NICKEL CREEK PLATINUM EXTENDS HIGH GRADE NICKEL-COPPER-PGE MINERALIZATION AT ARCH TARGET - DRILLS 2.57% Ni, 1.61% Cu AND 2.35 g/t TPM OVER 3.84 m
Nickel Creek Platinum Corp. (TSX: NCP, OTCQB: NCPCF) announced promising results from its 2022 drill program at the Arch Target in Yukon, Canada. Drilling revealed a significant sulphide interval grading 2.57% nickel, 1.61% copper, and 2.35 g/t Total Precious Metals over 3.84 meters, extending the known mineralization from 2021. The program included 18 holes totaling 2,975 meters, with 10 holes on the Arch Target. The results indicate significant near-surface mineralization at depths of 7-170 meters. While the Prefeasibility Study (PFS) for the Wellgreen deposit is due by July 2023, the Arch Target will not be included, but ongoing assessments may outline a maiden inferred resource there. The company noted the potential for additional high-grade mineralization opportunities.
- High-grade mineralization intersected: 2.57% Ni, 1.61% Cu, 2.35 g/t TPM over 3.84 m.
- Drilling extended massive to disseminated sulphide mineralization at depth.
- Near-surface mineralization shows potential with significant grades at shallow depths.
- Geophysical results indicate further untested conductivity down-dip.
- Arch Target will not be included in the upcoming Prefeasibility Study (PFS) for Wellgreen.
HIGHLIGHTS OF THE DRILL RESULTS AT ARCH:
- A massive sulphide interval grading
2.57% nickel (Ni),1.61% copper (Cu) and 2.35 g/t TotalPrecious Metals (TPM) over 3.84 m was intersected down-dip of semi-massive to massive sulphide mineralization drilled in 2021 (see Photo 1 for core sample and Table 1 for drill intersection details). - Significant disseminated + semi-massive sulphide intervals grading 0.29 to
0.67% Ni, 0.08 to0.43% Cu and 0.43 to 1.64 g/t TPM over 6.25 to 78.95 m intervals in 7 holes (see Table 1 for details). - Geophysics results show untested conductivity down-dip and along strike of current drilling.
- Near surface massive to disseminated sulphide mineralization at depths of 7-170 m.
The drilling component of the 2022 exploration program comprised 18 holes totalling 2,975 metres (m), of which 10 holes totalling 1,265 m were drilled on the Arch Target at the Nickel Shäw Project. The drilling at Arch was successful in extending massive to disseminated Ni-Cu sulphide mineralization at depth and along strike from holes drilled in 2021. See Figure 1 for a general plan map of the areas. Eight (8) holes were drilled on the Wellgreen deposit (1,710 m) to convert inferred mineral resources to indicated mineral resources and to collect additional geotechnical and hydrogeological data. The 1,710 metres of drilling at Wellgreen was carried out to support the completion of a Prefeasibility Study (PFS) which is expected to be completed by
"We have demonstrated the continuity of sulphide mineralization at the Arch Target including its significant Nickel, Copper,
Table 1: Arch Drilling Summary
Note: All intervals listed are down-hole core lengths, not true widths; interval grades are length weighted. A cut-off grade of
The Arch ultramafic sill has been the subject of several historical exploration campaigns and has had various surveys, including ground electromagnetics (EM) and magnetics, helicopter EM and magnetics (Dighem), soil geochemistry, trenching and limited diamond drilling (three holes totalling 136m). Drilling in 2021 at the Arch Target intersected significant massive to semi-massive sulphide in six holes. Grades up to
During the 2022 drill program, a massive sulphide interval grading
Sulphide mineralization at Arch occurs at the base of an outcropping ultramafic sill ("Arch Sill") that is centred four kilometres west-northwest of the Wellgreen deposit. The sill is approximately 100 m thick and the base (northeast contact) dips subparallel to the slope at 55-75 degrees to the south-southwest. Massive and semi-massive sulphide mineralization is related to a thin (<2 metres) marginal gabbro unit that occurs below a distinctive Mottled Peridotite unit. The high-grade sulphide occurs at the marginal gabbro/footwall contact. Footwall rocks typically consist of Hasen Creek Formation meta-sediments. The ultramafic
One (1) 2022 Arch hole was surveyed by borehole electromagnetics (EM) along with 14 surface EM lines totalling approximately 4,200 m. Geophysical results show untested conductivity down-dip and to the northeast of the 2021/22 drilling. Field-checking of near-surface conductors to the northeast is required. Diamond drilling was performed by Superior
As part of the 2022 drill program, existing drill trails were upgraded to allow truck access to all drill sites.
Analytical quality assurance and quality control ("QAQC") included submission of blanks and standards. Various standards were submitted that are appropriate for both low-grade and high-grade Ni-Cu-PM mineralization. Results from the standards and blanks were reviewed and in the opinion of the Qualified Person, the analytical results pass QAQC review for base metals and PMs in the low-grade type (disseminated sulphide) mineralization as well as the base metals in the high-grade (semi-massive to massive sulphide) mineralization. Analytical QAQC for precious metals in the higher-grade mineralization is still pending. Sample preparation was completed at the ALS facility in
See Table 2 for Arch drill hole location information.
Table 2:
Note:
Drilling at the Wellgreen deposit was completed to facilitate hydrogeology studies, geotechnical studies and resource conversion. This work is part of the ongoing PFS that is expected to be completed by
Scientific and Technical Information
The scientific and technical information disclosed in this news release was prepared under the supervision
About
Cautionary Note Regarding Forward-Looking Information
This news release includes certain information that may be deemed "forward-looking information". Forward-looking information can generally be identified by the use of forward-looking terminology such as "may", "will", "expect", "intend", "believe", "continue", "plans" or similar terminology, or negative connotations thereof. All information in this release, other than information of historical facts, including, without limitation, statements with respect to plans for further exploration to help define the extent of the mineralized zone, plans to advance Arch, plans to advance the Wellgreen deposit towards a PFS, and general future plans and objectives for the Company and the Nickel Shäw Project, are forward-looking information that involve various risks and uncertainties. Although the Company believes that the expectations expressed in such forward-looking information are based on reasonable assumptions, such expectations are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking information.
For more information on the Company and the key assumptions, risks and challenges with respect to the forward-looking information discussed herein, and about our business in general, investors should review the Company's most recently filed annual information form, and other continuous disclosure filings which are available at www.sedar.com. Readers are cautioned not to place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
View original content to download multimedia:https://www.prnewswire.com/news-releases/nickel-creek-platinum-extends-high-grade-nickel-copper-pge-mineralization-at-arch-target--drills-2-57-ni-1-61-cu-and-2-35-gt-tpm-over-3-84-m-301794846.html
SOURCE
FAQ
What are the latest drill results for Nickel Creek Platinum Corp (NCPCF)?
When is the Prefeasibility Study (PFS) for Nickel Creek Platinum's Wellgreen deposit expected?
What depths were the nickel-copper mineralizations found at the Arch Target?
What is the significance of the Arch Target results for NCPCF investors?