Largo Announces Third Quarter 2022 Production and Sales Results Highlighted by Record High Purity Vanadium Production; Completes Battery Stack Manufacturing for its 6.1 MWh VCHARGE VRFB Deployment in Spain
Largo Inc. reported Q3 2022 production of 2,906 tonnes of vanadium pentoxide (V2O5) equivalent, a decrease from 3,260 tonnes in Q3 2021 due to a mining contractor transition and kiln refurbishment. The company achieved a record 962 tonnes of high purity V2O5 production, accounting for 33% of total output. V2O5 equivalent sales increased to 2,796 tonnes despite shipping delays. Average price per lb of V2O5 fell by 12% year-over-year. Construction of an ilmenite concentration plant continues, while the energy storage division progresses with the deployment of vanadium redox flow batteries.
- Record production of high purity V2O5 equivalent: 962 tonnes, 33% of total production.
- Sales of V2O5 equivalent increased, reaching 2,796 tonnes versus 2,685 tonnes in Q3 2021.
- Progress in construction of ilmenite concentration plant; commissioning expected by Q2 2023.
- Advancements in energy storage with successful delivery of battery components.
- Lower quarterly production of V2O5 equivalent at 2,906 tonnes compared to 3,260 tonnes in Q3 2021.
- Average benchmark price per lb of V2O5 decreased by 12% from Q3 2021, affecting revenue.
- Global recovery rate dropped to 80.7%, down from 83.7% in Q3 2021.
Q3 2022 and Other Highlights
- V2O5 production of 2,906 tonnes (6.4 million lbs1) vs. 3,260 tonnes produced in Q3 2021; Lower quarterly production due to a planned kiln and cooler refractory refurbishment and a change of mining contractor, but was in line with the Company’s revised production guidance
-
Record high purity V2O5 equivalent production of 962 tonnes, representing
33% of the Company’s Q3 2022 production -
V2O5 equivalent sales of 2,796 tonnes (inclusive of 351 tonnes of purchased material) vs. 2,685 tonnes sold in Q3 2021; Completed first high purity V2O3 sale in
Europe in Q3 2022 -
Average benchmark price per lb of V2O5 in
Europe of , a$8.23 12% decrease from the average of in Q3 2021; High purity vanadium demand has increased following ongoing recovery from 2020 COVID-19 impacts, which was partially offset by a softening of steel demand in Q3 2022$9.40 - The Company advanced construction of its ilmenite concentration plant, including receiving all required metallic flotation structures and building of desliming, flotation, filtration, warehouse and pipe rack structures; Expects commissioning completed in Q2 2023
-
Largo Clean Energy (“LCE”) progressed with the delivery of its Enel Green Power España (“EGPE”) VCHARGE vanadium redox flow battery (“VRFB”), including the manufacturing of all high-power battery stacks required for the system; The Company has begun shipping battery stacks and electrolyte to the deployment site in Mallorca,
Spain -
Largo Physical Vanadium Corp. (“LPV”) commenced trading on the
TSX Venture Exchange onSeptember 27, 2022 under the symbol “VAND” and launched a new website www.lpvanadium.com -
Published inaugural Climate Report aligned with the
Taskforce on Climate-Related Financial Disclosures (TCFD), providing additional transparency on the Company’s approach to climate change
Construction of Largo’s ilmenite concentration plant progressed in Q3 2022, including the building of desliming, flotation, filtration, warehouse and pipe rack structures. (Photo: Business Wire)
He concluded: “In October, we published our inaugural Climate Report aligned with the
MaracásMenchen Mine Operational and Sales Results
Q3 2022 |
Q2 2022 |
Q1 2022 |
Q3 2021 |
|
|
|
|
|
|
Total Ore Mined (tonnes) |
351,450 |
378,273 |
303,652 |
366,484 |
Ore Grade Mined - Effective Grade (%)2 |
1.02 |
1.18 |
1.27 |
1.10 |
|
|
|
|
|
Concentrate Produced (tonnes) |
99,513 |
124,317 |
92,324 |
113,879 |
Grade of Concentrate (%) |
3.26 |
3.28 |
3.21 |
3.32 |
Global Recovery (%)3 |
80.7 |
81.8 |
77.5 |
83.7 |
|
|
|
|
|
V2O5 produced (Flake + Powder) (tonnes) |
2,906 |
3,084 |
2,442 |
3,260 |
V2O5 produced (equivalent pounds) 1 |
6,406,626 |
6,799,048 |
5,383,682 |
7,187,061 |
Total V2O5 equivalent sold (tonnes) |
2,796 |
3,291 |
2,232 |
2,685 |
Produced V2O5 equivalent sold (tonnes) |
2,445 |
2,783 |
2,153 |
2,549 |
Purchased V2O5 equivalent sold (tonnes) |
351 |
508 |
79 |
136 |
|
|
|
|
|
Q3 2022 Overview
-
Q3 2022 Production Includes Increased Production of High Purity Material: V2O5 equivalent production from the MaracásMenchen Mine was 811 tonnes in July, 1,140 tonnes in August and 955 tonnes in September for a total of 2,906 tonnes produced in Q3 2022. Production in July was impacted by a refractory refurbishment in the kiln and cooler with production in September being largely impacted by a lower amount of mined material due to the transition of mining contractors, which was completed in September. The transition to a new mining contractor was required to ensure compliance with the Company’s mining plan after a reduced quantity of material was removed in previous quarters due, in part, to performance issues with the former service provider. In Q3 2022, 962 tonnes of high purity V2O5 equivalent was produced, representing
33% of Q3 2022 production and the highest quarterly amount of high purity material produced by the Company to date. In Q3 2022, global recoveries3 averaged80.7% , representing a4% decrease over the average in Q3 2021, mainly due to the reasons noted above. In Q3 2022, 351,450 tonnes of ore were mined with an effective grade2 of1.02% of V2O5. The lower ore mined and effective grade2 during the quarter was due to the mining contractor transition. The Company produced 99,513 tonnes of concentrate with a V2O5 grade of3.26% .
