LIFT Intersects 17 m at 1.28% Li2O at the Shorty Pegmatite and 21 m at 1.08% Li2O at the BIG East Pegmatite, Yellowknife Lithium Project, NWT
- Drilling at the Shorty and BIG East pegmatites within the Yellowknife Lithium Project has intersected significant intervals of spodumene mineralization.
- Highlights include YLP0050 with 17m at 1.28% Li2O, YLP0055 with 17m at 1.14% Li2O, YLP0052 with 15m at 1.27% Li2O, and YLP0053 with 10m at 0.76% Li2O.
- To date, 58 drill holes (10,222 meters) have been reported, and a total of 8,933 kilograms of rock has been collected for metallurgical testing.
- None.
Vancouver, British Columbia--(Newsfile Corp. - October 12, 2023) - Li-FT Power Ltd. (CSE: LIFT) (OTCQX: LIFFF) (FSE: WS0) ("LIFT" or the "Company") is pleased to report assays from 5 drill holes completed at the Shorty, and BIG East pegmatites within the Yellowknife Lithium Project ("YLP") located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling has intersected significant intervals of spodumene mineralization, with the following highlights:
Highlights:
- YLP0050: 17 m at
1.28% Li2O, including 6 m at1.76% Li2O (Shorty) - YLP0055: 17 m at
1.14% Li2O, including 14 m at1.36% Li2O (Shorty) - YLP0052: 15 m at
1.27% Li2O, including 9 m at1.74% Li2O (BIG East) - YLP0053: 10 m at
0.76% Li2O, including 5 m at1.39% Li2O (BIG East)
and: 21 m at1.08% Li2O, including 4 m at2.09% Li2O
and: 8 m at1.26% Li2O.
Discussion of Drill Results
Shorty Pegmatite: Drill Hole YLP0050 was collared just to the south of the center of the Shorty dyke. It intercepted 17 metres of
BIG East Pegmatite: Drill hole YLP0052 was collared just southwest of the center of the dyke, where it intercepted 15 metres of
Spodumene is the primary lithium mineral constituent of the dykes and occurs with varying amounts of quartz, feldspar, and muscovite. All the dykes are in amphibolite-grade Burwash Formation metasediments.
Drilling and Bulk Sampling Progress Update
Currently, LIFT has reported results from 58 drill holes (10,222 metres). To date, 179 diamond drill holes have been completed (28,376 metres). A total of 8,933 kilograms of rock has been collected from eight pegmatites in saw-cut channels for metallurgical testing (approximately 1,000 kilograms at each pegmatite). Bulk samples have been shipped to SGS Lakefield for preliminary metallurgical testing.
Figure 1 - Location of LIFT's Yellowknife Lithium Project. Drilling is focused on the Road Access Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/183694_60ae903594fcb863_001full.jpg
Figure 2 - Plan view showing the surface expression of the Shorty pegmatite with diamond drill hole reported in this press release.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/183694_60ae903594fcb863_002full.jpg
Figure 3 - Cross-section of YLP0050 which intersected the Shorty pegmatite dyke with a 17 m interval of
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/183694_60ae903594fcb863_003full.jpg
Figure 4 - Cross-section of YLP0055 which intersected 17 metres at
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/183694_60ae903594fcb863_004full.jpg
Figure 5 - Plan view showing the surface expression of the BIG East pegmatite with diamond drill holes reported in this press release.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/183694_60ae903594fcb863_005full.jpg
Figure 6 - Cross-section illustrating YLP0053 and YLP0056 with results as shown in the BIG-E pegmatite dyke.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/183694_60ae903594fcb863_006full.jpg
Table 1 - Assay highlights for drill holes reported in this press release.
