||
2. Coordinate of drill collar is picked with Real Time Kinematics (RTK) GPS | ||||||||
3. CV - | ||||||||
The Company maintains tight sample security and QA/QC for all aspects of its exploration program at the
The scientific and technical information contained in this news release has been reviewed and approved by
New Pacific is a Canadian exploration and development company with precious metal projects in
For further information, please contact:
Phone: (604) 633-1368 Ext. 222
E-mail: invest@newpacificmetals.com
For additional information and to receive company news by e-mail, please register using New Pacific's website at www.newpacificmetals.com.
Certain of the statements and information in this news release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. Such statements include, but are not limited to: statements regarding anticipated exploration, drilling, development, construction, and other activities or achievements of the Company; timing of receipt of permits and regulatory approvals; timing and content of the PEA, and estimates of the Company's revenues and capital expenditures; and other future plans, objectives or expectations of the Company.
The PEA study results of
Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: global economic and social impact of COVID-19; fluctuating equity prices, bond prices, commodity prices; calculation of resources, reserves and mineralization, general economic conditions, foreign exchange risks, interest rate risk, foreign investment risk; loss of key personnel; conflicts of interest; dependence on management, uncertainties relating to the availability and costs of financing needed in the future, environmental risks, operations and political conditions, the regulatory environment in
This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information.
The forward-looking statements are necessarily based on a number of estimates, assumptions, beliefs, expectations and opinions of management as of the date of this news release that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates, assumptions, beliefs, expectations and options include, but are not limited to, those related to the Company's ability to carry on current and future operations, including: the duration and effects of COVID-19 on our operations and workforce; development and exploration activities; the timing, extent, duration and economic viability of such operations; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; the Company's ability to meet or achieve estimates, projections and forecasts; the stabilization of the political climate in
Although the forward-looking statements contained in this news release are based upon what management believes are reasonable assumptions, there can be no assurance that actual results will be consistent with these forward-looking statements. All forward-looking statements in this news release are qualified by these cautionary statements. Accordingly, readers should not place undue reliance on such statements. Other than specifically required by applicable laws, the Company is under no obligation and expressly disclaims any such obligation to update or alter the forward-looking statements whether as a result of new information, future events or otherwise except as may be required by law. These forward-looking statements are made as of the date of this news release.
This news release has been prepared in accordance with the requirements of the securities laws in effect in
Additional information relating to the Company, including the Company's Annual Information Form, can be obtained under the Company's profile on SEDAR at www.sedar.com, on EDGAR at www.sec.gov, and on the Company's website at www.newpacificmetals.com.
View original content to download multimedia:https://www.prnewswire.com/news-releases/new-pacific-intersects-505-metres-grading-1-22-grams-per-tonne-gold-at-the-carangas-project-bolivia-301729127.html
SOURCE
FAQ
What were the significant findings from New Pacific's recent drilling at the Carangas Project?
How much drilling was conducted at the Carangas Project in 2022?
What is the planned drilling for New Pacific in 2023 at the Carangas Project?
When is the inaugural resource estimate for the Carangas Project scheduled?