-
Commercial and Vanadium Market Update: In Q3 2022, the Company sold 2,796 tonnes of V2O5 equivalent (Q3 2021 – 2,685 tonnes), including 351 tonnes of purchased products (Q3 2021 – 136 tonnes). Lower sales in Q3 2022 are largely attributable to weaker spot demand during the quarter as well as ongoing shipment delays. The Company delivered both standard grade and high purity V2O5, as well as ferrovanadium (“FeV”) to customers and completed its first high purity V2O3 sale in
Europe in Q3 2022. Demand in the steel market softened in Q3 2022 due to geopolitical uncertainties and concerns over energy prices and availability—most notably inEurope . However, high purity vanadium demand remains steady and is continuing to recover from the lows of 2020, supported by renewed optimism in the travel and aerospace industries.
-
EGPE 6.1 MWh VCHARGE Deployment: The Company’s EGPE VCHARGE VRFB continues to be the primary focus of LCE. All high-power battery stacks have been manufactured and the Company has proceeded with factory acceptance testing. The required battery stack containers are fully assembled, and final validation and factory acceptance testing remains ongoing. Additionally, the required electrolyte storage containers are progressing through the final painting, lining and integration process. A majority of the required alternating current ("AC") components have been manufactured and factory-accepted, and shipment to the deployment site has begun. The battery deployment site is under construction and LCE expects to begin equipment installation in
November 2022 . LCE continues to experience a number of shipping and logistical delays related to certain components for its EGPE VRFB deployment. However, management of LCE are monitoring the situation closely and expect the commissioning of the EGPE VRFB to be completed by the end of Q1 2023.
-
Interconnection of a 3 MWh Demonstration VRFB in
Shirley, Massachusetts : In Q3 2022, LCE and National Grid completed grid interconnection of a 3 megawatt-hour demonstration VRFB inShirley, Massachusetts (previously installed by VionX Energy and commissioned by LCE). National Grid completed the final witness test in August and approved LCE's interconnection to the grid in mid-September. Since then, LCE has successfully operated the Shirley VRFB on the grid and the battery will be used to further optimize performance of the solar shifting application going forward.
About Largo
Largo has a long and successful history as one of the world’s preferred vanadium companies through the supply of its VPURETM and VPURE+TM products, which are sourced from one of the world's highest-grade vanadium deposits at the Company's Maracás
Largo’s common shares trade on the
Cautionary Statement Regarding Forward-looking Information:
This press release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian and
Trademarks are owned by
1 |
Conversion of tonnes to pounds, 1 tonne = 2,204.62 pounds or lbs. |
|
2 |
Effective grade represents the percentage of magnetic material mined multiplied by the percentage of V2O5 in the magnetic concentrate. |
|
3 |
Global recovery is the product of crushing recovery, milling recovery, kiln recovery, leaching recovery and chemical plant recovery. |
View source version on businesswire.com: https://www.businesswire.com/news/home/20221017005340/en/
For further information:
Investor Relations
Senior Manager, External Relations
+1.416.861.9778
aguthrie@largoinc.com
Source:
FAQ
What were Largo Inc.'s production figures for Q3 2022?
How did sales perform for Largo Inc. in Q3 2022?
What challenges affected Largo Inc.'s production in Q3 2022?
What is the expected completion date for Largo's ilmenite concentration plant?
How did the price of V2O5 change in Q3 2022?