Hole No. | From (m) | To (m) | Interval (m) | Li2O% | Dyke |
YLP0050 | 42 | 59 | 17 | 1.28 | Shorty |
inc | 42 | 50 | 8 | 1.21 | |
inc | 53 | 59 | 6 | 1.76 | |
YLP0052 | 29 | 44 | 15 | 1.27 | BIG-E |
inc | 31 | 40 | 9 | 1.74 | |
YLP0053 | 71 | 81 | 10 | 0.76 | BIG-E |
inc | 73 | 78 | 5 | 1.39 | |
and | 96 | 101 | 5 | 0.90 | |
and | 103 | 111 | 8 | 0.24 | |
and | 117 | 138 | 21 | 1.08 | |
inc | 118 | 122 | 4 | 2.09 | |
inc | 126 | 134 | 8 | 1.26 | |
YLP0055 | 48 | 65 | 17 | 1.14 | Shorty |
inc | 50 | 64 | 14 | 1.36 | |
YLP0056 | 21 | 29 | 8 | 1.07 | BIG-E |
inc | 22 | 27 | 5 | 1.54 | |
and | 58 | 67 | 9 | 1.36 | |
inc | 59 | 66 | 7 | 1.61 |
Table 2 - Drill collars table of reported drill holes in this press release
Drill Hole | Easting1 | Northing1 | Elevation (m) | Azimuth | Depth (m) | Dip | Dyke |
YLP0050 | 372,784 | 6,938,010 | 256 | 127 | 92 | 47 | Shorty |
YLP0052 | 346,059 | 6,933,031 | 208 | 123 | 86 | 48 | BIG-E |
YLP0053 | 346,064 | 6,933,211 | 210 | 123 | 191 | 44 | BIG-E |
YLP0055 | 372,754 | 6,937,967 | 257 | 127 | 80 | 50 | Shorty |
YLP0056 | 346,135 | 6,933,169 | 212 | 123 | 101 | 45 | BIG-E |
1UTM NAD83 zone 12
QA/QC and Core Sampling Protocols
All drill core samples were collected under the supervision of LIFT employees and contractors. Drill core was transported from the drill platform to the logging facility where it was logged, photographed, and split by diamond saw prior to being sampled. Samples were then bagged, and blanks and certified reference materials were inserted at regular intervals. Field duplicates consisting of quarter-cut core samples were also included in the sample runs. Groups of samples were placed in large bags, sealed with numbered tags in order to maintain a chain-of-custody, and transported from LIFT's core logging facility to ALS Labs ("ALS") laboratory in Yellowknife, Northwest Territories.
Sample preparation and analytical work for this drill program were carried out by ALS. Samples were prepared for analysis according to ALS method CRU31: individual samples were crushed to
Qualified Person
The disclosure in this news release of scientific and technical information regarding LIFT's mineral properties has been reviewed and approved by Carl Verley, P.Geo., Vice-President, Exploration of LIFT and a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101).
LIFT Engages Winning Media
LIFT is pleased to announce that it has engaged Winning Media LLC ("Winning Media") to provide investor relations and digital advertising services to the Company. Winning Media is a Houston, Texas based marketing agency that specializes in digital and corporate brand marketing services to enhance corporate visibility and retail investor awareness. The engagement of Winning Media will extend for a period of 30 days, to commence when authorized by the Company. Winning Media will be paid a fee of US
About LIFT
LIFT is a mineral exploration company engaged in the acquisition, exploration, and development of lithium pegmatite projects located in Canada. The Company's flagship project is the Yellowknife Lithium Project located in Northwest Territories, Canada. LIFT also holds three early-stage exploration properties in Quebec, Canada with excellent potential for the discovery of buried lithium pegmatites, as well as the Cali Project in Northwest Territories within the Little Nahanni Pegmatite Group.
For further information, please contact:
Francis MacDonald
Chief Executive Officer
Tel: + 1.604.609.6185
Email: info@li-ft.com
Daniel Gordon
Investor Relations
Tel: +1.604.609.6185
Email: daniel@li-ft.com
Website: www.li-ft.com
Cautionary Statement Regarding Forward-Looking Information
Certain statements included in this press release constitute forward-looking information or statements (collectively, "forward-looking statements"), including those identified by the expressions "anticipate", "believe", "plan", "estimate", "expect", "intend", "may", "should" and similar expressions to the extent they relate to the Company or its management. The forward-looking statements are not historical facts but reflect current expectations regarding future results or events. This press release contains forward-looking statements. These forward-looking statements and information reflect management's current beliefs and are based on assumptions made by and information currently available to the Company with respect to the matter described in this new release.
Forward-looking statements involve risks and uncertainties, which are based on current expectations as of the date of this release and subject to known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied by such statements. Additional information about these assumptions and risks and uncertainties is contained under "Risk Factors and Uncertainties" in the Company's latest annual information form filed on March 30, 2023, which is available under the Company's SEDAR+ profile at www.sedarplus.ca, and in other filings that the Company has made and may make with applicable securities authorities in the future. Forward-looking statements contained herein are made only as to the date of this press release and we undertake no obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law. We caution investors not to place considerable reliance on the forward-looking statements contained in this press release.
Neither the Canadian Securities Exchange (the "CSE") nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/183694
FAQ
What are the highlights of the drill results?
How many drill holes have been reported so far?