Murchison Announces Summer 2021 Drill Program at the Betty Zone on the 100% Owned Brabant Lake Project
Murchison Minerals Ltd. (TSXV:MUR) has secured QB Diamond Drilling Ltd. for a 600-meter diamond drilling program at the Betty Zone in Saskatchewan, starting July 2021. The drilling will consist of two holes targeting a geophysical anomaly identified earlier. The Betty Zone shows potential for economic zinc, copper, and silver mineralization, with previous drilling intersecting high-grade mineralization. A new permit for additional drilling at both the Betty Zone and Brabant-McKenzie Deposit has been submitted. The Brabant Lake project spans 629 square kilometers.
- Drilling program to commence in July 2021 at Betty Zone, indicating active exploration.
- Previous drilling showed high-grade mineralization: 4.40% zinc, 1.33% copper, and 12.95 g/t silver.
- Potential economic zinc-copper-silver deposits in the Betty Zone.
- A new permit submitted for additional drilling, indicating plans for continued exploration.
- No significant negative factors identified.
TORONTO, ON / ACCESSWIRE / June 17, 2021 / Murchison Minerals Ltd. (TSXV:MUR) ("Murchison" or the "Company") is pleased to announce that it has secured QB Diamond Drilling Ltd. of Creighton, Saskatchewan to conduct diamond drilling at the newly-defined Betty Zone borehole geophysical anomaly. The 600 metre (minimum) program will consist of two diamond drill holes targeting the Betty Zone and will commence in July of 2021. Only two holes were selected for the program at this time to fit within existing drill permit constraints, and a new permit to conduct additional drilling at the Betty Zone, as well as the Brabant-McKenzie Deposit, have already been submitted for approval for future additional drilling.
Figure 1: Oblique view looking north-northeast of the 2021 Betty Zone drill holes displaying Zinc Equivalent percentages as derived from assays, the interpreted electromagnetic plate from the downhole geophysical survey, and the planned holes for the summer 2021 drill program.
Murchison is eager to commence drill testing as the Company feels that the Betty Zone is highly prospective to host economic zinc, copper and silver mineralization. The claims hosting the Betty Zone were acquired earlier this year and subsequently tested with two diamond drills, both of which narrowly missed a large electromagnetic ("EM") conductor located by a subsequent borehole EM survey (Figure 1). The borehole EM anomaly corresponds with high grade but narrow semi-massive sulphide mineralization that was observed in both holes. The best intercept from the winter 2021 drill program was observed in hole BZ21-002 which intersected
Figure 2: Location map of the proposed drill holes on the Betty Zone
The Betty Zone is located approximately one kilometre northeast of the Brabant-McKenzie Deposit (Figure 2 & 3) and is along strike. The observed mineralization and corresponding metamorphosed VMS-type alteration in the 2021 winter Betty Zone drill holes appears similar to what is observed at the Brabant-McKenzie Deposit. Initial modelling suggests the measured offhole borehole anomaly has the potential for 700 m long strike length, which is also supported by airborne VTEM data. The measured conductivity of the geophysical anomaly is similar to what is observed at the Brabant-McKenzie Deposit.
Figure 3: Location map of the Brabant Project displaying the location of the Betty Zone labelled with a red star.
Qualifying Statement
The foregoing scientific and technical disclosures on the Brabant Lake project have been reviewed by John Shmyr, P.Geo., VP Exploration. Mr. Shmyr is a Qualified Person as defined by National Instrument 43-101.
About the Brabant Lake Project
The Brabant Lake project is located 175 kilometres northeast of La Ronge, Saskatchewan and approximately three kilometres from the community of Brabant Lake. The area is accessed year-round via provincial Highway 102 and is serviced by grid power. The project consists of one mining lease, which hosts the Brabant-McKenzie VMS deposit, and additional mineral claims totalling 629 square kilometres, which cover approximately 57 kilometres of strike length over favourable geological horizons, multiple known mineralized showings and identified geophysical conductors.
Mineral resource Summary for Brabant-McKenzie VMS Deposit
The below Mineral resource estimate for the Brabant-McKenzie VMS Deposit was prepared by independent qualified person ("QP") Finley Bakker, P.Geo., and has an effective date of September 4, 2018. The NI 43-101 Technical Report named Technical Report on the Resource Estimate Update for the Brabant-McKenzie Property, Brabant Lake, Saskatchewan is available on the Company's website and on SEDAR.
Category | Tonnes | Zn % | Cu % | Pb % | Au (g/t) | Ag (g/t) | Zn Eq (%) |
Indicated | 2,100,000 | 7.08 | 0.69 | 0.49 | 0.23 | 39.6 | 9.98 |
Inferred | 7,600,000 | 4.46 | 0.57 | 0.19 | 0.10 | 18.4 | 6.29 |
The Mineral resource of the Brabant-McKenzie VMS Deposit was estimated based on metal prices of USD
About Murchison Minerals Ltd. (TSXV: MUR)
Murchison is a Canadian‐based exploration company focused on the exploration and development of the
Additional information about Murchison and its exploration projects can be found on the Company's website
at www.murchisonminerals.com.
For further information, please contact:
Jean‐Charles (JC) Potvin, President and CEO
jcpotvin@murchisonminerals.com
Erik H Martin, CFO
Tel: (416) 350‐3776
info@murchisonminerals.com
CHF Capital Markets
Thomas Do, IR Manager
Tel: 416-868-1079 x 232
thomas@chfir.com
Forward‐Looking Information
Certain information set forth in this news release may contain forward‐looking information that involves substantial known and unknown risks and uncertainties. This forward‐looking information is subject to numerous risks and uncertainties, certain of which are beyond the control of the Company, including, but not limited to, the impact of general economic conditions, industry conditions, and dependence upon regulatory approvals. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward‐looking information. The parties undertake no obligation to update forward‐looking information except as otherwise may be required by applicable securities law.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SOURCE: Murchison Minerals Ltd.
View source version on accesswire.com:
https://www.accesswire.com/652143/Murchison-Announces-Summer-2021-Drill-Program-at-the-Betty-Zone-on-the-100-Owned-Brabant-Lake-Project
FAQ
What is the recent announcement by Murchison Minerals Ltd. (MUR)?
What are the targets of the drilling program at the Betty Zone?
What were the results of previous drilling at the Betty Zone?
How large is the Brabant Lake project where the Betty Zone is located?