STOCK TITAN

Lumina Gold Announces Cangrejos Drill Results; 1.55 g/t Gold Equivalent Over 184 Metres at Cangrejos

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

Lumina Gold Corp. announced promising drill results from its Cangrejos project in Ecuador, highlighting notable grades of gold equivalent. Hole C22-151 reported 1.11 g/t gold equivalent over 260 metres, while C22-156 showed 1.55 g/t over 184 metres, including a peak of 1.98 g/t over 126 metres. The drilling campaign has completed 27 holes and is ongoing, with six drill rigs operational. These results indicate strong mineralization continuity, extending beyond previous economic assessments, enhancing the project’s attractiveness.

Positive
  • Drill results indicate significant gold equivalent grades: 1.11 g/t over 260m and 1.55 g/t over 184m.
  • Ongoing drilling campaign with 27 holes completed, total of 11,785 metres drilled.
  • High-grade mineralization continues beyond previous Preliminary Economic Assessment limits.
Negative
  • None.

Highlights include:

Hole C22-151

  • 1.11 g/t gold equivalent over 260 metres from surface at Cangrejos

Hole C22-156

  • 1.55 g/t gold equivalent over 184 metres at Cangrejos
  • Including 1.98 g/t gold equivalent over 126 metres

Hole C22-157

    • 0.84 g/t gold equivalent over 360 metres from surface at Gran Bestia
    •  

Including 1.17 g/t gold equivalent over 110 metres

VANCOUVER, BC, March 15, 2022 /PRNewswire/ - Lumina Gold Corp. (TSXV: LUM) (OTCQX: LMGDF) (the "Company" or "Lumina") is pleased to announce results from seven drill holes at its Cangrejos project (the "Project") in Ecuador. Five of the reported drill holes are from Cangrejos and two are from Gran Bestia. To date, twenty-seven drill holes have been completed and six drill holes are in progress, totalling 11,785 metres of drilling. Six drill rigs are currently on site and two additional drill rigs will join the campaign at the end of March. One of the new drill rigs will initially be dedicated to geotechnical and hydrological drilling in support of the Pre-feasibility Study ("PFS").

Holes C22-151, C22-153 and C22-158 were drilled in the western and central portions of the Cangrejos deposit where high grades largely occur within intrusive and hydrothermal breccias. The breccias are locally cut by a later phase of weakly mineralized porphyry, which was the predominate rock type intercepted in hole C22-153. Hole C22-158 contained mineralization that continued laterally beyond the pit limits defined by the 2020 Preliminary Economic Assessment ("PEA").

At Gran Bestia, mineralization is largely hosted in breccia. C22-155 and C22-157 exhibit strong mineralized grade continuity from surface and extend beyond the current PEA pit limits. While most drilling to date at Gran Bestia is in-fill, an exploration hole (C22-160) has been angled to the northwest into un-drilled terrain where the resource is open. The drill hole has been completed and results are pending.

Table 1: Drill Results

Hole

Deposit /

Azimuth / Dip (°)

From
(m)

To
(m)

Interval
(m)

Au
(g/t)

Cu
(%)

Au Eq
(g/t)

Cu Eq
(%)

Total
Depth
(m)

C21-150

Cangrejos

2

168

166

0.56

0.04

0.67

0.49

546

Incl.

330 °/ -85 °

62

96

34

0.94

0.64

1.05

0.76


And


312

322

10

0.24

0.05

0.32

0.24


And


368

378

10

0.47

0.04

0.54

0.4


And


460

470

10

0.30

0.02

0.33

0.24












C21-151

Cangrejos

0

260

260

0.96

0.09

1.11

0.81

460

Incl.

330° / -65°

50

176

126

1.27

0.09

1.41

1.03


And


202

228

26

1.57

0.17

1.84

1.34












C21-153

Cangrejos

122

136

14

0.41

0.07

0.53

0.38

640

And

330° /-66°

518

552

34

0.22

0.05

0.30

0.22


And


568

578

10

0.28

0.05

0.35

0.26












C22-155

Gran Bestia

2

120

118

0.32

0.04

0.38

0.28

343

And

0° / -90°

212

294

82

0.32

0.04

0.38

0.28












C22-156

Cangrejos

12

64

52

0.26

0.04

0.30

0.22

509

And

150° /-84°

106

148

42

0.34

0.04

0.40

0.29


And


248

432

184

1.33

0.14

1.55

1.13


Incl.


256

382

126

1.74

0.16

1.98

1.44












C22-157

Gran Bestia

0

316

316

0.7

0.09

0.84

0.61

336

Incl.

330° /-62°

16

126

110

1.03

0.09

1.17

0.86












C22-158

Cangrejos

6

18

12

0.45

0.09

0.61

0.45

470

And

330° / -50°

90

106

16

0.24

0.15

0.47

0.34


And


212

358

146

0.34

0.08

0.46

0.33


Incl.


264

280

16

0.68

0.09

0.81

0.59


And


424

434

10

0.40

0.04

0.47

0.34


Note: Intervals in the reported holes are calculated using a cut-off of 0.2 g/t Au with maximum internal dilution of ten continuous metres. Sampling is done in consistent, continuous 2-metre intervals. The highest gold value used in the reported weighted averages is 7.557 g/t Au. In addition to the above results there were multiple intercepts of lower-grade material in the drill holes. Equivalent values were calculated using Gold equivalent values were calculated using the following prices: a gold price of US$1,500 per ounce, a copper price of US$3.00 per pound, a molybdenum price of US$7.00 per pound and a silver price of US$18.00 per ounce.

Figure 1: Drill Hole Location Map (CNW Group/Lumina Gold Corp.)

Quality Assurance

All Lumina sample assay results have been independently monitored through a quality control / quality assurance ("QA/QC") program that includes the insertion of blind standards, blanks and pulp and reject duplicate samples. Logging and sampling are completed at Lumina's secure facility located at the Cangrejos Project. Drill core is sawn in half on site and half drill-core samples are securely transported to either Bureau Veritas Labs' (BV) or ALS Labs' ("ALS") sample preparation facilities in Quito, Ecuador. Sample pulps are sent to BV's or ALS' chemical labs in Lima, Peru for analysis. Gold content is determined by fire assay of a 30 gram charge with total copper content determined by four-acid digestion with ICP finish. Both labs are independent from Lumina.

Lumina is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data referred to herein.

Qualified Persons

Leo Hathaway, P.Geo., Senior Vice President of Lumina and the Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects for the Cangrejos Project has reviewed, verified and approved the contents of this news release and has verified the data underlying the contents of this news release.

About Lumina Gold

Lumina Gold Corp. (TSXV: LUM) is a Vancouver, Canada based precious and base metals exploration and development company focused on the Cangrejos Gold-Copper Project located in El Oro Province, southwest Ecuador. Cangrejos is being advanced to a Pre-Feasibility Study and is the largest primary gold deposit in Ecuador. Lumina has an experienced management team with a successful track record of advancing and monetizing exploration projects.

Follow us on: Twitter, Linkedin or Facebook.

Further details are available on the Company's website at https://luminagold.com/. To receive future news releases please sign up at https://luminagold.com/contact.

LUMINA GOLD CORP.

Signed: "Marshall Koval"

Marshall Koval, President & CEO, Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Information

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to adding additional drill rigs at the end of March. Often, but not always, forward-looking statements or information can be identified by the use of words such as "will" or "projected" or variations of those words or statements that certain actions, events or results "will", "could", "are proposed to", "are planned to", "are expected to" or "are anticipated to" be taken, occur or be achieved.

With respect to forward-looking statements and information contained herein, the Company has made numerous assumptions including among other things, assumptions about general business and economic conditions, the prices of gold and copper, and anticipated costs and expenditures. The foregoing list of assumptions is not exhaustive.

Although management of the Company believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that a forward-looking statement or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the Company's actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to: risks associated with the business of the Company; business and economic conditions in the mining industry generally; the supply and demand for labour and other project inputs; changes in commodity prices; changes in interest and currency exchange rates; risks relating to inaccurate geological and engineering assumptions (including with respect to the tonnage, grade and recoverability of reserves and resources); risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters); risks relating to adverse weather conditions; political risk and social unrest; changes in general economic conditions or conditions in the financial markets; and other risk factors as detailed from time to time in the Company's continuous disclosure documents filed with Canadian securities administrators. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/lumina-gold-announces-cangrejos-drill-results-1-55-gt-gold-equivalent-over-184-metres-at-cangrejos-301502388.html

SOURCE Lumina Gold Corp.

FAQ

What were the drill results for Lumina Gold Corp. on March 15, 2022?

The results included significant grades such as 1.11 g/t gold equivalent over 260 metres from Hole C22-151 and 1.55 g/t over 184 metres from Hole C22-156.

How many drill holes have been completed at the Cangrejos project?

A total of 27 drill holes have been completed at the Cangrejos project.

What is the depth of the drilling campaign in the Cangrejos project?

The drilling campaign has reached a total depth of 11,785 metres.

Which holes showed continuity beyond the Preliminary Economic Assessment limits?

Holes C22-157 and C22-158 reported mineralization extending beyond previous PEA limits.

LUMINA GOLD CORP

OTC:LMGDF

LMGDF Rankings

LMGDF Latest News

LMGDF Stock Data

149.77M
271.07M
33.98%
0.4%
Gold
Basic Materials
Link
United States of America
Vancouver